    • Prestressed concrete well and method of constructing bridge
    • 预应力混凝土和构造桥梁的方法
    • JP2008101394A
    • 2008-05-01
    • JP2006284788
    • 2006-10-19
    • Katayama Stratec Kk片山ストラテック株式会社
    • HIRANO SHUJIKASHU YOSHIHIRO
    • E02D27/32E01D19/02E01D21/00E02D27/00
    • PROBLEM TO BE SOLVED: To provide a prestressed concrete well enabling a reduction in construction period and a method of constructing a bridge.
      SOLUTION: The prestressed concrete well comprises: a cylindrical prestressed concrete well body 21 and a fixing part 10 which projects from the prestressed concrete well body 21 inward and to which a pier 3 can be attached. The method of constructing the bridge comprises: a foundation construction step S1 of constructing cylindrical prestressed concrete well foundations 2 each having the fixing part 10 on the inner peripheral surface by using the prestressed concrete wells; a temporary fixing step S2 of temporarily fixing the pier 3 to each of the prestressed concrete well foundations 2 by attaching the piers 3 to fixing part 10, an installation step S3 of installing bridge upper part structures 4 between the piers 3; and a fixing step S4 of fixing each pier 3 to each prestressed concrete well foundation 2 by depositing a concrete 80 in each prestressed concrete well foundation 2. The installation step S3 is performed before or simultaneously with the fixing step S4.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种能够减少施工周期的预应力混凝土井和一种构建桥梁的方法。 解决方案:预应力混凝土井包括:圆柱形预应力混凝土井体21和固定部分10,其从预应力混凝土井体21向内突出并且可以安装墩3。 构筑桥梁的方法包括:通过使用预应力混凝土井,构造圆柱形预应力混凝土井基础2的基础施工步骤S1,每个都具有内周面上的固定部分10; 临时固定步骤S2,通过将墩3附接到固定部10将临时将墩3固定到每个预应力混凝土井基础2;在桥墩3之间安装桥上部结构4的安装步骤S3; 以及通过在每个预应力混凝土基础2中沉积混凝土80将每个墩3固定到每个预应力混凝土基础2的固定步骤S4。安装步骤S3在定影步骤S4之前或同时进行。 版权所有(C)2008,JPO&INPIT