会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 10. 发明申请
    • INTEGRATION OF DISSIMILAR JOB TYPES INTO AN EARLIEST DEADLINE FIRST (EDF) SCHEDULE
    • 分类工作类型集成到最早的第一阶段(EDF)时间表
    • US20130283279A1
    • 2013-10-24
    • US13594468
    • 2012-08-24
    • Scott A. BrandtRichard A. GoldingTheodore M. Wong
    • Scott A. BrandtRichard A. GoldingTheodore M. Wong
    • G06F9/48
    • G06F9/4887
    • A method for implementation within a scheduler for a processor is described. The method includes receiving a plurality of jobs from an earliest deadline first (EDF) schedule, wherein the scheduler implements an EDF scheduling model. The method also includes receiving a separate job from a source other than the EDF schedule. The separate job has a fixed scheduling requirement with a specific execution time. The method also includes determining an amount of available utilization capacity of the processor and inserting the separate job into an execution plan of the processor with the plurality of jobs from the EDF schedule in response to a determination that the available utilization capacity of the processor is sufficient to execute the separate job according to the fixed scheduling requirement associated with the separate job.
    • 描述了用于在处理器的调度器内实现的方法。 该方法包括从最早期限(EDF)调度接收多个作业,其中调度器实现EDF调度模型。 该方法还包括从除EDF进度之外的源接收单独的作业。 单独的作业具有特定执行时间的固定调度要求。 该方法还包括:响应于确定处理器的可用利用率足够而确定处理器的可用利用能力的量并将该单独作业插入具有来自EDF调度表的多个作业的处理器的执行计划 根据与单独作业相关联的固定调度要求执行单独的作业。