会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Cut-off structure of segment for tunnel
    • TUNNEL分段切割结构
    • JP2007224498A
    • 2007-09-06
    • JP2006043428
    • 2006-02-21
    • Jfe Metal Products & Engineering IncJfe Steel KkJfeスチール株式会社Jfe建材株式会社
    • SUDO OSAMUHAYASHI NOBUOMASUBUCHI TAKESHINAKANISHI KATSUYOSHINAGAYAMA HIDEAKIOKADA ATSUSHI
    • E21D11/04E21D11/14
    • PROBLEM TO BE SOLVED: To provide a cut-off structure of a segment for a tunnel which can surely prevent the leakage of water from a connecting part by means of a simple structure, when the segment for the tunnel is provided in such a manner that an axial-direction-of-tunnel wall as a main girder is composed of a steel pipe and channel steel. SOLUTION: This cut-off structure comprises: axial walls W 1 and W 2 which are composed of a pair of steel pipes 1a and 1b formed in approximate arc shapes along the circumferential direction of the tunnel; a back plate 2 which is joined to the axial walls W 1 and W 2 ; and circumferential walls 4 and 5 which are joined to the axial walls W 1 and W 2 and both ends of the back plate 2, respectively. Sealing grooves 7 for attaching a sealing member 8 are formed on the axial walls W 1 and W 2 and the outer wall surfaces of the circumferential walls 4 and 5. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了提供一种用于隧道的截面结构,其可以通过简单的结构可靠地防止水从连接部分泄漏,当用于隧道的段被设置在这样 作为主梁的隧道纵向轴方向由钢管和槽钢构成。

      解决方案:该截止结构包括:由一对形成为大致圆弧形状的一对钢管1a和1b组成的轴向壁W 1 和W 2 沿隧道的圆周方向; 接合到轴向壁W 1 SB 2和W SB 2的背板2; 以及分别与背板2的轴向壁W 1,W 2和SB 2两端连接的周向壁4和5。 用于安装密封构件8的密封槽7形成在轴向壁W 1 SB 1和W SB 2上以及周壁4和5的外壁表面上。 版权所有(C)2007,JPO&INPIT

    • 2. 发明专利
    • Segment for tunnel and its manufacturing method
    • 隧道分段及其制造方法
    • JP2007162452A
    • 2007-06-28
    • JP2006167559
    • 2006-06-16
    • Jfe Metal Products & Engineering IncJfe Steel KkJfeスチール株式会社Jfe建材株式会社
    • NAKANISHI KATSUYOSHINAGAYAMA HIDEAKIHAYASHI NOBUOSUDO OSAMUWADA SATOSHIMASUBUCHI TAKESHI
    • E21D11/14
    • PROBLEM TO BE SOLVED: To provide a segment for a tunnel and a manufacturing method of the segment simple in structure with a small number of components and in consequence easily manufactured to shorten a manufacturing time and to reduce cost and moreover excelling in working efficiency.
      SOLUTION: A plurality of segments for the tunnel are arranged in circumferential and axial directions of the tunnel and connected to one another to form a tunnel wall. The segment has a pair of axial walls W
      1 , W
      2 having a spaces in the axial direction of the tunnel; an inner peripheral plate 2a or an outer peripheral plate 2b joined to the axial walls W
      1 , W
      2 ; and circumferential walls 5 joined to the axial walls W
      1 , W
      2 and both ends of the inner peripheral plate 2a or the outer peripheral plate 2b. The pair of axial walls W
      1 , W
      2 are formed of steel pipes 1a, 1b.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了提供用于隧道的段和具有少量部件的结构简单的部分的制造方法,并且因此容易制造以缩短制造时间并降低成本并且进一步优良的工作 效率。 解决方案:用于隧道的多个段被布置在隧道的周向和轴向上并且彼此连接以形成隧道壁。 该段具有在隧道的轴向方向上具有空间的一对轴向壁W 1 2 与轴向壁W 1连接的内周板2a或外周板2b,W 2 。 以及与内壁板2a或外周板2b的轴向壁W 1,W SB 2和SB两端连接的周壁5。 一对轴向壁W 1 W 2 由钢管1a,1b形成。 版权所有(C)2007,JPO&INPIT
    • 3. 发明专利
    • Pile head joining structure
    • 桩头接合结构
    • JP2005264666A
    • 2005-09-29
    • JP2004082915
    • 2004-03-22
    • Jfe Steel KkJfeスチール株式会社
    • ONDA KUNIHIKOWAKIYA HIROSHINAGAYAMA HIDEAKITAKANO KIMIHISA
    • E02D5/34E02D27/12E02D27/34
    • PROBLEM TO BE SOLVED: To provide a pile head joining structure capable of providing a highly rigid and strong structure even when the ground is soft and a large horizontal force is applied thereto, manufacturable at low cost, and having excellent construction efficiency.
