    • 4. 发明专利
    • Construction method of shaft
    • 轴的构造方法
    • JP2005133339A
    • 2005-05-26
    • JP2003367762
    • 2003-10-28
    • Kajima CorpKomatsu Im Engineering Kkコマツアイエムエンジニアリング株式会社鹿島建設株式会社
    • MIMURO KEIJISASAKI YUKINOBUOWAKI MASASHIISHII YOSHIHARUKUSHIDA SHINJISHIMIZU NOBUAKI
    • E21D3/00E21D5/08E21D9/04
    • PROBLEM TO BE SOLVED: To provide a shaft construction method and a shaft economically constructible neither occupying a ground part all the time nor affecting environment around.
      SOLUTION: A plurality of steel pipes 17 are jacked toward the ground from start ports provided at segments 23 of a tunnel 3, and a pipe roof 25 is formed in cylindrical shape. Freezing work 29 is then performed to cut off water in spaces of the pipe roof 25, and an excavated sediment throw-in hole 31 is formed in the ground 1 inside the pipe roof 25. While recovering the excavated sediment in the tunnel 3 through the excavated sediment throw-in hole 31, the inside of the pipe roof 25 is excavated, and a cut-off iron plate 33 or the like is installed along the inner periphery of the pipe roof 25. Further, the segments 23 of the tunnel 3 located inside the pipe roof 25 are removed leaving a segment main girder 39, and secondary lining 37 is installed inside the cut-off iron plate 33 to complete the shaft 41.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供轴施工方法和经济可施工的轴既不占用地面部分也不影响周围的环境。 解决方案:多个钢管17从设置在隧道3的段23处的起始端口朝向地面顶起,并且管屋顶25形成为圆柱形。 然后执行冷冻工作29以在管道屋顶25的空间中切断水,并且在管道顶部25内的地面1中形成挖掘的沉积物入口31。在通过隧道3中挖掘的沉积物通过 挖出的沉积物投入孔31,挖掘出管顶25的内侧,沿着管顶25的内周设置有切断铁板33等。此外,隧道3的段23 排除在管顶25内部,留下段主梁39,第二衬里37安装在切割铁板33内,以完成轴41.版权所有(C)2005,JPO&NCIPI
    • 5. 发明专利
    • Shield tunnel joining method
    • SHIELD隧道加工方法
    • JP2005273212A
    • 2005-10-06
    • JP2004085329
    • 2004-03-23
    • Kajima CorpKomatsu Ltd株式会社小松製作所鹿島建設株式会社
    • SASAKI YUKINOBUKIDA HIROMITSUEMORI MICHIOSHINTAKU AKIJI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a shield tunnel joining method superior in water cut-off performance, by putting the stability of the natural ground in a high state by a shield excavator having a simple constitution, when joining two shield tunnels.
      SOLUTION: A first tunnel is excavated up to a first tunnel excavating position by a first shield machine 1, and a second tunnel is excavated up to a second tunnel excavating position by a second shield machine 2. At this time, a shield machine arriving first of all is set as the first shield machine 1. Then, a first cutter device 11 of the first shield machine 1 is retreated up to the inside of a first outer cylinder part 10. Then, the second shield machine 2 is advanced, to excavate sediment between the first tunnel and the second tunnel. Afterwards, a second cutter device 21 is diametrally contracted, and the second shield machine 2 is further advanced. Then, after the first outer cylinder part 10 is opposed to a second outer cylinder 20, a second cutter device 21A and a movable inner cylinder 21E are advanced inside the first outer cylinder part 10.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种在截水性能优异的屏蔽隧道接合方法中,通过具有简单结构的盾构式挖掘机将天然地面的稳定性提高到高状态时,当连接两个盾构通道时。 解决方案:通过第一屏蔽机1将第一隧道挖掘到第一隧道挖掘位置,并且通过第二屏蔽机2将第二隧道挖掘到第二隧道挖掘位置。此时,屏蔽 首先到达的机器被设置为第一屏蔽机1.然后,第一屏蔽机1的第一切割装置11退回到第一外筒部10的内部。然后,第二屏蔽机2前进 挖掘第一隧道与第二隧道之间的沉积物。 之后,第二切割装置21径向收缩,第二屏蔽机2进一步前进。 然后,在第一外筒部10与第二外筒20相对后,第二切割装置21A和可动内筒21E在第一外筒部10的内部前进。版权所有(C)2006,JPO&NCIPI
    • 7. 发明专利
    • Method of constructing underground structure
    • 构造地下结构的方法
    • JP2009174178A
    • 2009-08-06
    • JP2008013421
    • 2008-01-24
    • Kajima Corp鹿島建設株式会社
    • SASAKI YUTAKASASAKI YUKINOBUKAWABATA JUNICHIINAO MICHIHIROYOKOO ATSUSHIOKUYAMA MASAYOSHIMORIYAMA TAKAMIYANAGISAWA HIROSHIKANDA KENJI
    • E21D13/02E02D29/045E21D11/10E21D13/00
    • PROBLEM TO BE SOLVED: To provide a method of constructing an underground structure capable of constructing a large space under a ground without applying a load to the environment therearound.
