    • 7. 发明专利
    • COUPLING PART PROTECTING METHOD IN BURIED PIPE
    • JPH0333596A
    • 1991-02-13
    • JP16843689
    • 1989-06-30
    • NIPPON KOKAN KK
    • WATANABE MASAAKINAKAJIMA YOSHIKAZU
    • F16L1/024F16L57/00F16L58/18
    • PURPOSE:To reduce the applied quantity of the earth to be refilled and lighten the field covering work of coupling parts by bonding buried pipes in a ditch drilled by means of a meeting place drilling method, applying anticorrosive coating to the outer surface of the coupling part and filling foaming resin around the coupling part. CONSTITUTION:A ditch 6 is drilled at the coupling parts of buried pipes 2 by a meeting place drilling method, and the buried pipes 2 are connected to each other in the ditch 6 by welding. Anticorrosive coating 8 of inorganic zinc or the like is then applied to the outer surface of the coupling part in order to protect the coupling part from corrosion. Foaming resin material made of foaming styrene and the like is further injected to the bottom part of the ditch 6 and foamed to cover around the buried pipes 2 with foaming resin 7. The upper part of the foaming resin 7 is backfilled with the earth generated by drilling the ditch for a meeting place. As a result, the applied quantity of the earth to be refilled can be reduced, as well as the field covering work of the coupling part can be lightened.
    • 10. 发明专利
    • SETTLING OF PIPELINE
    • JPH01163306A
    • 1989-06-27
    • JP32232687
    • 1987-12-18
    • NIPPON KOKAN KK
    • KOTSUKI ZENJINAKAJIMA YOSHIKAZUSUZUKI NOBUHISA
    • E02D1/00E02D27/46F16L1/024G01M13/00G01M99/00
    • PURPOSE:To bring about settling displacement of pipes by simplified equipments by a method in which a pipe set in the bottom of an excavated trench is buried in a soluble solid, a frozen settled layer is formed through a freezing liquid, and a heat source is supplied through pipe set in the layer to thaw the ice. CONSTITUTION:A pipe 2 is set in the bottom of an excavated trench 1 with a pipeline 5 and buried in soluble solids to a given level in order to form a settled layer 3, where the layer 3 is watered and at the same time frozen through a refrigerant. The pipeline 5 in the upper part of the layer 3 is finished and the the soil to the ground is compacted. The frozen water of the layer 3 is thawed by supply or circulation of heat source into the pipe 2 in the layer 3, and the solids forming the layer 3 are dissolved by the thawed liquid so that the upper pipeline 5 of the layer 3 and the deposit soil are settled down by a degradation phenomenon similar to the ground subsidence. Experimental measurement on displacement of the pipeline by the ground subsidence can thus be eliminated, and the operation is economically performed without specific technique.