    • Connection structure and connection technique for steel pipe for pipe roof technique
    • 用于管道屋顶技术的钢管的连接结构和连接技术
    • JP2012214970A
    • 2012-11-08
    • JP2011078859
    • 2011-03-31
    • Nippon Steel & Sumikin Metal Products Co LtdKajima CorpTomita Seisakusho:Kk日鐵住金建材株式会社株式会社富田製作所鹿島建設株式会社
    • TATSUKI MASABUMIKAWABATA NORIYUKIOTAKA NORIHIROKASAHARA KEIHAYASHI NOBORUSUDA KUMIKOMIMURO KEIJITAIRA YOHEITOMITA DAIJIROTOMITA HIDEO
    • E21D9/04E02D5/04E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To provide a connection structure and a connection technique for steel pipe for pipe roof technique of earth retaining by pushing pipes in a parallel arrangement into an outer peripheral region of an excavation cross section.SOLUTION: An outer joint pipe 2 is attached to an end of a steel pipe 1, an inner joint pipe 3 is attached to an opposite end of the steel pipe 1, and the outer joint pipe 2 and inner joint pipe 3 are fitted and connected. Through holes 2c, 3c which are arranged having centers aligned with each other are provided in circumferential directions of intermediate parts of both the joint pipes 2, 3 in pipe-axial directions. In an inner peripheral surface of the inner joint pipe 3, female screw members 5 are installed having centers of their screw holes 5b aligned with centers of the through holes 3c of the inner joint pipe 3. The inner joint pipe 3 is fitted in a hollow part of the outer joint pipe 2, pin materials 6 are fitted in the through holes 2c of the outer joint pipe 2 and the through holes 3c of the inner joint pipe 3 which have the center aligned with each other, and bolts 7 inserted into bolt through holes 6a of the pin materials 6 are screwed in the screw holes 5b of the female screw members 5 to be fastened.
    • 要解决的问题:为了提供一种用于将平行布置的管道并入挖掘横截面的外周区域中的用于管道顶管技术的钢管的连接结构和连接技术。

      解决方案:外管接头管2安装在钢管1的一端,内接管3安装在钢管1的另一端,外接头管2和内接头管3 安装和连接。 在两个接合管2,3的管轴方向的中间部分的圆周方向上设置有具有彼此对准的中心的通孔2c,3c。 在内侧接头管3的内周面上,内螺纹部件5设置有与内侧接头管3的贯通孔3c的中心对齐的螺纹孔5b的中心。内侧接头管3嵌入中空部 外部接合管2的一部分,销6材料6被装配在外侧接头管2的通孔2c和内侧接头管3的通孔3c中,它们具有中心对准的位置,螺栓7插入螺栓 销钉材料6的通孔6a拧入阴螺纹部件5的螺钉孔5b中以进行紧固。 版权所有(C)2013,JPO&INPIT

    • 2. 发明专利
    • Joint structure for steel pipe
    • 钢管接头结构
    • JP2013011095A
    • 2013-01-17
    • JP2011143997
    • 2011-06-29
    • Nippon Steel & Sumikin Metal Products Co Ltd日鐵住金建材株式会社Kajima Corp鹿島建設株式会社Tomita Seisakusho:Kk株式会社富田製作所
    • TATSUKI MASABUMIKAWABATA NORIYUKIOTAKA NORIHIROHAYASHI NOBORUSUDA KUMIKOMIMURO KEIJITAIRA YOHEITOMITA HIDEO
    • E02D5/24E02D5/28
    • PROBLEM TO BE SOLVED: To provide a joint structure for extending and connecting steel pipes to each other in an axial direction.SOLUTION: In a joint structure, an outer joint pipe 2 is attached to an end part of one steel pipe 1, an inner joint pipe 3 is attached to an end part of the other steel pipe 1, and the inner joint pipe 3 is fitted into the outer joint pipe 2 to connect both steel pipes 1 to each other. The inner joint pipe 3 and the outer joint pipe 2 are provided with pin holes 2c, 3c at a plurality of positions, respectively, the pin holes 2c, 3c being arranged so that respective centers thereof coincide with each other. Female screw members 5 are arranged and fixed on the inner peripheral surface of the inner joint pipe 3, in the state of matching the female screw members 5 to the centers of the pin holes 3c. Coupling pins 6 or 6' to be inserted into the pin holes 2c, 3c of both joint pipes are collared pins, each having a collar part 6b at the outer end part thereof, the collar part hitting against the outer peripheral surface of the outer joint pipe 2. The collared pins 6 or 6' are inserted from the pin holes 2c of the outer joint pipe 2 to the pin holes 3c of the inner joint pipe 3, and slip-off preventing bolts 7 inserted through bolt through-holes 6a are screwed into screw holes 5b of the female screw members 5 and fastened to fix the collared pins 6.