      SOLUTION: After the state of a ground 1 at the positions of adits 11 to be excavated is confirmed by adit section spring search boring 7, the adits 11 are excavated from a tunnel 3 to a range involving the position 9 where the underground structure is to be constructed at predetermined intervals in the axial direction of the tunnel 3. Next, after the state of the ground 1 at the positions of a pilot tunnel 19 to be excavated is confirmed by pilot tunnel section spring search boring 17, the pilot tunnel 19 for joining the adjacent adits 11 to each other near the ends thereof is excavated. Then, after the state of the ground 1 at the positions of deep foundation piles 25 to be constructed is confirmed by deep foundation section spring search boring 25, deep foundation piles 27 are constructed vertically at predetermined intervals in the axial direction of the pilot tunnel 19. The area between the tunnel 3 and the pilot tunnel 19 is excavated and a pile cap concrete 33 is placed, and the areas between the tunnel 3 and the deep foundation piles 27 are excavated and the base concrete 37 and a sidewall concrete 41 are placed.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种构造地下结构的方法,该地下结构能够在没有对其周围的环境施加负载的情况下在地面下构造大的空间。

      解决方案:在通过辅助部分弹簧搜索镗孔7确认在待挖掘的钻头11的位置处的地面1的状态之后,将钻头11从隧道3挖掘到涉及位置9的范围,其中地下 在隧道3的轴向方向上以预定的间隔构造结构。接下来,在通过导频隧道截面弹簧搜索钻孔17确认在待挖掘的先导隧道19的位置处的地面1的状态之后, 挖掘出用于将相邻的钻头11彼此靠近的端部连接的隧道19。 然后,在深基础截面弹簧搜索镗孔25确认在构造的深基础桩25的位置处的地面状态1之后,在导向通路19的轴向上以预定间隔垂直地构造深基础桩27 挖掘隧道3与先导隧道19之间的区域,放置堆垛混凝土33,挖掘隧道3和深基础桩27之间的区域,并将基础混凝土37和侧壁混凝土41放置 。 版权所有(C)2009,JPO&INPIT

    • 9. 发明专利
    • Lining member for width-enlarging type shield excavator
    • 宽宽类型盾构挖掘机的内衬构件
    • JP2007192023A
    • 2007-08-02
    • JP2007116710
    • 2007-04-26
    • Kajima CorpMitsubishi Heavy Ind Ltd三菱重工業株式会社鹿島建設株式会社
    • SASAKI YUKINOBUOSAWA ICHIRONIWA AKIOSUGIYAMA MASAHIKO
    • E21D11/00E21D9/06
    • PROBLEM TO BE SOLVED: To provide a lining member which can sufficiently absorb tail clearances on both longitudinal ends of an existing segment, in a width-enlarging type shield excavator.
      SOLUTION: The width-enlarging type shield excavator comprises a main excavator (1) and sub-excavators (2a, 2b) provided on both sides thereof. An axial line of each of the sub-excavators (2a, 2b) is displaced relative to an axial line of the main excavator (1) so that excavation may be conducted while enlarging the width. The lining member (4) used for the width-enlarging type shield excavator comprises a plurality of pieces including at least four corner parts (20a) as in Fig. 4. A bolt fitting hole (20A) for fitting a new segment (20A) to the existing segment (20) of each of the corner parts (20a) is formed to be an arc-like long hole having a center of the segment as the center of the arc-like shape.
      COPYRIGHT: (C)2007,JPO&INPIT