热词
    • 1. 发明专利
    • Joint part structure of steel-concrete composition floor slab
    • 钢混凝土组合物的接合部分结构
    • JP2005105590A
    • 2005-04-21
    • JP2003338207
    • 2003-09-29
    • Katayama Stratec KkKomai Tekko KkKurimoto Ltd株式会社栗本鐵工所片山ストラテック株式会社駒井鉄工株式会社
    • TANAKA MASAAKIUCHIDA HIRONARIOKUBO NOBUTOOYAMA OSAMUNAKAMOTO KEISUKETACHIBANA HAJIME
    • E01D19/12E04B5/40
    • PROBLEM TO BE SOLVED: To provide sufficient joining strength of both steel bottom plate end parts 1a and 1a and a splicing plate 4; and to provide sufficient joining strength for the steel bottom plate end parts and concrete C.
      SOLUTION: This joint part structure of a steel-concrete composition floor slab, is integrated by placing the concrete C by arranging reinforcements 3 on a steel bottom plate 1. Both steel bottom plate end parts and the splicing plate 4 are firmly joined by fastening to both steel bottom plate end parts 1a and 1a, by respectively screwing a nut 17 in a welding stud 16. A stud 15 with a swelling head part is arranged separately from this stud 16 by penetrating through the splicing plate 4. The swelling head part is formed by screwing a nut 19 in the tip of both studs 15 and 16, and the sufficient joining strength in the vertical direction of the steel bottom plate end parts and the concrete C, is provided by the head parts 19 and 20. The shearing key effect is exhibited by the concrete C entering clearance of a through-hole 22, to enhance joining force in the horizontal direction of the concrete C and the steel bottom plate end parts 1a. The respective studs 15 and 16 are arranged in a zigzag shape.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供钢底板端部1a和1a以及拼接板4的足够的接合强度; 并为钢底板端部和混凝土C提供足够的接合强度。解决方案:将钢筋混凝土组合物地板的接合部分结构集成在一起,通过将钢筋3放置在钢底部 钢板底板端部和拼接板4通过将螺母17分别拧在焊接螺柱16中,通过紧固到两个钢底板端部1a和1a两者而牢固地连接在一起。具有膨胀头部分的螺柱15 通过穿过拼接板4与该螺栓16分开布置。膨胀头部分通过将螺母15拧在两个螺柱15和16的末端中而形成,并且在钢底板的垂直方向上具有足够的接合强度 端头部分和混凝土C由头部19和20提供。通过混凝土C进入通孔22的间隙表现出剪切关键作用,以增强锥形水平方向上的接合力 克里特岛C和钢底板端部1a。 相应的螺栓15和16以锯齿形的形式布置。 版权所有(C)2005,JPO&NCIPI
    • 3. 发明专利
    • Bridge
    • JP2007154572A
    • 2007-06-21
    • JP2005353595
    • 2005-12-07
    • Kurimoto LtdKurimoto Technos:Kk株式会社クリモトテクノス株式会社栗本鐵工所
    • TANAKA MASAAKIRYO KANEHIKOHARA NAOTOMASUI KAZUAKIYAMAZAKI TOSHIHIROKIZU RYOTA
    • E01D1/00C23F15/00E01D19/06
    • PROBLEM TO BE SOLVED: To enhance shielding performance by minimizing a clearance between a shielding plate and a floor slab without damaging the floor slab or applying an excessive load to the shielding plate in a bridge wherein the side face and lower face of a bridge girder section are covered with the shielding plates.
      SOLUTION: A flexible plate 15a is laid between the upper end of the shielding plate 13 and the lower face of the floor slab 11. One end of the flexible plate 15a is fixed to the upper end of the shielding plate 13, and the other end of the flexible plate 15a abuts on the floor slab 11 on the inside of an underthroating 11c of the floor slab 11. A flexible sealing material 15b is filled in this abutting part to close up the clearance formed between the lower face of the floor slab 11 and the upper end of the shielding plate 13. Since the flexible plate 15a bends and absorbs impact, excessive load is not applied to the shielding plate 13. Further, since the flexible plate 15a is not fixed to the floor slab 11, there is no concern about damaging the floor slab 11.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了通过使屏蔽板和地板之间的间隙最小化而不损坏楼板或对桥梁中的屏蔽板施加过大的负载来增强屏蔽性能,其中,桥的侧面和下表面 桥梁横梁覆盖有屏蔽板。 解决方案:柔性板15a铺设在屏蔽板13的上端和地板坯11的下表面之间。柔性板15a的一端固定在屏蔽板13的上端,并且 柔性板15a的另一端与落地板11的下端面11c的内侧的地板坯件11抵接。该柔性密封材料15b被填充在该抵接部分中,以封闭形成在底板11的下表面之间的间隙 由于柔性板15a弯曲并吸收冲击,所以不会对屏蔽板13施加过大的负载。此外,由于柔性板15a未固定在地板坯11上, 不用担心损坏楼板11.版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Bridge cover structure
    • 桥架结构
    • JP2006118155A
    • 2006-05-11
    • JP2004305173
    • 2004-10-20
    • Kurimoto Ltd株式会社栗本鐵工所
    • RYO KANEHIKONOMURA HIROSHITANAKA MASAAKI
    • E01D1/00
    • PROBLEM TO BE SOLVED: To improve shielding performance of a connecting part of a shielding plate 1 while covering a bridge end surface.