      SOLUTION: In this pile head joining structure for joining the head of a pile 10 to a footing 13 by burying the head of the pile 10 into the footing 13, the pile 10 comprises a pile body 11, an outer tube 12 inserted into the upper end of the pile body 11, and a filler receiving member 15 disposed between the outer tube 12 and the pile body 11 and receiving a filler 14 filled between the outer tube 12 and the pile body 14. The pile 10 also comprises a moment load transmission means 18 reducing the strength of the head of the outer tube 12 to the footing 13 in the vertical direction less than that of the pile body 11 to the footing and transmitting a moment load to the head of the outer tube 12.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供即使在地面柔软且施加大的水平力的情况下也能够提供高刚性和坚固结构的桩头接合结构,可以低成本制造并且具有优异的施工效率。 解决方案:在这种用于通过将桩10的头部埋入基脚13中将桩10的头部连接到基脚13的桩头接合结构中,桩10包括桩体11,插入的外管12 进入桩体11的上端,以及填充物接收构件15,其设置在外管12和桩体11之间,并且容纳填充在外管12和桩体14之间的填料14.桩10还包括 力矩载荷传递装置18将垂直方向上的外管12的头部的距离小于桩体11的强度降低到基脚,并将力矩载荷传递到外管12的头部。 P>版权所有(C)2005,JPO&NCIPI
    • 5. 发明专利
    • Connecting structure and connecting method for tunnel segment
    • 连接隧道结构与连接方法
    • JP2007132076A
    • 2007-05-31
    • JP2005325834
    • 2005-11-10
    • Jfe Metal Products & Engineering IncJfe Steel KkJfeスチール株式会社Jfe建材株式会社
    • SUDO OSAMUHAYASHI NOBUOMASUBUCHI TAKESHINAGAYAMA HIDEAKINAKANISHI KATSUYOSHIOKADA ATSUSHI
    • E21D11/04
    • PROBLEM TO BE SOLVED: To provide a connecting structure and connecting a method for tunnel segments which enable the segments to be easily and surely connected to one another in a circumferential direction by mounting structurally simple joint members at both longitudinal ends of the segment, and can greatly reduce costs.
      SOLUTION: This structure comprises: a main body 11 in which a guiding groove 14 is formed between square cross-section side walls 12a and 12b formed in a longitudinal direction on both width-direction sides of a rectangular steel plate; and a joint member 10 which comprises an engaging part 15 formed of an engaging steel plate 16 and the guiding groove 14 in such a manner that the guiding groove 14 is covered with the engaging steel plate 16 on the side of one end of the main body 11, and an engaging protrusion 17 formed on the guiding groove 14 near the other end of the main body 11 and protruding to a height almost equal to the depth of the guiding groove 14 from top surfaces of the side walls 12a and 12b.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种连接结构,并且连接隧道段的方法,其使得能够通过在结构上简单的接合构件在段的两个纵向端处安装结构简单的接合构件,使得段能够沿圆周方向彼此容易且可靠地连接 ,并可大大降低成本。 解决方案:该结构包括:主体11,其在矩形钢板的宽度方向侧的纵向方向上形成的正方形横截面侧壁12a和12b之间形成有引导槽14; 以及接合构件10,其包括由接合钢板16和引导槽14形成的接合部15,导向槽14在主体一端的一侧被接合钢板16覆盖 11,以及在主体11的另一端附近形成在引导槽14上并且从侧壁12a和12b的顶面突出到几乎等于引导槽14的深度的高度的接合突起17。 版权所有(C)2007,JPO&INPIT