热词
    • 5. 发明专利
    • Construction method of shield tunnel inside road having width expanded part and segment used therefor
    • 隧道内宽度扩大部分的道路隧道施工方法及其使用的部分
    • JP2007009562A
    • 2007-01-18
    • JP2005192591
    • 2005-06-30
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • YAMAMORI NORIYASU
    • E21D9/06E21D11/00
    • PROBLEM TO BE SOLVED: To construct a road having a width expanded part in a shield tunnel, without impairing stability of the outer peripheral ground, by restraining high pressure water injected into the outer peripheral ground for excavating the outer peripheral ground of the shield tunnel from acting on the outer peripheral ground over a wide range.
      SOLUTION: This construction method of the shield tunnel inside road having the width expanded part constructs the shield tunnel by using a plurality of width expanding segments arranged in a side wall part of the shield tunnel, a clearance forming means and a seal means arranged between the width expanding segments and a segment adjacent to the segments. A sheet pipe is inserted into clearance generated by removing the clearance forming means, and the sheet pile is pushed out to the outer peripheral ground of the shield tunnel, and while excavating the outer peripheral ground between the sheet piles by an excavating means via the width expanding segments, the width expanding segments are pushed out to the outer peripheral ground of the shield tunnel, and afterwards, the road having the width expanded part is constructed in the shield tunnel.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了在屏蔽隧道内构造具有宽度扩大部分的道路,而不损害外围地面的稳定性,通过限制注入外围地面的高压水来挖掘外围地面的外围地面 屏蔽隧道在宽范围内作用于外围地面。 解决方案:具有宽度扩大部分的道路内的屏蔽隧道的施工方法通过使用布置在屏蔽隧道的侧壁部分中的多个宽度扩大段构成屏蔽隧道,间隙形成装置和密封装置 布置在宽度扩展段和与段相邻的段之间。 将纸管插入到通过移除间隙形成装置而产生的间隙中,并且将片材堆被推出到盾构通道的外周边地面,并且在通过挖掘装置通过宽度挖掘板桩之间的外围地面 扩展段,宽度扩大段被推出到屏蔽隧道的外围地面,之后,具有宽度扩展部分的道路被构造在屏蔽隧道中。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • SHIELDING CONSTRUCTION METHOD
    • JPH11294068A
    • 1999-10-26
    • JP9905098
    • 1998-04-10
    • KUMAGAI GUMI CO LTD
    • KIDO YOSHIKAZUYAMAMORI NORIYASUSASAKI HIROBUMIKODA MAKOTOMIMURA TOMOO
    • E21D9/06E21D9/08E21D9/087
    • PROBLEM TO BE SOLVED: To reduce clearance with bedrock by boring along a tunnel external shape in the boring machine frong/rear parts by using the boring machine having an overbreak device and expanded width cylinders in the radial direction and capable varying an expanded width quantity in the shield longitudinal direction. SOLUTION: Overbreak is started from when a front face 20F of a shielding boring machine 20 reaches this side by the machine length L from a first taper starting point P1, and the front face 20F reaches the taper starting point P1 to become a maximum overbreak quantity. Next, expanded with cylinders 3L, 3R are expanded to perform excavation while expanding a longitudinal expanded width of the boring machine 20 until the front face 20F reaches a taper end point Q1. Next, boring is propelled by an expanded shield up to reaching a second taper starting point P2, and the boring is propelled by reducing the front face 20F until the tail 20T reaches the taper starting point P2. In that case, the overbreak is resumed from when the front face 20F advances to this side by the machine length L from a taper end point Q2, and afterwards, an overbreak quantity is reduced, and after the tail 20T passes through the taper end point Q2, the boring is ordinarily advanced. Therefore, clearance with bedrock can be reduced.