      SOLUTION: In this bridge cover structure, a side surface, an under surface, bridge both end surfaces and a girder end surface of a bridge, are covered with covers 10 and 10' composed of the shielding plate 1. The connecting part of the shielding plate 1 is fixed by fastening a rubber plate 3 to the edge of both shielding plates 1 by a machine screw by extending the rubber plate 3 to the edge of of the both shielding plates 1 and 1. Since the rubber plate 3 is flexible, a step of the adjacent shielding plates 1 and a clearance change based on vibration are absorbed by its flexibility. Thus, flexibility of the connecting part of the shielding plate 1 is improved, and the shielding performance is not deteriorated. B type silica gel having semipermanent dehumidifying effect is arranged in the cover 10, to prevent corrosion by high humidity and condensation in rainfall. When a countermeasure against noise is required, a part of the shielding plate 1 for constituting the cover 10 is formed of a sound absorbing plate, or a material having sound absorptivity is adopted for the shielding plate 1.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提高屏蔽板1的连接部分的覆盖桥端面的屏蔽性能。 解决方案:在这种桥盖结构中,桥梁的两个端面和梁的端面的侧面,下表面和桥梁被覆盖有由遮蔽板1组成的盖10和10'。连接部分 通过将橡胶板3延伸到两个屏蔽板1和1的边缘,通过机械螺钉将橡胶板3紧固到两个屏蔽板1的边缘来固定屏蔽板1。由于橡胶板3是 柔性,相邻的屏蔽板1的台阶和基于振动的间隙变化被其柔性吸收。 因此,屏蔽板1的连接部的灵活性提高,屏蔽性能不劣化。 具有半永久性除湿效果的B型硅胶布置在盖10中,以防止降雨中高湿度和冷凝的腐蚀。 当需要对抗噪声的对策时,用于构成盖10的遮蔽板1的一部分由吸音板形成,或者对于屏蔽板1采用具有吸声性的材料。版权所有(C) 2006年,JPO&NCIPI
    • 5. 发明专利
    • Implement for mounting panel
    • 安装面板的实施
    • JP2010065468A
    • 2010-03-25
    • JP2008233420
    • 2008-09-11
    • Kurimoto LtdKurimoto Technos:Kk株式会社クリモトテクノス株式会社栗本鐵工所
    • YAMAZAKI TOSHIHIROANASE MASANORIYAMAMURO SHIGEKITANAKA MASAAKI
    • E01F8/00
    • PROBLEM TO BE SOLVED: To provide an implement for mounting a panel, which enables the panel to be mounted on the undersurface of a girder, without reference to the presence or absence and position of a scaffold.
      SOLUTION: A mounting beam 1 is provided under the girder of a structure, and the panel for covering the undersurface of the girder is fixed in the state of being applied to the undersurface of the mounting beam. The implement 31 for mounting the panel, which is used for temporarily placing the panel on the mounting beam 1 in the case, includes a gripping portion 31a and a rising portion 31b which can be freely attached on/detached from the panel and which protrudes upward from a top surface of the panel when mounted on the panel; and the rising portion 31b is provided with a locking means 30. The panel can be supported by the gripping portion 31a, and lowered in a suspended state; and the locking means 30 has the function of locking the panel to the mounting beam 1. The panel 3 is temporarily placed on the mounting beam 1 by the locking means 30, and fixed to the mounting beam 1; and after that, the implement 31 can be detached from the panel.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种用于安装面板的工具,其能够将面板安装在大梁的下表面上,而不考虑脚手架的存在或不存在和位置。 解决方案:安装梁1设置在结构的梁的下面,用于覆盖梁的下表面的板被固定在施加到安装梁的下表面的状态。 用于将面板临时放置在壳体中的安装梁1上的用于安装面板的工具31包括可以自由地安装在面板上或从面板向上突出的上升部分31a和抬起部分31b, 从面板的顶面安装在面板上; 并且上升部分31b设置有锁定装置30.面板可以由夹持部分31a支撑并且处于悬挂状态下降; 并且锁定装置30具有将面板锁定到安装梁1的功能。面板3通过锁定装置30暂时放置在安装梁1上并固定到安装梁1; 此后,工具31可以从面板拆下。 版权所有(C)2010,JPO&INPIT
    • 6. 发明专利
    • Bridge
    • JP2007154576A
    • 2007-06-21
    • JP2005353870
    • 2005-12-07
    • Kurimoto LtdKurimoto Technos:Kk株式会社クリモトテクノス株式会社栗本鐵工所
    • TANAKA MASAAKINOMURA HIROSHIHARA NAOTOMASUI KAZUAKIYAMAZAKI TOSHIHIROKIZU RYOTA
    • E01D22/00E01D2/00
    • PROBLEM TO BE SOLVED: To efficiently improve the shielding property of a bridge girder part, particularly the shielding property of its end, with simple construction.
