会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Segment and manufacturing method of the segment
    • 分段的制造和制造方法
    • JP2006118307A
    • 2006-05-11
    • JP2004309661
    • 2004-10-25
    • Geostr CorpKumagai Gumi Co Ltdジオスター株式会社株式会社熊谷組
    • YAMAMORI NORIYASUFUJINO YUTAKA
    • E21D11/08E21D11/04
    • PROBLEM TO BE SOLVED: To provide a segment and a manufacturing method of the segment capable of solving such problems that the conventional segment is not made to connect steel plates mounted on every surface thereof to each other, there is a possibility to leak ground water to the inside of a tunnel through the inside of the segment between both steel plates and that there is a possibility to accelerate the corrosion of reinforcement of the inside of the segment by entering ground water into cracks occurred in the inside of the segment.
      SOLUTION: The segment 1 is equipped with a segment body 1A formed by a concrete, plates (metal plates 3; 3A) respectively mounted on sides 6; 6; 7; 7 other than the inside 2 of the segment body 1A as the inside of a tunnel wall body and the outside 5 and a connecting body (welding section 4) connecting both end sections of the plates to each other in a water-tight state in a boundary between both surfaces of the segment body.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供能够解决传统的段不将安装在其每个表面上的钢板彼此连接的问题的段的段和制造方法,可能泄漏 将地下水通过两钢板之间的段内部的隧道内部,并且通过将地下水进入段内发生的裂缝,可能加速段内部的钢筋腐蚀。 解决方案:段1配备有由混凝土形成的段体1A,分别安装在侧面6上的板(金属板3; 3A) 6; 7; 除了作为隧道壁体的内部的段主体1A的内部2以外的外部5以及连接体(焊接部4)的连接体(焊接部4)以不透水的状态彼此连接, 分段体的两个表面之间的边界。 版权所有(C)2006,JPO&NCIPI
    • 4. 发明专利
    • Joint hardware for segment
    • 联合硬件分部
    • JP2005002706A
    • 2005-01-06
    • JP2003169025
    • 2003-06-13
    • Geostr CorpKumagai Gumi Co LtdTokyo Metro Co Ltdジオスター株式会社東京地下鉄株式会社株式会社熊谷組
    • YAMAMORI NORIYASUKIDO YOSHIKAZUKAWACHI HIROTOMOYAHAGI SHUICHIFUJIKI IKUOOISHI TAKASHIFUJINO YUTAKAUDAGAWA NORIHIKOIWATA KAZUSANE
    • E21D11/04
    • PROBLEM TO BE SOLVED: To provide a joint metal fitting for a segment, for securing rigidity to shearing force and tensile force acting on a joint part, by integrally casting a hardware body and an anchor member.
      SOLUTION: The joint metal fitting 30 for the segment is composed of a bolt installing part 31 for forming a bolt inserting hole 31s, a joint body 34 for forming a fastening space part 33 arranged on the back face side of this bolt installing part 31, a first anchor member 35 projected in parallel to the shaft direction of the bolt inserting hole 31s from the outer peripheral part back face side of this joint body 34, and a second anchor member 36 projected in the center of an outer peripheral part of the joint body 34, so as to incline obliquely backward to a side surface 10c becoming a connecting surface of the segments 10 and 10 adjacent in the axis direction of a heading. The joint body 34, the first anchor member 35, and the second anchor member 36 are integrally formed by casting.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过一体铸造五金体和锚定构件,提供用于段的接头金属接头,用于确保作用在接头部分上的剪切力和张力的刚度。 解决方案:用于该段的接头金属配件30由用于形成螺栓插入孔31s的螺栓安装部31,用于形成紧固空间部33的接合体34构成,该紧固空间部33布置在该螺栓安装的背面侧 部分31,从该接头本体34的外周部分背面侧平行于螺栓插入孔31s的轴向平行地突出的第一锚定部件35,以及突出在外周部分的中心的第二锚定部件36 以便倾斜地向后倾斜成为在标题的轴线方向上相邻的段10和10的连接表面的侧表面10c。 接头体34,第一锚固构件35和第二锚定构件36通过铸造一体地形成。 版权所有(C)2005,JPO&NCIPI
    • 7. 发明专利
    • Construction method of shield tunnel inside road having width expanded part and segment used therefor
    • 隧道内宽度扩大部分的道路隧道施工方法及其使用的部分
    • JP2007009562A
    • 2007-01-18
    • JP2005192591
    • 2005-06-30
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • YAMAMORI NORIYASU
    • E21D9/06E21D11/00
    • PROBLEM TO BE SOLVED: To construct a road having a width expanded part in a shield tunnel, without impairing stability of the outer peripheral ground, by restraining high pressure water injected into the outer peripheral ground for excavating the outer peripheral ground of the shield tunnel from acting on the outer peripheral ground over a wide range.
