    • 1. 发明专利
    • Supporting structure of foundation pile and construction method of foundation pile
    • 基础桩支撑结构和基础桩施工方法
    • JP2006249928A
    • 2006-09-21
    • JP2006175740
    • 2006-06-26
    • Jfe Steel KkJfeスチール株式会社
    • WAKIYA HIROSHITATSUMI YUUICHI
    • E02D5/56E02D7/22
    • PROBLEM TO BE SOLVED: To provide a supporting structure of a foundation pile capable of providing a high tip support force even if a large blade is not installed and a construction method of the foundation pile capable of easily constructing the supporting structure.
      SOLUTION: This supporting structure of the foundation pile comprises a steel pipe pile having a projection of 4 mm or longer in height on the tip part outer periphery thereof and a foot protection column formed in the support layer of the ground or in the district of the ground including the support layer and allowing the tip part of the steel pipe pile to be inserted therein to be formed integrally with each other.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供即使没有安装大刀片也能够提供高尖端支撑力的基础桩的支撑结构,并且能够容易地构造支撑结构的基础桩的施工方法。 解决方案:该基础桩的该支撑结构包括在其顶端部外周上具有高度为4mm或更长的突起的钢管桩和形成在地面的支撑层中的脚保护柱 包括支撑层的地面区域,并且允许钢管桩的顶端部分插入其中以形成为一体。 版权所有(C)2006,JPO&NCIPI
    • 2. 发明专利
    • Connection method of steel pipe
    • 钢管连接方法
    • JP2006152796A
    • 2006-06-15
    • JP2005323325
    • 2005-11-08
    • Ideal Brain KkJfe Steel KkJfeスチール株式会社アイディールブレーン株式会社
    • SATO TAKANORIWAKIYA HIROSHITAKANO KIMIHISA
    • E02D5/24E04B1/24E04B1/58
    • PROBLEM TO BE SOLVED: To provide a connection method of pipes capable of facilitating the handling of steel plates for connection, increasing working efficiency, and reducing cost.
      SOLUTION: In this connection method for the steel pipes, the steel pipes 1 and 2 coaxially connected to each other are held by the steel plates 3 and 4 for connection which are internally and externally brought into contact with the connection portion 2 of the steel pipes and the steel pipes are tightened to the steel plates for connection internally and externally brought into contact with the connection portion with bolts 5 passed therethrough from the outside. The steel plates 3 and 4 are properly divided in the circumferential direction, and bolt insertion holes 6 are partitioned by a slit 7 for releasing deformation.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供能够方便连接钢板处理的管道的连接方法,提高工作效率并降低成本。 解决方案:在这种钢管连接方法中,同轴连接的钢管1和2由连接部分2的内部和外部接触的钢板3和4保持 钢管和钢管被紧固到钢板上,用于连接内部和外部,从外部通过螺栓5与连接部分接触。 钢板3和4在圆周方向上被适当地分开,并且螺栓插入孔6被用于释放变形的狭缝7分隔开。 版权所有(C)2006,JPO&NCIPI
    • 3. 发明专利
    • Pile head joining structure
    • 桩头接合结构
    • JP2005264666A
    • 2005-09-29
    • JP2004082915
    • 2004-03-22
    • Jfe Steel KkJfeスチール株式会社
    • ONDA KUNIHIKOWAKIYA HIROSHINAGAYAMA HIDEAKITAKANO KIMIHISA
    • E02D5/34E02D27/12E02D27/34
    • PROBLEM TO BE SOLVED: To provide a pile head joining structure capable of providing a highly rigid and strong structure even when the ground is soft and a large horizontal force is applied thereto, manufacturable at low cost, and having excellent construction efficiency.
