    • 82. 发明授权
    • Spent catalyst distributor
    • 废催化剂分配器
    • US06797239B1
    • 2004-09-28
    • US09718690
    • 2000-11-22
    • Ye-Mon ChenMahendra Sonabhai Patel
    • Ye-Mon ChenMahendra Sonabhai Patel
    • B01J824
    • C10G11/182B01J8/0025B01J8/18B01J2208/00752
    • The present invention is related to methods and apparatus for improving distributions of both spent catalyst and transport gas into a regenerator of a fluid catalytic cracking unit. Spent catalyst and transport gases move upwardly through a spent catalyst riser and are diverted in a radially outward direction by a deflector cone. The catalyst and transport gas are re-mixed as they move radially outward between two disks before discharging from the outer edges (perimeter) of the distributor into the regenerator in a substantially uniform radial direction. The distributor is adapted to provide continuous discharge from its perimeter so as to cover the entire cross-section of the regenerator.
    • 本发明涉及用于改进废催化剂和运输气体分配到流化催化裂化装置的再生器中的方法和装置。 废催化剂和运输气体向上移动通过废催化剂提升管并且通过偏转器锥体沿径向向外的方向转向。 当催化剂和运输气体在两个盘之间径向向外移动时,在从分配器的外边缘(周边)排放到基本上均匀的径向方向的再生器之前被重新混合。 分配器适于从其周边提供连续排放,以覆盖再生器的整个横截面。
    • 88. 发明授权
    • Controlled discharge from a standpipe containing particulate materials
    • 从含有颗粒材料的立管控制排放
    • US4860694A
    • 1989-08-29
    • US242656
    • 1988-09-12
    • David J. Walker
    • David J. Walker
    • B01J8/00B01J8/36F23C10/18
    • B01J8/0025B01J8/36F23C10/18
    • A system for the control and conveyance of particulate material from a standpipe to the furnace of a circulating fluidized bed boiler. Aeration means positioned in a first area of a conduit transports particulate material deposited by a standpipe to a second area of the conduit. Upon such relocation, additional material from the standpipe enters the first area of the conduit as a replacement for the previously removed material. Fluidizing means in the second area of the conduit fluidizes this removed material causing it to achieve a generally uniform level within this second area. As the height of this level exceeds that of the lower edge of a discharge opening, the fluidized material passes through this opening and into the furnace of a circulating fluidized bed boiler.
    • 一种用于将颗粒材料从竖管控制和输送到循环流化床锅炉的炉中的系统。 定位在管道的第一区域中的曝气装置将由立管沉积的颗粒材料输送到导管的第二区域。 在这种重新定位时,来自立管的附加材料进入导管的第一区域作为先前去除的材料的替代物。 在管道的第二区域中的流化装置将该去除的材料流化,使其在该第二区域内达到一般均匀的水平。 当该高度超过排出口的下边缘的高度时,流化材料通过该开口进入循环流化床锅炉的炉中。
    • 90. 发明授权
    • Arrangement for transporting disintegrated particulate solids
    • 运输崩解颗粒固体的布置
    • US4790692A
    • 1988-12-13
    • US21753
    • 1987-03-04
    • Yorgi BunyozUlrik RasmussenIb Larsen
    • Yorgi BunyozUlrik RasmussenIb Larsen
    • B01J8/00B65G53/52B65G53/66F23K3/02
    • F23K3/02B01J8/0025B65G53/528B65G53/66
    • The invention relates to an arrangement for transporting disintegrated solid particles, in which the particles are transported by a quantity of air placed under an over pressure. The weight ratio of the particle/aix mixture lies within a range at which particle transportation gives rise to migrating particle agglomerations. Transportation of the particles is terminated in a particle agglomeration equalizing arrangement, from where the particles are transported further in the form of a particle/air mixture which has been equalized in time. Particle transportation is effected by at least two stages. A first stage in which the weight ratio of the particle/air mixture is greater than 15, and a second stage in which the weight ratio of the particle/air concentration is greater than 5 and lower than the weight ratio of the particle/air mixture in the first stage. The arrangement is used for transporting powdered coal to a powdered-coal burner connected to a combustion furnace.
    • 本发明涉及一种用于输送崩解的固体颗粒的装置,其中颗粒通过在过压下放置的一定量的空气输送。 颗粒/混合物混合物的重量比在颗粒运输引起迁移颗粒团聚的范围内。 颗粒的运输在颗粒附聚均衡装置中终止,其中颗粒以颗粒/空气混合物的形式进一步输送,颗粒/空气混合物已经在时间上均衡。 颗粒运输至少两个阶段进行。 颗粒/空气混合物的重量比大于15的第一阶段和颗粒/空气浓度的重量比大于5并低于颗粒/空气混合物的重量比的第二阶段 在第一阶段 该装置用于将粉煤输送到连接到燃烧炉的粉煤燃烧器。