      SOLUTION: This construction method of the shield tunnel inside road having the width expanded part constructs the shield tunnel by using a plurality of width expanding segments arranged in a side wall part of the shield tunnel, a clearance forming means and a seal means arranged between the width expanding segments and a segment adjacent to the segments. A sheet pipe is inserted into clearance generated by removing the clearance forming means, and the sheet pile is pushed out to the outer peripheral ground of the shield tunnel, and while excavating the outer peripheral ground between the sheet piles by an excavating means via the width expanding segments, the width expanding segments are pushed out to the outer peripheral ground of the shield tunnel, and afterwards, the road having the width expanded part is constructed in the shield tunnel.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了在屏蔽隧道内构造具有宽度扩大部分的道路,而不损害外围地面的稳定性,通过限制注入外围地面的高压水来挖掘外围地面的外围地面 屏蔽隧道在宽范围内作用于外围地面。 解决方案:具有宽度扩大部分的道路内的屏蔽隧道的施工方法通过使用布置在屏蔽隧道的侧壁部分中的多个宽度扩大段构成屏蔽隧道,间隙形成装置和密封装置 布置在宽度扩展段和与段相邻的段之间。 将纸管插入到通过移除间隙形成装置而产生的间隙中,并且将片材堆被推出到盾构通道的外周边地面,并且在通过挖掘装置通过宽度挖掘板桩之间的外围地面 扩展段,宽度扩大段被推出到屏蔽隧道的外围地面,之后,具有宽度扩展部分的道路被构造在屏蔽隧道中。 版权所有(C)2007,JPO&INPIT
    • 8. 发明专利
    • Joining method for shield, and structure of arrival protective barrier
    • 屏蔽接合方法及结构防护障碍
    • JP2005120699A
    • 2005-05-12
    • JP2003356668
    • 2003-10-16
    • Hazama CorpKumagai Gumi Co LtdNishimatsu Constr Co LtdPenta Ocean Constr Co LtdShimizu CorpTokyu Construction Co Ltd五洋建設株式会社東急建設株式会社株式会社熊谷組株式会社間組清水建設株式会社西松建設株式会社
    • YAMAMORI NORIYASUKIDO YOSHIKAZU
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a joining method for a shield which can surely prevent the intrusion of underground water when a new shield tunnel is joined to an arrival pit mouth of an existing pipe or a vertical shaft in a direction crossing the arrival pit mouth of the existing pipe or the vertical shaft, and a structure of an arrival protective barrier.