      SOLUTION: In this pile head joining structure for joining the head of a pile 10 to a footing 13 by burying the head of the pile 10 into the footing 13, the pile 10 comprises a pile body 11, an outer tube 12 inserted into the upper end of the pile body 11, and a filler receiving member 15 disposed between the outer tube 12 and the pile body 11 and receiving a filler 14 filled between the outer tube 12 and the pile body 14. The pile 10 also comprises a moment load transmission means 18 reducing the strength of the head of the outer tube 12 to the footing 13 in the vertical direction less than that of the pile body 11 to the footing and transmitting a moment load to the head of the outer tube 12.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供即使在地面柔软且施加大的水平力的情况下也能够提供高刚性和坚固结构的桩头接合结构,可以低成本制造并且具有优异的施工效率。 解决方案:在这种用于通过将桩10的头部埋入基脚13中将桩10的头部连接到基脚13的桩头接合结构中,桩10包括桩体11,插入的外管12 进入桩体11的上端,以及填充物接收构件15,其设置在外管12和桩体11之间,并且容纳填充在外管12和桩体14之间的填料14.桩10还包括 力矩载荷传递装置18将垂直方向上的外管12的头部的距离小于桩体11的强度降低到基脚,并将力矩载荷传递到外管12的头部。 P>版权所有(C)2005,JPO&NCIPI
    • 9. 发明专利
    • Building method for composite friction pile
    • 复合摩擦片的建筑方法
    • JP2009057817A
    • 2009-03-19
    • JP2008200799
    • 2008-08-04
    • Jfe Steel KkJfeスチール株式会社
    • WAKIYA HIROSHIUSAMI SHUNSUKEKONO KENJITACHIKA HISAKAZU
    • E02D5/46
    • PROBLEM TO BE SOLVED: To build a composite friction pile of a large diameter without using a heavy machinery.
      SOLUTION: In a method for building a composite friction pile, wherein the ground is excavated in a columnar shape and cement milk and the excavated soil are mixed for making a columnar body into which an existing pile as a core material is erected before the soil cement is hardened, the existing pile 2 has a larger diameter than the columnar body has. Furthermore, a plurality of the columnar bodies are connected to each other in such a way as to cover the whole circumference of the cross section of the existing pile, so as to build a composite friction pile 1a-1f.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:在不使用重型机械的情况下建造大直径的复合摩擦桩。 解决方案:在一种用于建造复合摩擦桩的方法中,其中将地面以柱状形式挖出,并且将水泥浆和挖掘的土壤混合以制造柱状体,在其中竖立现有的作为芯材料的桩,之前 土壤水泥硬化,现有的桩2具有比柱状体更大的直径。 此外,多个柱状体以覆盖现有桩的横截面的整个周长的方式彼此连接,从而构成复合摩擦桩1a-1f。 版权所有(C)2009,JPO&INPIT
    • 10. 发明专利
    • Pile head structure of double tube type
    • 双管型双头结构
    • JP2009046881A
    • 2009-03-05
    • JP2007213902
    • 2007-08-20
    • Jfe Steel KkJfeスチール株式会社
    • OKA YOSHITAKEHAYASHI MASAHIROICHIKAWA KAZUOMIWAKIYA HIROSHI
    • E02D27/00E02D5/34
    • PROBLEM TO BE SOLVED: To provide an economical pile head structure of double tube type using a pile having small diameter and capable of achieving excellent aseismic effect.
      SOLUTION: This pile head structure of double tube type is constituted by inserting an external pipe 2 having larger diameter than that of a head part of the steel pipe pile 1 into the head part and placing concrete to achieve such a condition that the head part of the steel pipe pile 1 and an upper end part of the external pipe 2 are buried into the concrete and integrate them. The head part of the steel pipe pile 1 is made to be lower than an upper end of the external pipe 2.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种使用具有小直径的桩并且能够获得优异的抗震效果的双管型经济的桩头结构。 解决方案:双管型桩头结构是通过将直径大于钢管桩1的头部直径的外管2插入头部而构成的,并且使混凝土达到如下条件: 将钢管桩1的头部和外管2的上端部埋入混凝土中并使其一体化。 钢管桩1的头部被制成低于外管2的上端。版权所有(C)2009,JPO&INPIT