    • Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
    • 三拱挖掘隧道中间壁结构及其构造方法
    • US07530765B2
    • 2009-05-12
    • US10534521
    • 2003-11-14
    • Dong-Hyung SeoSeok-Ryul YunOh-Hyun Kwon
    • Dong-Hyung SeoSeok-Ryul YunOh-Hyun Kwon
    • E21D11/00
    • E21D9/14E21D9/006E21D11/38E21F16/02
    • Disclosed are a structure of an intermediate wall of a three arch excavated tunnel, which effectively exhausts subterranean water from a peripheral ground, and a method for constructing the tunnel. The method comprising the steps of: (a) excavating an upper portion of a central tunnel 10; (b) excavating a lower portion of the central tunnel 10; (c) forming an intermediate wall 20 and grouting a gap formed in the intermediate wall 20; (d) excavating an upper portion of a left main tunnel 30; (e) excavating an upper portion of a right main tunnel 40; (f) excavating a lower portion of the left main tunnel 30; (g) excavating a lower portion of the right main tunnel 40; and (h) installing a drain board 50 and a waterproof layer 60 and casting lining concrete 70 therein so that the tunnel is easily drained through drain pipes 65 and residual water pressure is eliminated.
    • 公开了三拱挖掘隧道的中间壁的结构,其有效地从周边地面排出地下水,以及构造隧道的方法。 该方法包括以下步骤:(a)挖掘中心隧道10的上部; (b)挖掘中央隧道10的下部; (c)形成中间壁20并灌浆形成在中间壁20中的间隙; (d)挖掘左主隧道30的上部; (e)挖掘右主隧道40的上部; (f)挖掘左主隧道30的下部; (g)挖掘右主隧道40的下部; 和(h)在其中安装排水板50和防水层60以及浇注衬里混凝土70,使得隧道容易地通过排水管65排出,并且消除了残留的水压。