会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • HYDRAULIC CONTROL SYSTEM FOR A SWIVELING CONSTRUCTION MACHINE
    • 一种旋转式施工机械液压控制系统
    • WO2009023199A1
    • 2009-02-19
    • PCT/US2008/009648
    • 2008-08-12
    • CLARK EQUIPMENT COMPANYBREUER, James, M.WETZEL, Michael, D.LIEBEL, Alvin, A.
    • BREUER, James, M.WETZEL, Michael, D.LIEBEL, Alvin, A.
    • E02F9/12E02F9/22
    • E02F3/7613E02F3/7618E02F3/964E02F9/128E02F9/2267E02F9/2271E02F9/2285
    • A hydraulic control system (230) for a swiveling construction machine (200) includes at least one hydraulic travel motor (232), a first hydraulic actuation device (227), a second hydraulic actuation device (229) and a hydraulic diverter valve assembly (240). The at least one hydraulic travel motor (232) is configured to move the swiveling construction machine (200) in a first travel speed and a second travel speed based on a variable pilot pressure signal (233). The first hydraulic actuation device (227) is configured to actuate a first function of an implement (228). The second hydraulic actuation device (229) is configured to actuate a second function of an implement (228). The hydraulic diverter valve assembly (240) is configured to divert hydraulic power between the first hydraulic actuation device (227) and the second hydraulic actuation device (229) while maintaining operation of the at least one hydraulic travel motor (232) in one of the first and the second speeds.
    • 一种用于旋转建筑机械(200)的液压控制系统(230)包括至少一个液压行进马达(232),第一液压驱动装置(227),第二液压驱动装置(229)和液压转向阀组件 240)。 所述至少一个液压行进马达(232)构造成基于可变先导压力信号(233)以第一行进速度和第二行进速度移动所述旋转施工机械(200)。 第一液压致动装置(227)构造成致动工具(228)的第一功能。 第二液压致动装置(229)构造成致动工具(228)的第二功能。 液压转向阀组件(240)构造成在第一液压驱动装置(227)和第二液压致动装置(229)之间转移液压动力,同时将至少一个液压行进马达(232)的运行保持在 第一和第二速度。