    • Construction management method in construction of nuclear power plant in cold district
    • 冷区核电厂建设管理方法
    • JP2011021952A
    • 2011-02-03
    • JP2009166067
    • 2009-07-14
    • Toshiba Corp株式会社東芝
    • INOUE OSAMUHASHIMOTO YUTAKAYONEDA KEIKICHISORI SHINJI
    • G21C13/00E04G21/00
    • Y02E30/40
    • PROBLEM TO BE SOLVED: To select equipment and piping that are vulnerable to freezing in the construction of a nuclear power plant and keep them from becoming damaged due to freezing, by preventing the ingress of cool air with a temporary door and moisturizing with a temporary heater for the equipment and piping selected.
      SOLUTION: Construction management on the piping and the equipment is conducted, on the basis of outside air temperature and meteorological data by obtaining meteorological data through prior measurement of the outside air temperature on site and the temperature at spots inside a reactor building 1, where temperatures could drop below freezing, selecting the piping and equipment near a door 5 of the reactor building, which is susceptible to the change in outside air and is highly likely to freeze and conducting analytical surveys of outside air temperature and the fluctuations in the temperatures inside the building, on the basis of the obtained data.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:选择在核电厂建设中容易冻结的设备和管道,防止冻结造成的损坏,防止用临时门进入冷空气,并保湿 选择了设备和管道的临时加热器。 解决方案:根据室外空气温度和气象数据,通过先前测量现场外部空气温度和反应堆建筑物1内点火的温度,获取气象数据,对管道和设备进行施工管理 在温度可能低于冰点的情况下,选择反应堆建筑物门5附近的管道和设备,易受外界空气变化的影响,很可能冻结并进行外部空气温度的分析调查 根据获得的数据,建筑物内的温度。 版权所有(C)2011,JPO&INPIT
    • 3. 发明专利
    • Mobile scaffold for construction
    • 移动移动建筑施工
    • JP2010037790A
    • 2010-02-18
    • JP2008200928
    • 2008-08-04
    • Toshiba Corp株式会社東芝
    • HASHIMOTO YUTAKANISHIZAWA MASAHIROTOKUTOME SACHINORIINOUE OSAMU
    • E04G1/24E04G1/15E04G1/38
    • PROBLEM TO BE SOLVED: To reduce scaffold materials by reducing scaffolds conventional installed throughout a floor surface and installing them in a part of a temporary installation area; to dispense with the primary removal, reinstallation, etc. of the scaffold by shifting the scaffold from the temporary installation area to avoid the scaffold a piping material, in the carrying-in and temporary installation of equipment materials such as the piping material; and to contribute to the shortening of a process and a reduction in the number of man-hours by reducing a large number of conventionally-required scaffold materials and installing the scaffold in a building through a small amount of removal and replacement of the scaffold.
      SOLUTION: The temporary scaffold is used for the construction of a sidewall and a ceiling wall on a floor for building installation; a track 3 along the sidewall is provided on the floor 2; a roller 6 is provided at the lower end of the temporary scaffold 7; and the temporary scaffold is mounted movably along the track via the roller.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:通过减少常规安装在整个地板表面上的支架并将其安装在临时安装区域的一部分中来减少脚手架材料; 通过从临时安装区域移动脚手架避免脚手架的主要拆卸,重新安装等,以避免在支架和临时安装设备材料如管道材料的过程中使用管道材料。 并通过减少大量常规需要的脚手架材料和通过少量的支架移除和更换来将建筑物安装在建筑物中,从而有助于缩短工艺和减少工时。

      解决方案:临时脚手架用于在建筑物安装的地板上建造侧壁和天花板墙壁; 沿着侧壁的轨道3设置在地板2上; 在临时脚手架7的下端设置有辊子6; 并且临时脚手架通过滚子沿轨道可移动地安装。 版权所有(C)2010,JPO&INPIT

    • 5. 发明专利
    • Magnetoresistive element and magnetic memory
    • 磁性元件和磁记忆
    • JP2012064776A
    • 2012-03-29
    • JP2010208058
    • 2010-09-16
    • Toshiba Corp株式会社東芝
    • DAIBO TADAOMIKITAGAWA EIJIHASHIMOTO YUTAKAJIA DA DOUNAGASE TOSHIHIKONISHIYAMA KATSUYAUEDA KOJINAGAMINE MAKOTOKAI TADASHIYODA HIROAKI
    • H01L27/105G11B5/39H01L21/8246H01L29/82H01L43/08
    • H01L43/08H01L27/228H01L43/10
    • PROBLEM TO BE SOLVED: To provide a magnetoresistive effect element which has perpendicular magnetic anisotropy and is capable of developing a larger magnetoresistive effect.SOLUTION: A magnetoresistive element includes: a first ferromagnetic layer 2 having an axis of easy magnetization in a direction perpendicular to a film surface; a second ferromagnetic layer 10 having an axis of easy magnetization in a direction perpendicular to the film surface; a non-magnetic layer 6 provided between the first ferromagnetic layer and the second ferromagnetic layer; a first interfacial magnetic layer 4 provided between the first ferromagnetic layer and the non-magnetic layer; and a second interfacial magnetic layer 8 provided between the second ferromagnetic layer and the non-magnetic layer. The first interfacial magnetic layer includes a first interfacial magnetic film 4a provided on the first ferromagnetic layer side, a second interfacial magnetic film 4c provided on the non-magnetic layer side and having a composition different from the first interfacial magnetic film, and a first non-magnetic film 4b provided between the first interfacial magnetic film and the second interfacial magnetic film. By applying a current flow through the non-magnetic layer between the first ferromagnetic layer and the second ferromagnetic layer, the magnetization direction of one of the first ferromagnetic layer and the second ferromagnetic layer is made variable.