      SOLUTION: A steel tubular body 13 through which a cutting reinforcing ring 22 passes is installed on the outer peripheral side in a position to be cut by the cutting reinforcing ring 22 of a shield machine 20 of the existing tunnel 10, so that cut-off material injection holes 14 can be formed in a plurality of places around the tubular body 13. A plurality of U-shaped pipes 15 for injecting cut-off materials are arranged on the inner peripheral side of the tubular body 13. After that, the tubular body 13 is closed with a lid body 16 and held by a support 17; a filling material such as concrete is infilled into the tubular material 13, so that a filling material layer 18 can be formed for the construction of the arrival protective barrier; and the cut-off material is injected into the periphery of the cutting reinforcing ring 22 from the inside and outside of the existing tunnel 10 in jointing with a newly constructed tunnel 20T.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种能够确保防止当新的屏蔽隧道沿着与现有管道或垂直轴的到达坑口接合的方向时可以防止地下水入侵的接合方法 现有管道或垂直轴的到达坑口,以及到达防护屏障的结构。 解决方案:通过现有隧道10的屏蔽机20的切割加强环22在外周侧上安装有切割加强环22通过的钢管体13,使得 切断材料注入孔14可以形成在管状体13周围的多个位置。用于注入截断材料的多个U形管15布置在管状体13的内周侧。之后 管状体13用盖体16封闭并由支撑体17保持; 填充材料如混凝土填充到管状材料13中,从而可以形成填充材料层18用于构建到达保护屏障; 并且将切断材料从现有隧道10的内部和外部注入到切割加强环22的周边,并与新建的隧道20T连接。 版权所有(C)2005,JPO&NCIPI
    • 9. 发明专利
    • Segment connection device and segment
    • 分段连接设备和分段
    • JP2007146379A
    • 2007-06-14
    • JP2005338737
    • 2005-11-24
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • YAMAMORI NORIYASUTSUYUKI NOBORU
    • E21D11/04E21D11/08
    • PROBLEM TO BE SOLVED: To solve a problem of conventional segment connection devices wherein so-called openings and dislocation occur in a connected portion between the joint faces of segments, and underground water or slurry flows into the wall body of a shield tunnel.
      SOLUTION: This segment connection device is composed of a male joint 20 fitted to one segment joint face 8 of one segment 2A and a female joint 30 fitted to the other segment joint face 9 of the other segment 2B. The male joint 20 comprises a female screw hole 21 and a headed bolt 22. The female joint 30 comprises a male screw part insertion groove 31 and a head part storage part 32. The head part storage part 32 comprises a space 37 formed in such a size that a tool inserted from the outside of the other ring joint surface 11 of the other segment 2B into the head part storage part 32 can be operated so that the head part 25 of the bottomed bolt 22 can be pressingly engaged with the male screw part insertion groove 31 by advancing the bottomed bolt 22 stored in the head part storage part 32 in the inner direction of one segment.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了解决传统的分段连接装置的问题,其中所谓的开口和位错发生在节段的接合面之间的连接部分中,并且地下水或浆料流入屏蔽隧道的壁体 。 解决方案:该段连接装置由安装在一段2A的一个节段接合面8上的阳接头20和与其它段2B的另一段接合面9嵌合的阴接头30组成。 公接头20包括内螺纹孔21和头螺栓22.阴接头30包括外螺纹部分插入槽31和头部存储部32.头部保持部32包括形成在这样的位置的空间37。 可以使从另一部分2B的另一个环形接合表面11的外部插入到头部收容部32中的工具的尺寸使得有底螺栓22的头部25能够与外螺纹部分 通过使存储在头部收容部32中的有底螺栓22沿着一个部分的内侧方向推进而插入槽31。 版权所有(C)2007,JPO&INPIT
    • 10. 发明专利
    • Underground passage between shielded tunnels and its construction method
    • 屏蔽隧道之间的地下通道及其施工方法
    • JP2007002574A
    • 2007-01-11
    • JP2005185617
    • 2005-06-24
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • YAMAMORI NORIYASU
    • E21D9/00
    • PROBLEM TO BE SOLVED: To allow the economical construction of an underground passage between shielded tunnels by reducing an excavation quantity of the ground by miniaturizing a hollow body for regulating a passage space.
      SOLUTION: This underground passage is arranged between the two shielded tunnels extending in substantially parallel at an interval, communicates with both tunnels, and is composed of the hollow body regulating the passage space and a reinforcing structure reinforcing the hollow body. The hollow body is joined to a first opening formed on the side wall of one shielded tunnel on one side of the passage space, and joined to a second opening formed on the side wall of the other shielded tunnel on the other side of the passage space.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了通过减小​​用于调节通道空间的中空体的小型化来减少地面的挖掘量,从而经济地构造屏蔽隧道之间的地下通道。 解决方案:该地下通道布置在两个屏蔽的隧道之间,间隔大致平行延伸,与两个隧道连通,并由调节通道空间的中空体和加强中空体的加强结构组成。 中空体与形成在通道空间的一侧的一个屏蔽通道的侧壁上的第一开口接合,并且与通道空间另一侧的另一屏蔽通道的侧壁上形成的第二开口接合 。 版权所有(C)2007,JPO&INPIT