热词
    • 9. 发明专利
    • Speed governing system change over device
    • 速度管理系统改变设备
    • JPS6153407A
    • 1986-03-17
    • JP17408084
    • 1984-08-23
    • Hitachi Ltd
    • IKEDA HIROSHIKUWAJIMA HIDESUMIKUNO KATSUKUNI
    • F01D17/20F01D19/00
    • F01D19/00
    • PURPOSE:To control erosion and thermal stress by obtaining a change over device, capable of automatically performing throttling speed governing at starting time and shifting to nozzle cut-out speed governing without fear of generating load change and further performing nozzle cut-out speed governing even in medium and low load area. CONSTITUTION:At starting time of a steam engine, each speed governing change-over instrument 4a-4d is changed over to combined function operation instruments 2a-2d side and, after converting a flow signal from an output control operation instrument 1 into an opening requirement signal of combined governing by each operation instrument 2a-2d, said signal is inputted to steam adjusting valve opening/closing controllers 5a-5d. In case load is raised and a flow signal from the output control operation instrument 1 grows above correspondence with high load area and this condition is detected by a change-over command instrument 6, speed governing instruments 4a-4d are changed over to nozzle function operation instruments 3a-3d side by said change-over command instrument 6 at the time of inputting a change-over command signal. Nozzle cut- out speed governing operation is performed hereafter.
    • 目的:通过获得设备更换来控制侵蚀和热应力,能够在启动时自动执行节流调速,并切换到喷嘴切断调速,而不用担心产生负载变化,并进一步执行喷嘴切断速度控制 在中低负荷区域。 构成:在蒸汽发动机的起动时,各变速器4a-4d变换为组合的功能操作仪2a-2d侧,在将输​​出控制操作仪1的流量信号变换为开度要求 每个操作仪器2a-2d组合控制的信号,所述信号被输入到蒸汽调节阀打开/关闭控制器5a-5d。 如果负载升高并且来自输出控制操作装置1的流量信号与高负载区域相对应地增长,并且通过转换指令仪器6检测到该状态,则将调速器4a-4d切换到喷嘴功能操作 在输入转换指令信号时由所述转换指令仪器6的仪表3a-3d侧。 以下进行喷嘴切断调速运转。