    • 要解决的问题:提供具有垂直磁各向异性并且能够产生更大磁阻效应的磁阻效应元件。 解决方案:磁阻元件包括:在垂直于膜表面的方向上具有容易磁化的轴的第一铁磁层2; 第二铁磁层10在垂直于膜表面的方向上具有容易磁化的轴线; 设置在第一铁磁层和第二铁磁层之间的非磁性层6; 设置在第一铁磁层和非磁性层之间的第一界面磁性层4; 以及设置在第二铁磁层和非磁性层之间的第二界面磁性层8。 第一界面磁性层包括设置在第一铁磁性层侧的第一界面磁性膜4a,设置在非磁性层一侧且具有与第一界面磁性膜不同的组成的第二界面磁性膜4c, - 磁膜4b,设置在第一界面磁性膜和第二界面磁性膜之间。 通过施加电流流过第一铁磁层和第二铁磁层之间的非磁性层,第一铁磁层和第二铁磁层之一的磁化方向是可变的。 版权所有(C)2012,JPO&INPIT
    • 6. 发明专利
    • Pre-construction method for premises-use trench of nuclear power plant
    • 原子能发电厂的使用原理的预构建方法
    • JP2013002846A
    • 2013-01-07
    • JP2011131516
    • 2011-06-13
    • Toshiba Corp株式会社東芝
    • HASHIMOTO YUTAKAINOUE OSAMU
    • G21C13/00
    • E02D29/05
    • PROBLEM TO BE SOLVED: To provide a pre-construction method for a premises-use trench of a nuclear power plant with which the trench can be constructed on earlier stage after a reactor building is constructed completely.SOLUTION: A pre-construction method for a premises-use trench of a nuclear power plant includes the steps of constructing a plurality of buildings for nuclear power generation, constructing the trench between the buildings via a gantry matching the trench to an installation level of the trench, and backfilling a gap between a foundation and the trench after the trench is constructed.
    • 要解决的问题:提供一种核电站的房屋使用沟槽的预施工方法,在完全构建反应堆建造之后,可以在早期阶段建造沟槽。 解决方案:核电厂房屋用途沟槽的预施工方法包括:构建多个用于核发电的建筑物的步骤,通过与沟槽相匹配的门架与建筑物之间的沟槽构建建筑物之间的沟槽 沟槽的水平面,并且在构造沟槽之后回填基础和沟槽之间的间隙。 版权所有(C)2013,JPO&INPIT
    • 8. 发明专利
    • CONDUIT TUBE CAP
    • JPH06276645A
    • 1994-09-30
    • JP5728393
    • 1993-03-17
    • TOSHIBA CORP
    • HASHIMOTO YUTAKA
    • E04G21/02E04G21/24G21D1/00H02G3/04
    • PURPOSE:To insert wires into a conduit tube efficiently by protruding a bolt fitted vertically to a cap at the end of the conduit tube, to be buried in a con crete body at the time of concrete work, from the surface of a frame where concrete is placed. CONSTITUTION:Ready-mixed concrete is placed in a formwork 4 to form a concrete body 1. On this occasion, a conduit tube 2 to insert electric wires in is placed at a specified position in the concrete body beforehand. The end part of the conduit tube 2 is threaded, and a conduit tube cap 10 is screwed in to constitute a conduit tube cap body 13. A bolt 6 is set in the conduit tube body 13 so as to stand vertically protruding to the outside of the formwork 4, and fixed with a nut 7. Consequently, it becomes possible to arrange the conduit tube 2 correctly at a specified position, prevent ready-mixed concrete from flowing into the conduit tube path 2, and make wire laying work more efficient.