    • 要解决的问题:提供一种用于沿着轴向将钢管彼此延伸和连接的接头结构。 解决方案:在接头结构中,外接头管2安装在一根钢管1的端部,内接头管3安装在另一钢管1的端部,内接头管 3配合在外侧接头管2中,将两个钢管1相互连接。 内侧接头管3和外侧接头管2分别在多个位置设置有销孔2c,3c,销孔2c,3c配置成使其各个中心重合。 在将内螺纹构件5与销孔3c的中心匹配的状态下,内螺纹构件5布置并固定在内接头管3的内周面上。 插入两个接头管的销孔2c,3c中的接头销6或6'是在其外端部分具有凸缘部分6b的套环销,套环部分抵靠外接头的外周表面 套管销6或6'从外接头管2的销孔2c插入到内接头管3的销孔3c中,并且通过螺栓通孔6a插入的防脱螺栓7是 拧入阴螺纹构件5的螺钉孔5b并固定以固定针孔6。版权所有(C)2013,JPO&INPIT
    • 4. 发明专利
    • Execution method of underground structure
    • 地下结构的执行方法
    • JP2012026106A
    • 2012-02-09
    • JP2010163608
    • 2010-07-21
    • Kajima CorpMetropolitan Expressway Co Ltd首都高速道路株式会社鹿島建設株式会社
    • SASAKI YUTAKAMATSUMOTO SEIJIROHAYASHI NOBORUIWASHITA ZENICHIRONAKAGAWA MASAYOSHINAKAGAWA YOSHIAKIKUSAKABE IKUOOHASHI MASAKI
    • E21D9/04E21D9/01E21D13/02
    • PROBLEM TO BE SOLVED: To provide a construction method of an underground structure capable of constructing a high-quality underground structure with excellent workability.SOLUTION: Steel pipes 13 are approximately straight in the axial direction and installed in an arch shape so as to straddle above a tunnel 5. Plate members 15 are provided in the outside of the steel pipes 13. The plate members 15 are joined to the steel pipes 13 by welding or the like in advance and formed along the longitudinal direction of the steel pipes 13. The plate members 15 are provided toward both sides of the steel pipes 13. The steel pipes 13 are placed at predetermined intervals so that the plate members 15 of the adjacent steel pipes 13 overlap each other. An excavation part 23 is constructed by excavating under a pipe roof 7 and sediment between the steel pipes 13 is removed. Mortar 27 is placed in a region between the steel pipes 13 under the plate members 15. When the mortar 27 is consolidated, the steel pipes 13 are integrated.