      SOLUTION: When covering a side face, a lower face and the end of the bridge girder part 12 of a bridge 10 with shielding plates 13, the end shielding plate 13 is installed inward by 0.5-5 m from a bearing 16. In this manner, a large working space can be secured in installing the end shielding plate 13 to permit excellent construction. Further, since rainwater or the like does not infiltrate into the bridge girder part 12 even if there is a water leakage from an expansion device 17, there is no need to separately close up the lower face or the like of the expansion device 17, and in consequence, structure is simplified. Furthermore, even if clearances are formed at joint parts between the side face and lower face shielding plates 13 and the end shielding plate 13, the clearances are not directly exposed to the outside, which makes it hard for impurities to enter. In carrying out inspection work, it is convenient to use a maintenance hatch provided at the end shielding plate 13.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:以简单的结构有效地提高桥梁梁的部件的屏蔽性能,特别是其端部的屏蔽性能。 解决方案:当覆盖具有遮蔽板13的桥梁10的侧面和下表面以及桥梁梁12的端部时,端部屏蔽板13从轴承16内向内安装0.5-5m。 以这种方式,可以在安装端部屏蔽板13时确保大的工作空间,以允许优异的结构。 此外,由于即使膨胀装置17存在水泄漏,因此雨水等不会渗透到桥梁梁部12中,因此不需要分开闭合膨胀装置17的下表面等, 结果简化了结构。 此外,即使在侧面和下面遮蔽板13和端部遮蔽板13之间的接合部形成间隙,间隙也不会直接暴露在外部,因此杂质难以进入。 在进行检查工作时,使用在末端屏蔽板13处提供的维护舱是方便的。(C)2007年,JPO&INPIT
    • 7. 发明专利
    • Method and structure for mounting panel
    • 安装面板的方法和结构
    • JP2010065431A
    • 2010-03-25
    • JP2008232003
    • 2008-09-10
    • Kurimoto LtdKurimoto Technos:Kk株式会社クリモトテクノス株式会社栗本鐵工所
    • YAMAZAKI TOSHIHIROMORI SHINICHIROHIGASHIGUCHI KOJIANASE MASANORISHIMOZONO KOZOYAMAMURO SHIGEKITANAKA MASAAKI
    • E01F8/00E01D19/00
    • PROBLEM TO BE SOLVED: To mount a panel on a girder before and during the construction of a floor board.
      SOLUTION: In this method for mounting the panel, the panel 3 for covering an undersurface of the girder 2 is mounted on a structure in which the floor board is supported by the girder 2. A mounting beam 1 is suspended on the girder 2 via a hanging member 11 equipped with a height adjusting means 10; the panel 3 is fixed to the mounting beam 1; after that, the floor board is constructed on the girder 2; and the height adjusting means 10 makes a difference of elevation between the girder 2 and the mounting beam 1 adjusted depending on the amount of deflection of each portion of the girder 2, associated with the construction of the floor board. When the girder 2 is bent by the construction of the floor board, the height adjusting means 10 enables the difference of elevation between the girder 2 and the mounting beam 1 to be adjusted depending on the amount of deflection of each portion of the girder 2. Thus, the deformation and coming-off of the panel 3 can be prevented from being caused by the deflection of the girder 2. In other words, the panel 3 can be mounted on the girder 2 before or during the construction of the floor board.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:在建筑地板前和施工期间将面板安装在大梁上。 解决方案:在这种用于安装面板的方法中,用于覆盖梁2的下表面的面板3安装在地板由梁2支撑的结构上。安装梁1悬挂在梁上 2通过装备有高度调节装置10的悬挂构件11; 面板3固定在安装梁1上; 之后,在大梁2上构造地板; 并且高度调节装置10根据与地板的结构相关联的梁2的每个部分的偏转量来调节梁2和安装梁1之间的仰角差。 当通过地板板的构造弯曲梁2时,高度调节装置10能够根据梁2的每个部分的偏转量来调节梁2和安装梁1之间的高度差。 因此,可以防止面板3的变形和脱落是由于梁2的偏转引起的。换句话说,面板3可以在地板的构造之前或期间安装在梁2上。 版权所有(C)2010,JPO&INPIT