    • 2. 发明专利
    • Dehydrator of excavated earth and sand
    • 挖掘土地和砂土的脱水机
    • JP2008229611A
    • 2008-10-02
    • JP2007324096
    • 2007-12-15
    • Bando Chem Ind LtdOhbayashi Corpバンドー化学株式会社株式会社大林組
    • YASHIRO TSUTOMUTANAKA YOSHIHIROMIKI KEIZOKITAOKA TAKASHIFUKUMOTO KATSUJISAKAMOTO MASAAKITORIIHARA MAKOTOYAMADA YUKITERAYAMA YOSHIHIDE
    • C02F11/12B01D33/04B30B9/24E21D9/13
    • PROBLEM TO BE SOLVED: To efficiently dehydrate excavated earth and sand while supporting transportation load of the excavated earth and sand and further preventing clogging by the excavated earth and sand. SOLUTION: A belt conveyer 1 is constituted of a dehydration mechanism 1a and a pressurization mechanism 1b. In the dehydration mechanism 1a, a water permeable belt 2 and a water permeable sheet 3 are constituted so that transportation speeds of both may become equal and further a rear face of the water permeable sheet 3 is superposed on a surface of the water permeable belt 2 in a transportation region A. A pressurizing belt 32 of the pressurization mechanism 1b is arranged so that its circulation pathway circulates inversely to circulation pathways of the water permeable belt 2 and of the water permeable sheet 3 and the pressurization mechanism 1b is equipped with a pair of transit angle adjusting rollers 35, 35 for adjusting a transit angle of the pressurizing belt 32 so that the pressurizing belt 32 is apart from a surface of the water permeable sheet 3 only by a predetermined distance in the transportation region A and a pressurizing roller 36 arranged between a pair of transit angle adjusting rollers. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了有效地脱水开挖的沙土,同时支撑挖土砂的运输负荷,进一步防止被挖土的沙土堵塞。 皮带输送机1由脱水机构1a和加压机构1b构成。 在脱水机构1a中,透水性带2和透水性片3构成为使得两者的输送速度相等,并且在透水性带2的表面上再叠放透水性片3的背面 在输送区域A中。加压机构1b的加压带32布置成使其循环路径与透水性带2和透水性片材3的循环路径相反地循环,并且加压机构1b配备有一对 用于调节加压带32的转弯角度的过渡角调节辊35,35,使得加压带32在输送区域A和加压辊36之间距离透水性纸3的表面仅隔一定距离 布置在一对过渡角调节辊之间。 版权所有(C)2009,JPO&INPIT
    • 4. 发明专利
    • Shield machine
    • 屏蔽机
    • JP2004068349A
    • 2004-03-04
    • JP2002227203
    • 2002-08-05
    • Ohbayashi Corp株式会社大林組
    • MURAYAMA KENYAMIYA KIYOSHIUEDA HISATERUKITAOKA TAKASHI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To reduce the generation of cracks by suppressing lateral forces acting on segments.
      SOLUTION: A shield machine 10 is provided with an excavating body 12 and a cutter head 14. A thrusting shield jack 30 is provided in the excavating body 12. A spreader 50 abutting against a segment 32 is disposed at the extensible end of the shield jack 30. A section where the spreader 50 abuts against the segment 32 is made slidable along the radial direction of a tunnel. The spreader 50 has a body 50a fixed to the end of the extensible plunger 30b, an abutting plate 50b slidably supported by the body 50a in the radial direction of the tunnel and abutting against the segment 32 when the plunger 30b is stretched, and a sliding member 50c interposed between the body 50a and the abutting plate 50b.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:通过抑制作用在段上的横向力来减少裂纹的产生。 解决方案:屏蔽机10设有挖掘机体12和切割头14.在挖掘机体12内设有推进屏蔽千斤顶30.一个伸展部分50与一个分段32相邻, 屏蔽插孔30.使扩展器50抵靠于段32的部分可沿着隧道的径向方向滑动。 扩展器50具有固定在可伸缩柱塞30b的端部的主体50a,邻接板50b,其沿着隧道的径向可滑动地被主体50a支撑并且当柱塞30b被拉伸时抵靠在段32上 构件50c插入在主体50a和抵接板50b之间。 版权所有(C)2004,JPO
    • 6. 发明专利
    • Shield tunnel
    • 屏蔽隧道
    • JP2003035096A
    • 2003-02-07
    • JP2001223939
    • 2001-07-25
    • Ohbayashi Corp株式会社大林組
    • KANAI MAKOTOKITAOKA TAKASHI
    • E21D11/04
    • PROBLEM TO BE SOLVED: To lengthen an installation interval between center posts without causing an increase in cost, an decrease in workability or the like. SOLUTION: This shield tunnel is equipped with the first and second shield tunnels 10 and 12 whose circular cross sections are equal in diameter to each other, and the circular cross sections are made to overlap each other in a double state. The tunnels 10 and 12 are formed by assembling segments 16, which are split in the axial and circumferential directions of the tunnel, on an excavated surface formed on the rear side of the excavator 14 by excavation of the excavator 14. The tunnel is arranged in such a manner that ends of the circular cross sections overlap each other; an overlapped part is cut off; and upper and lower coupling segment pieces 18 and 20 are arranged in upper and lower joining parts between the segments 16 of the adjacent tunnels 10 and 12. The amount of protrusion of the segment piece 18 to a lower side varies with each segment ring. When the segment pieces 18 are installed in such a manner as to be sequentially adjacent to one another in the axial direction of the tunnel, so as to form an upper beam part 22 of the segments 16, side surfaces along the axial direction of the tunnel are formed in a shape of arches having a prescribed interval in between.
    • 要解决的问题:延长中心支柱之间的安装间隔,而不会导致成本增加,可加工性等的降低。 解决方案:该屏蔽隧道配备有第一和第二屏蔽隧道10和12,其圆形横截面彼此直径相等,并且圆形横截面在双重状态下彼此重叠。 隧道10和12通过在挖掘机14的挖掘中组装在挖掘机14的后侧的挖掘表面上组装在隧道的轴向和圆周方向上分裂的段16来形成。隧道被布置在 圆形横截面的端部彼此重叠的方式; 重叠部分被切断; 并且上部和下部联接段18和20布置在相邻的隧道10和12的段16之间的上部和下部接合部分中。段段18向下侧的突出量随着每个环形环而变化。 当片段18沿隧道的轴向依次相邻地安装时,形成段16的上梁部22,沿着隧道的轴向的侧面 形成为具有规定间隔的拱形的形状。