    • 要解决的问题:提供一种能够构造出具有优异的可加工性的高质量地下结构的地下结构的施工方法。 解决方案:钢管13在轴向方向上大致直线,并且以弓形形式安装成跨越隧道5上方。板构件15设置在钢管13的外侧。板构件15接合 预先通过焊接等将钢管13沿着钢管13的长度方向形成在钢管13上。板构件15朝向钢管13的两侧设置。钢管13以规定间隔配置, 相邻钢管13的板构件15彼此重叠。 挖掘部23通过在管顶7下方挖掘而形成,钢管13之间的沉积物被去除。 砂浆27被放置在板构件15下方的钢管13之间的区域中。当砂浆27被固结时,钢管13被一体化。 版权所有(C)2012,JPO&INPIT
    • 6. 发明专利
    • Pipe roof construction method
    • 管道屋顶施工方法
    • JP2012215025A
    • 2012-11-08
    • JP2011081352
    • 2011-04-01
    • Kajima CorpSugino Machine Ltd株式会社スギノマシン鹿島建設株式会社
    • SUDA KUMIKOHAYASHI NOBORUIWASHITA ZENICHIROMIMURO KEIJIHASHIMOTO ISAMUMITSUBE MASAOITO KOICHISHIMOSAKA SHINYA
    • E21D9/04E21D13/02
    • PROBLEM TO BE SOLVED: To provide a pipe roof construction method excellent in workability for enabling the removal of frozen soil and sediment from between steel pipes without giving damage to the frozen soil.SOLUTION: On a moving device 21, an up-and-down moving part 25 is also provided. The up-and-down moving part 25 can move a nozzle 27 mounted at the front end, in a direction perpendicular to the axial direction of steel pipes 3 by a motor, etc. The nozzle 27 is connected to a water forcing device, etc., rotatably via a swivel joint, etc., with the moving direction of the up-and-down moving part 25 as an axis. The nozzle 27 is therefore movable in the axial direction of the steel pipes 3 and in the direction perpendicular thereto and capable of spraying water while rotating itself. According to this invention, water spray is accompanied by the measurement of the temperature of frozen soil.
    • 要解决的问题:提供一种优良的可加工性的管道屋顶施工方法,其能够从钢管之间移除冻结的土壤和沉积物,而不会对冻土造成损害。 解决方案:在移动装置21上还设有上下移动部分25。 上下移动部25能够通过电动机等使安装在前端的喷嘴27沿与钢管3的轴向垂直的方向移动。喷嘴27与水力装置等连接 可旋转地经由旋转接头等以上下移动部件25的移动方向为轴。 因此,喷嘴27能够沿着钢管3的轴向并且在与其垂直的方向上移动,并且能够在旋转自身的同时喷洒水。 根据本发明,水喷雾伴随着冻土温度的测量。 版权所有(C)2013,JPO&INPIT
    • 7. 发明专利
    • Vehicle guide device
    • 车辆指导装置
    • JP2009013685A
    • 2009-01-22
    • JP2007177295
    • 2007-07-05
    • Kajima Corp鹿島建設株式会社
    • YOSHIDA TADASHIHAYASHI NOBORUKUMABE TAKEHIKOKITAYAMA MAKOTONAKAMURA YASUHIRO
    • E01F9/00
    • PROBLEM TO BE SOLVED: To provide a chance of guide to the driver of a vehicle for returning a vehicle speed to an original speed if a change occurs in the vehicle speed through a change point where the change in vehicle speed occurs.
      SOLUTION: This vehicle guide device 1 comprises: a previous speed sensor 2 installed in a position facing a road including the change point P where a change occurs in the vehicle speed and detecting the traveling speed V1 of the vehicle before it passes through the change point P; a following speed sensor 3 for detecting the traveling speed V2 of the vehicle 6 after it passes through the change point P; a plurality of light emitting bodies 4 installed along the road; and a controller 5 for transmitting light emission instructions to the light emitting bodies 4 according to the presence or absence of the difference (|V1-V2|) between the detected value V2 of the previous speed sensor 3 and the detected value V1 of the previous speed sensor 2. The controller 5 sets a light emitting speed v at which the light emitted from the light emitting bodies 4 travels in the traveling direction of the vehicle 6 according to the difference (|V1-V2|).
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:如果通过发生车辆速度变化的变化点在车速上发生变化,则提供引导车辆驾驶员将机速恢复到原始速度的机会。 该车辆引导装置1包括:安装在面向道路的位置的前一个速度传感器2,该位置包括在车速发生变化的变化点P,并且在车辆通过之前检测车辆的行驶速度V1 变化点P; 用于检测车辆6通过变化点P后的行驶速度V2的跟随速度传感器3; 沿道路安装的多个发光体4; 以及控制器5,用于根据先前速度传感器3的检测值V2与前一个速度传感器的检测值V1之间是否存在差值(¾V1-V2¾),向发光体4发送发光指令 控制器5根据差值(¾V1-V2¾)设定发光体4发出的光在车辆6的行进方向上行进的发光速度v。 版权所有(C)2009,JPO&INPIT