    • 1. 发明专利
    • Prestressed concrete well and method of constructing bridge
    • 预应力混凝土和构造桥梁的方法
    • JP2008101394A
    • 2008-05-01
    • JP2006284788
    • 2006-10-19
    • Katayama Stratec Kk片山ストラテック株式会社
    • HIRANO SHUJIKASHU YOSHIHIRO
    • E02D27/32E01D19/02E01D21/00E02D27/00
    • PROBLEM TO BE SOLVED: To provide a prestressed concrete well enabling a reduction in construction period and a method of constructing a bridge.
      SOLUTION: The prestressed concrete well comprises: a cylindrical prestressed concrete well body 21 and a fixing part 10 which projects from the prestressed concrete well body 21 inward and to which a pier 3 can be attached. The method of constructing the bridge comprises: a foundation construction step S1 of constructing cylindrical prestressed concrete well foundations 2 each having the fixing part 10 on the inner peripheral surface by using the prestressed concrete wells; a temporary fixing step S2 of temporarily fixing the pier 3 to each of the prestressed concrete well foundations 2 by attaching the piers 3 to fixing part 10, an installation step S3 of installing bridge upper part structures 4 between the piers 3; and a fixing step S4 of fixing each pier 3 to each prestressed concrete well foundation 2 by depositing a concrete 80 in each prestressed concrete well foundation 2. The installation step S3 is performed before or simultaneously with the fixing step S4.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种能够减少施工周期的预应力混凝土井和一种构建桥梁的方法。 解决方案:预应力混凝土井包括:圆柱形预应力混凝土井体21和固定部分10,其从预应力混凝土井体21向内突出并且可以安装墩3。 构筑桥梁的方法包括:通过使用预应力混凝土井,构造圆柱形预应力混凝土井基础2的基础施工步骤S1,每个都具有内周面上的固定部分10; 临时固定步骤S2,通过将墩3附接到固定部10将临时将墩3固定到每个预应力混凝土井基础2;在桥墩3之间安装桥上部结构4的安装步骤S3; 以及通过在每个预应力混凝土基础2中沉积混凝土80将每个墩3固定到每个预应力混凝土基础2的固定步骤S4。安装步骤S3在定影步骤S4之前或同时进行。 版权所有(C)2008,JPO&INPIT
    • 4. 发明专利
    • Steel plate floor and method of welding steel plate floor
    • 钢板地板和焊接钢板地板的方法
    • JP2012017563A
    • 2012-01-26
    • JP2010153942
    • 2010-07-06
    • Hanshin Expressway Co LtdKatayama Stratec Kk片山ストラテック株式会社阪神高速道路株式会社
    • HORIE YOSHIHEINISHIOKA TSUTOMUSUGIYAMA HIROKIKASHU YOSHIHIROFUJIHIRA SHOICHIROOKUBO NOBUHITOOKUMURA MANABUUENO YASUO
    • E01D19/12
    • PROBLEM TO BE SOLVED: To provide a method of suppressing occurrence of a fatigue crack in a weld zone between a deck plate and a U-shaped rib of a steel plate floor at low cost.SOLUTION: An abutting portion between a deck plate 11 and a U-shaped rib 12 of a steel plate floor 1 is welded from both an outer surface side 13 and an inner surface side 14 of the U-shaped rib to form an outer weld zone 13 and an inner weld zone 14. Since a larger weld area is achieved compared to a conventional steel plate floor having only the outer weld zone, stress in the weld zones 13 and 14 is dispersed to suppress occurrence of a fatigue crack. Compared to manufacturing of a conventional steel plate floor, increase in man-power results only from a weld work at the inner surface side, causing no steep rise in construction costs. The inner surface side is welded by a dedicated welding device equipped with a weld torch on a carriage, which travels in a closed space inside the rib having a closed section.
    • 要解决的问题:提供一种低成本地抑制钢板地板的甲板和U形肋之间的焊接区域的疲劳裂纹发生的方法。 解决方案:从U形肋的外表面侧13和内表面侧14焊接钢板底板1的甲板11和U形肋12之间的抵接部分,形成 外部焊接区域13和内部焊接区域14.与仅具有外部焊接区域的传统钢板地板相比,实现了较大的焊接区域,因此分散焊接区域13和14中的应力以抑制疲劳裂纹的发生。 与传统钢板地板的制造相比,人力的增加仅来自内表面侧的焊接工作,不会使施工成本急剧上升。 内表面侧通过装配有焊枪的专用焊接装置焊接在滑架上,该滑架在具有闭合部分的肋内的封闭空间中行进。 版权所有(C)2012,JPO&INPIT