会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Method of reinforcing through hole in beam
    • 通过孔加强光束的方法
    • JP2011174311A
    • 2011-09-08
    • JP2010039812
    • 2010-02-25
    • Katayama Stratec Kk片山ストラテック株式会社
    • FUJIHIRA SHOICHIROHASHIDA TOMOYUKINUMATA TOSHIYUKI
    • E04C3/08
    • PROBLEM TO BE SOLVED: To provide a method of reinforcing a through-hole formed in a beam by which the cost is reduced and fitting to the through-hole formed in a beam member is facilitated.
      SOLUTION: A ring-shaped reinforcing member 4 having an outer peripheral surface with an angle of inclination of 40°to 50° is cut out from a steel plate by gas cutting, laser cutting, plasma cutting or the like. An inclined surface 5 of the ring-shaped reinforcing member 4 is brought into contact with an inner surface of the through-hole formed in the beam member, and the part between a larger-diameter-side peripheral surface of the ring-shaped reinforcing member 4 and a surface of a web 3 of the beam member are temporarily welded at a plurality of positions in the peripheral direction. The inclined surface 5 of the ring-shaped reinforcing member 4 temporarily fixed to the web 3 of the beam member and the inner peripheral surface of the through-hole are welded and fixed by one-surface partial penetration welding.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种加强形成在梁中的通孔的方法,通过该方法降低成本并且容易地配合到形成在梁构件中的通孔。 解决方案:通过气体切割,激光切割,等离子切割等从钢板切出具有40°至50°倾斜角的外周表面的环形加强件4。 环形加强构件4的倾斜表面5与形成在梁构件中的通孔的内表面接触,并且环形加强构件的大直径侧周面之间的部分 并且梁构件的腹板3的表面在周向方向上的多个位置处暂时焊接。 临时固定在梁构件的腹板3上的环状加强构件4的倾斜面5和贯通孔的内周面通过单面部分贯通焊接进行焊接固定。 版权所有(C)2011,JPO&INPIT
    • 4. 发明专利
    • Prestressed concrete well and method of constructing bridge
    • 预应力混凝土和构造桥梁的方法
    • JP2008101394A
    • 2008-05-01
    • JP2006284788
    • 2006-10-19
    • Katayama Stratec Kk片山ストラテック株式会社
    • HIRANO SHUJIKASHU YOSHIHIRO
    • E02D27/32E01D19/02E01D21/00E02D27/00
    • PROBLEM TO BE SOLVED: To provide a prestressed concrete well enabling a reduction in construction period and a method of constructing a bridge.
      SOLUTION: The prestressed concrete well comprises: a cylindrical prestressed concrete well body 21 and a fixing part 10 which projects from the prestressed concrete well body 21 inward and to which a pier 3 can be attached. The method of constructing the bridge comprises: a foundation construction step S1 of constructing cylindrical prestressed concrete well foundations 2 each having the fixing part 10 on the inner peripheral surface by using the prestressed concrete wells; a temporary fixing step S2 of temporarily fixing the pier 3 to each of the prestressed concrete well foundations 2 by attaching the piers 3 to fixing part 10, an installation step S3 of installing bridge upper part structures 4 between the piers 3; and a fixing step S4 of fixing each pier 3 to each prestressed concrete well foundation 2 by depositing a concrete 80 in each prestressed concrete well foundation 2. The installation step S3 is performed before or simultaneously with the fixing step S4.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种能够减少施工周期的预应力混凝土井和一种构建桥梁的方法。 解决方案:预应力混凝土井包括:圆柱形预应力混凝土井体21和固定部分10,其从预应力混凝土井体21向内突出并且可以安装墩3。 构筑桥梁的方法包括:通过使用预应力混凝土井,构造圆柱形预应力混凝土井基础2的基础施工步骤S1,每个都具有内周面上的固定部分10; 临时固定步骤S2,通过将墩3附接到固定部10将临时将墩3固定到每个预应力混凝土井基础2;在桥墩3之间安装桥上部结构4的安装步骤S3; 以及通过在每个预应力混凝土基础2中沉积混凝土80将每个墩3固定到每个预应力混凝土基础2的固定步骤S4。安装步骤S3在定影步骤S4之前或同时进行。 版权所有(C)2008,JPO&INPIT
    • 5. 发明专利
    • Joint part structure of steel-concrete composition floor slab
    • 钢混凝土组合物的接合部分结构
    • JP2005105590A
    • 2005-04-21
    • JP2003338207
    • 2003-09-29
    • Katayama Stratec KkKomai Tekko KkKurimoto Ltd株式会社栗本鐵工所片山ストラテック株式会社駒井鉄工株式会社
    • TANAKA MASAAKIUCHIDA HIRONARIOKUBO NOBUTOOYAMA OSAMUNAKAMOTO KEISUKETACHIBANA HAJIME
    • E01D19/12E04B5/40
    • PROBLEM TO BE SOLVED: To provide sufficient joining strength of both steel bottom plate end parts 1a and 1a and a splicing plate 4; and to provide sufficient joining strength for the steel bottom plate end parts and concrete C.
