    • Tension End Treatment For Guardrail Safety System
    • 护栏安全系统的张力端处理
    • US20170051461A1
    • 2017-02-23
    • US15214888
    • 2016-07-20
    • The Texas A&M University System
    • Dean C. AlbersonD. Lance BullardC. Eugene ButhRoger P. BlighAkram Y. Abu-Odeh
    • E01F15/04E01F15/02
    • E01F15/0438E01F15/025E01F15/0423E01F15/0484E01F15/143
    • According to a particular embodiment, an end treatment for a guardrail safety system includes a terminal portion of a guardrail beam comprising a downstream end and upstream end, a first tension cable coupled to an upstream end of the terminal portion. an extruder configured to receive at least a portion of the guardrail beam and at least a portion of the first tension cable, and a terminal support post installed adjacent the roadway at an upstream end of the terminal portion of the guardrail beam. The extruder includes a narrowing throat providing a channel in which at least a portion of the guardrail beam is disposed. The narrowing throat is configured to flatten the guardrail beam in response to a collision with a vehicle moving the extruder in a downstream direction along the guardrail beam. The terminal support post coupled to an upstream end of the first tension cable.
    • 根据特定实施例,用于护栏安全系统的端部处理包括护栏梁的终端部分,该护栏梁包括下游端和上游端,第一张力线缆连接到终端部分的上游端。 配置成容纳护栏梁的至少一部分和第一张力电缆的至少一部分的挤出机,以及在护栏梁的端子部分的上游端处邻近道路安装的端子支撑柱。 该挤出机包括一个狭窄的喉部,提供通道,其中护栏梁的至少一部分被设置在该通道中。 狭窄的喉部构造成响应于与沿着护栏梁沿下游方向移动挤出机的车辆的碰撞而使护栏梁变平。 所述端子支撑柱联接到所述第一张力电缆的上游端。
    • 3. 发明授权
    • Method and machine for slip forming median barrier walls for highways
    • 用于高速公路的中间阻隔墙的滑动形成方法和机器
    • US4266917A
    • 1981-05-12
    • US29262
    • 1979-04-11
    • Harold W. Godbersen
    • Harold W. Godbersen
    • E01C19/48E01F7/06E01F15/04B28B7/02
    • E01F15/0484E01C19/4893E01F15/0446E01F7/06
    • This invention pertains to a method and machine for slip forming concrete wall structures such as median barrier walls for highways. The slip form comprises a pair of opposite side walls each of which has a skirt member retractable and extensible relative to the lower portion thereof. A top wall separate from the side walls is mounted on the machine frame between the upper portions of the side walls, and each side wall and associated skirt member is movable as a unit relative to the top wall and each skirt member is independently movable relative to an associated side wall. The side walls are adjustably supported on the machine frame for adjustment laterally of the machine frame to accommodate top walls of varying widths and the top wall is verticaly adjustable relative to the machine frame independently of the side walls. Power means provide for a controlled relative movement of the side walls, skirt members and top wall and the relative arrangement of the side walls and top wall is such that a glare shield can be formed over any selected section of the barrier wall without interrupting the continuous advance of the machine in the forming of the barrier wall with linear and reversely curved sections.
    • 本发明涉及一种用于打滑混凝土墙体结构的方法和机器,例如高速公路的中间阻挡壁。 滑动形式包括一对相对的侧壁,每个侧壁具有相对于其下部可缩回和延伸的裙部构件。 与侧壁分离的顶壁在侧壁的上部之间安装在机架上,并且每个侧壁和相关联的裙部构件可作为相对于顶壁的单元移动,并且每个裙部构件可独立地相对于 相关的侧壁。 侧壁可调节地支撑在机架上用于在机架的侧面调节以容纳不同宽度的顶壁,并且顶壁相对于侧壁相对于机架可垂直调节。 动力装置提供侧壁,裙部构件和顶壁的受控的相对运动,并且侧壁和顶壁的相对布置使得可以在阻挡壁的任何选定部分上形成眩光屏蔽而不中断连续的 在形成阻挡壁时机器的前进是线性和反向弯曲的部分。
    • 6. 发明授权
    • Guardrail assembly method and device
    • 护栏组装方法及装置
    • US5355576A
    • 1994-10-18
    • US24520
    • 1993-03-01
    • Jack J. Miller
    • Jack J. Miller
    • E01F15/04B23P11/00B23P19/00
    • E01F15/0407E01F15/0484Y10T29/49831Y10T29/49904Y10T29/49948Y10T29/53526Y10T29/53539
    • Guardrail assembly is performed by a vehicle carrying an inventory of guardrail sections and guardrail support blocks. The vehicle moves along a series of prepositioned guardrail posts and includes a side-mounted support frame allowing joining of guardrail sections and deployment rearward of a continuous ribbon of joined guardrail sections. As the continuous ribbon of joined guardrail sections is deployed, it is urged laterally outward and against attachment sites of the series of prepositioned guardrail posts. The continuous ribbon is then attached to the guardrail post, including mounting of an intermediate support block. The assembly and mounting under the disclosed method and apparatus is approximately half that of conventional guardrail assembly and mounting.
    • 护栏组件由载有护栏部分和护栏支撑块的库存的车辆执行。 车辆沿着一系列预置的护栏柱移动,并且包括一个侧面安装的支撑框架,其允许将护栏部分连接并且在连续的连接的护栏部分带的后方展开。 随着连接的护栏部分的连续带被部署,它被侧向向外推动并且抵靠一系列预置护栏柱的附接位置。 然后将连续的带子连接到护栏柱,包括安装中间支撑块。 在所公开的方法和装置下的组装和安装大约是常规护栏组件和安装的一半。