会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明公开
    • 반도체 집적회로
    • 半导体集成电路
    • KR1020100080480A
    • 2010-07-08
    • KR1020090134547
    • 2009-12-30
    • 에스케이하이닉스 주식회사
    • 이준호이형동김현석
    • G11C5/14G11C7/10
    • H01L23/5286H01L2924/0002H01L2924/00
    • PURPOSE: A semiconductor integrated circuit is provided to maintain a stable power supply level by reducing voltage drop on a metal wire and package inductance. CONSTITUTION: A first power mesh supplies a first power to a first internal circuit. A second power mesh supplies a second power to a second internal circuit. The second power has the same DC level as the first power. A connection part connects the first and the second power mesh. The connection part comprises the first power mesh and a metal wiring(5) connecting the first power mesh. The first power mesh supplies a first external power to a first internal circuit. The second power mesh supplies a second external power to a second internal circuit. The first and second power mesh are electrically connected to each other.
    • 目的:提供半导体集成电路,通过减少金属线和封装电感的电压降来保持稳定的电源电平。 构成:第一个电源网为第一个内部电路提供第一个电源。 第二功率网将第二功率提供给第二内部电路。 第二功率与第一功率具有相同的直流电平。 连接部分连接第一和第二功率网。 连接部分包括第一电源网和连接第一电力网的金属布线(5)。 第一个电源网为第一个内部电路提供第一个外部电源。 第二电源网为第二内部电路提供第二外部电源。 第一和第二电力网彼此电连接。
    • 10. 发明授权
    • IMT-2000 기지국 시스템내 BCP의 새로운 기지국프로그램 로딩 방법
    • IMT-2000中文系统BCP中文版
    • KR100389741B1
    • 2003-07-02
    • KR1020000076900
    • 2000-12-15
    • 에스케이하이닉스 주식회사
    • 이준호
    • H04W88/08
    • PURPOSE: A method for loading a new base station program to a BCP(BTS Control Processor) in an IMT-2000 base station system is provided to supply more high-quality mobile services to users by enabling a base station program of a new version to be loaded without interrupting services. CONSTITUTION: A stand-by BCP in a base station receives a restart command and a new base station program from a BSM(Base Station Manager) through a CCP(Call Control Processor) in a BSC(Base Station Controller)(S1). While being transferred into an active operation state, the stand-by BCP executes the operation of the new base station program(S2). The stand-by BCP judges whether abnormality is generated from the new base station program(S3). In case that the new base station program is operated normally, the active BCP receives a new base station program, identical to the program loaded to the stand-by BCP, from the CCP(S4). Meanwhile, if the new base station program loaded to the stand-by BCP is not operated normally, the stand-by BCP receives a base station program, identical to the former base station program loaded to the active BCP, from the CCP(S5).
    • 目的:提供一种用于将新基站程序加载到IMT-2000基站系统中的BCP(BTS控制处理器)的方法,以通过使新版本的基站程序能够向用户提供更高质量的移动服务 无需中断服务即可加载。 组成:基站中的备用BCP通过BSC(基站控制器)(S1)中的CCP(呼叫控制处理器)从BSM(基站管理器)接收重新启动命令和新的基站程序。 待转移到活动操作状态时,备用BCP执行新基站程序的操作(S2)。 备用BCP判断新基站程序是否产生异常(S3)。 如果新基站程序正常运行,则活动BCP从CCP(S4)接收与加载到备用BCP的程序相同的新基站程序。 同时,如果加载到备用BCP的新基站程序没有正常操作,备用BCP从CCP(S5)接收与加载到活动BCP的前一基站程序相同的基站程序, 。