      SOLUTION: This joint part structure of a steel-concrete composition floor slab, is integrated by placing the concrete C by arranging reinforcements 3 on a steel bottom plate 1. Both steel bottom plate end parts and the splicing plate 4 are firmly joined by fastening to both steel bottom plate end parts 1a and 1a, by respectively screwing a nut 17 in a welding stud 16. A stud 15 with a swelling head part is arranged separately from this stud 16 by penetrating through the splicing plate 4. The swelling head part is formed by screwing a nut 19 in the tip of both studs 15 and 16, and the sufficient joining strength in the vertical direction of the steel bottom plate end parts and the concrete C, is provided by the head parts 19 and 20. The shearing key effect is exhibited by the concrete C entering clearance of a through-hole 22, to enhance joining force in the horizontal direction of the concrete C and the steel bottom plate end parts 1a. The respective studs 15 and 16 are arranged in a zigzag shape.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供钢底板端部1a和1a以及拼接板4的足够的接合强度; 并为钢底板端部和混凝土C提供足够的接合强度。解决方案:将钢筋混凝土组合物地板的接合部分结构集成在一起,通过将钢筋3放置在钢底部 钢板底板端部和拼接板4通过将螺母17分别拧在焊接螺柱16中,通过紧固到两个钢底板端部1a和1a两者而牢固地连接在一起。具有膨胀头部分的螺柱15 通过穿过拼接板4与该螺栓16分开布置。膨胀头部分通过将螺母15拧在两个螺柱15和16的末端中而形成,并且在钢底板的垂直方向上具有足够的接合强度 端头部分和混凝土C由头部19和20提供。通过混凝土C进入通孔22的间隙表现出剪切关键作用,以增强锥形水平方向上的接合力 克里特岛C和钢底板端部1a。 相应的螺栓15和16以锯齿形的形式布置。 版权所有(C)2005,JPO&NCIPI
    • 7. 发明专利
    • CONTROL METHOD FOR ELECTRO GAS WELDING OF CONSTRUCTION STEEL COLUMN
    • JPH1133722A
    • 1999-02-09
    • JP18610197
    • 1997-07-11
    • KATAYAMA STRATEC KK
    • FUJIHIRA SHOICHIROHASHIDA TOMOYUKI
    • B23K9/173B23K9/00B23K9/028B23K9/095
    • PROBLEM TO BE SOLVED: To provide a method in which a joint part of the comparatively short welding length is beautifully welded at the proper weld bead width by applying electro gas welding to a flange plate to connect at the groove part of its end on the side and the like of the column, and also by making the welding voltage gradually dropped with the progress of welding. SOLUTION: The end of the flange plate 2 with the V shape groove is placed to the side of the column 1 or the diaphragm at a given groove interval, and fixed by a backing metal 3 and a chip metal 4. Then, this groove part is connected by electro gas welding. The welding voltage is controlled so that it may drop gradually as the welding progresses in this case. When the connection part of the construction steel column is connected by electro gas welding, for example, total welding length is divided into four sections and the welding voltage is controlled by each section. In this case, it is desirable that the voltage in the welding starting side is controlled to be higher and the voltage in the welding termination side is lower than the standard voltage of the central part. This prevents the bead width Wb from widening as the progress of the welding.
