会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明申请
    • INSULATED CONCRETE COMPOSITE WALL SYSTEM
    • 绝缘混凝土复合墙系统
    • US20160305121A1
    • 2016-10-20
    • US14875636
    • 2015-10-05
    • Michael Niemann
    • Michael Niemann
    • E04C2/288E04B2/10E04B2/68E04C2/34E04B2/00
    • E04B2/68E04B1/165E04B1/20E04B1/61E04B1/7604E04B1/7658E04B1/80E04B2/10E04B2/48E04B2/54E04B2/562E04B2/8629E04B2001/742E04B2103/02E04B2103/04E04C2/205E04C2/22E04C2/28E04C2/288E04C2/30E04C2/34E04C2/38E04C2/46E06B1/24E06B1/36G06F17/5004
    • A new prefabricated wall panel is the basic unit of a new, more efficient and stronger wall system. The wall panel is manufactured from a plurality of foam sections sized to leave vertical and horizontal voids into which concrete is later poured, each foam section having an inner and outer surface and two sides; and a plurality of fastening strips. The fastening strips are longitudinal metal strips being situated between the sides of two foam sections. Each fastening strip has two longitudinal fastening strips projecting perpendicularly to the longitudinal fastening strip and the fastening strips being adjacent to the outer surface of the two foam sections. The fastening strip also has a plurality of clearance holes in the longitudinal fastening strip, a plurality of embed tabs projecting from the edge opposite the fastening strips, each embed tab having at least one hole, and between each pair of embed tabs, a foam tab to hold the two inner sides of the foam sections in place and partially separate the foam sections from the concrete to be poured into a form.
    • 一个新的预制墙板是新的,更有效和更强的墙体系统的基本单位。 壁板由多个泡沫部分制成,尺寸为留下垂直和水平的空隙,混凝土随后被倒入其中,每个泡沫部分具有内表面和外表面以及两侧; 和多个紧固条。 紧固带是位于两个泡沫部分的侧面之间的纵向金属条。 每个紧固带具有垂直于纵向紧固条突​​出的两个纵向紧固条,并且紧固带邻近两个泡沫部分的外表面。 所述紧固条还在所述纵向紧固条中具有多个间隙孔,从与所述紧固条相对的边缘突出的多个嵌入片,每个嵌入片具有至少一个孔,并且在每对嵌入片之间, 将泡沫部分的两个内侧保持在适当位置,并将泡沫部分与混凝土部分地分开以便被浇注成形式。
    • 8. 发明授权
    • External wall with plaster and plaster carrier
    • 外墙与石膏和石膏载体
    • US09297165B2
    • 2016-03-29
    • US14234138
    • 2012-08-17
    • Ola Øystein Thorsnes
    • Ola Øystein Thorsnes
    • E04B9/00E04F13/02E04F13/04E04B1/74E04F21/08
    • E04F13/02E04B1/74E04B2001/742E04F13/04E04F13/047E04F21/08
    • A method for applying plaster to an external wall (1), wherein a plaster carrier in the form of plates (2) is attached to a lathwork or corresponding spacer elements (8, 14) on the external side of the wall (1), whereupon the plaster is applied in a substantially continuous surface extending over joints (9, 13) between the plates (2). For the plaster carrier, a composite plate (2) is used comprising a central supporting layer (4) of insulating material and an inner and outer reinforced, fire retardant plaster layer (5, 6) on either side of the supporting layer (4). The plaster carrier plates (2) are attached to the wall (1) by means of fastening devices (10) which are inserted through the plaster carrier plates (2) from the outside, a reinforcement (11) is placed over the joints (9, 13) between the plaster carrier plates (2) and at least some of the fastening devices (10), and a finishing plaster layer is applied to said reinforcement (11) and the outer plaster layer (6).
    • 一种将石膏施加到外壁(1)的方法,其中板(2)形式的石膏载体附接到壁(1)的外侧上的板条或相应的间隔元件(8,14) 于是石膏被施加在基板之间延伸的基本上连续的表面(9,13)之间。 对于石膏载体,使用复合板(2),其包括绝缘材料的中心支撑层(4)和在支撑层(4)的任一侧上的内部和外部增强的阻燃石膏层(5,6) 。 石膏托板(2)通过紧固装置(10)附接到壁(1)上,紧固装置(10)从外部插入通过石膏托板(2),加强件(11)放置在接头(9)上 ,13)在所述石膏承载板(2)和至少一些所述紧固装置(10)之间,并且将精整石膏层施加到所述加强件(11)和所述外层石膏层(6)。