    • 8. 发明专利
    • Removal device for welding part of steel floor board
    • 钢板焊接部件拆卸装置
    • JP2013241784A
    • 2013-12-05
    • JP2012115546
    • 2012-05-21
    • Katayama Stratec Kk片山ストラテック株式会社Sankyo Eng Kk三協エンジニアリング株式会社
    • OKUBO NOBUHITOIBARADA TAKUMIKADOWAKI SABURO
    • E01D19/12E01D22/00
    • PROBLEM TO BE SOLVED: To reduce any time and effort required for the removal work of a welding part of a steel floor board, improve safety in the removal work of the welding part, and make almost uniform a removal amount of the welding part or the bevel shape of a removal mark.SOLUTION: A removal device 10 of a welding part is positioned such that the head of a spindle 11 approaches a welding part 23, and that the slide direction of a slider 13 matches the longitudinal direction of the welding part 23 by magnet parts 16 and 17. While the spindle 11 is driven to rotate, the slider 23 is made to slide along the welding part 23 so that the welding part can be removed by a cutting blade 11a. The removal work is automatically performed by using the removal device 10 without performing any manual work so that it is possible to save a time and effort. An operator remotely operates the removal device 10 to secure safety. The distance of the cutting blade 11a to the welding part is held to be almost fixed so that it is possible to make almost uniform the removal amount of the welding part 23 or the like, and to block the generation of any welding insufficient place in the following re-welding work.
    • 要解决的问题:为了减少钢底板的焊接部分的去除工作所需的时间和精力,提高焊接部件的去除工作的安全性,并使焊接部件或焊接部件的去除量几乎均匀 拆卸标记的斜面形状。解决方案:焊接部件的移除装置10定位成使得主轴11的头部接近焊接部23,并且滑块13的滑动方向与焊接部的纵向方向一致 当主轴11被驱动旋转时,使滑块23沿着焊接部23滑动,从而可以通过切割刀11a去除焊接部。 通过使用移除装置10自动执行去除工作,而不进行任何手动工作,从而可以节省时间和精力。 操作者远程操作移除装置10以确保安全。 切割刀片11a与焊接部分的距离被保持为几乎固定,使得可以使焊接部件23等的去除量几乎均匀,并且阻止在焊接部件23中产生任何焊接不足的位置 以下重新焊接工作。
    • 10. 发明专利
    • Method for repairing and reinforcing steel structure under service by welding
    • 通过焊接维修和加固钢结构的方法
    • JP2009202201A
    • 2009-09-10
    • JP2008047175
    • 2008-02-28
    • Katayama Stratec Kk片山ストラテック株式会社
    • UENO YASUOFUJIHIRA SHOICHIROKIN YUTETSU
    • B23K31/00B23K9/00
    • PROBLEM TO BE SOLVED: To provide a method for repairing and reinforcing a damaged site in a weld part in a steel structure under service by welding, to which a varied load is repeatedly applied, in a relatively simple method.
      SOLUTION: In the method, the site to be repaired and reinforced is welded from one side regardless of whether or not cracks occure in the welded part in a state that a varied load is repeatedly applied on the site to be repaired the change in the displacement of an opening is not more than 0.5 mm. After the welding, cracks are removed by chipping from the backside of the welded site to be repaired and reinforced. After the confirmation of the removal of the cracks, the site subjected to chipping is subjected to full penetration welding.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种在相对简单的方法中修复和加强通过焊接工作的钢结构中的焊接部分中的损坏部位的方法,其中重复施加变化的负载。

      解决方案:在该方法中,不管焊接部位是否发生裂纹,在不断变化的载荷被重新施加在要修复的部位上的状态下,将被修复和加固的部位进行焊接 在开口的位移不大于0.5mm。 在焊接之后,通过从焊接部位的后侧开始切割而被修复和加固的裂纹被去除。 在确认除去裂纹之后,进行切屑处理的部位进行全焊透。 版权所有(C)2009,JPO&INPIT