热词
    • 6. 发明专利
    • Outer shell member and construction method of connecting tunnel
    • 外部会员及连接隧道的施工方法
    • JP2007197957A
    • 2007-08-09
    • JP2006016215
    • 2006-01-25
    • Jfe Metal Products & Engineering IncJfe建材株式会社Taisei Corp大成建設株式会社
    • MORITA TAIJIWATABE SHOICHITAKAKURA KATSUHIKOTOKIDA KAZUYAMATSUOKA KAORU
    • E21D13/04
    • PROBLEM TO BE SOLVED: To provide an outer shell member capable of easily connecting a part between adjacent tunnels, by reducing structural uselessness.
      SOLUTION: An earth retaining box body 2 forms an outer shell of at least one tunnel when adjacently constructing a plurality of tunnels 1, etc. in the ground, and has a plate-like earth retaining plate 3 formed in a width extended between the tunnels and a hinge 4 rotatably supporting one side in the width direction of the earth retaining plate 3 in the outer shell of the first tunnel 1A. The earth retaining plate 3 is arranged on the first tunnel 1A side provided with the hinge 4 before constructing the adjacent second tunnel 1B, and is extended between the tunnels 1A and 1B by rotating around a shaft part 41 after constructing the adjacent second tunnel 1B.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:通过减少结构上的无用性,提供能够容易地连接相邻隧道之间的部件的外壳构件。 解决方案:当在地面上相邻地构造多个隧道1等时,挡土箱体2形成至少一个隧道的外壳,并且具有形成为宽度延伸的板状接地保持板3 在第一隧道1A的外壳中,在隧道与铰链4之间可旋转地支撑在挡土板3的宽度方向上的一侧的铰链4。 在构造相邻的第二隧道1B之前,地板保持板3布置在设置有铰链4的第一隧道1A侧,并且在构造相邻的第二隧道1B之后围绕轴部41旋转而在隧道1A和1B之间延伸。 版权所有(C)2007,JPO&INPIT
    • 8. 发明专利
    • Interposition pipe-jacking machine and split caisson-body interposition jacking method
    • 插管式封口机和分体式CAISSON-BODY INTERPOSITION JACKING METHOD
    • JP2005248512A
    • 2005-09-15
    • JP2004058932
    • 2004-03-03
    • Ishikawajima Constr Materials Co LtdIshikawajima Harima Heavy Ind Co LtdKidoh Construction Co LtdTaisei Corp大成建設株式会社機動建設工業株式会社石川島建材工業株式会社石川島播磨重工業株式会社
    • KANEKO KENICHIYUGUCHI MASAKIOHATA YUTAKAKOYANAGI YOSHIROHATTORI YOSHIFUMIKADOTA KATSUMISUGIMORI MAKOTOHASHIMOTO HIROHIDEWAKABAYASHI MASANORINAKANO MASAAKIARAKI DAISUKE
    • E21D9/06E21D13/02E21D13/04
    • PROBLEM TO BE SOLVED: To provide an interposition jacking apparatus capable of installing a split caisson-body with an excellent accuracy with securing cutoff properties when the split caisson bodies are juxtaposed by an interposition jacking method in construction of a tunnel of a large section, and a split caisson-body interposition jacking method.
      SOLUTION: An interposition pipe-jacking machine 1 is composed of an external cylinder 2, an internal cylinder 3, in which a part can be slid in the external cylinder 2, an interposition jack 4 in the external cylinder 2 and a reaction-receiving cylindrical body 5 being mounted in the internal cylinder 3 and transmitting a reaction by an jack 4 to the split caisson bodies 8 at rears. The interposition pipe-jacking machine 1 is further composed of a rectangular or square-shaped outercoat 6 mounted on the outer periphery of the external cylinder 2. In the interposition pipe-jacking machine 1, a sealant 7 is arranged in an opening between the external cylinder 2 and the internal cylinder 3, a groove 61 extended in the tunnel extending-direction is formed to the outer peripheral surface of the outercoat 6 and the external shapes of the external cylinder 2 and the internal cylinder 3 are molded in similar figures respectively in a rectangle, in which a circular or corner section is curvature-molded, or a square, in which the corner section is curvature-molded. The split caisson bodies 8 are installed by the interposition jacking method by such an interposition pipe-jacking machine 1.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种插入式起重装置,其能够以极高的精度来安装分体式沉箱体,并且当分体式沉箱主体在大型隧道施工中由插入式起重方式并列时,确保切断性能 剖面,以及一个拆分沉箱间插入方法。 解决方案:插入式顶管机1由外筒2,内筒3,外筒2内部可滑动的内筒2,外筒2内插入插入件4和反应 接收圆筒体5安装在内筒3中,并且通过千斤顶4将反作用力传送到分开的沉箱体8。 插入式管顶机1还由安装在外筒2的外周上的矩形或方形外涂层6构成。在插入管顶起机1中,密封剂7布置在外部 气缸2和内筒3,在外涂层6的外周面上形成有向隧道延伸方向延伸的槽61,外筒2和内筒3的外形分别以 其中圆形或角部分是曲率模制的矩形或方形,其中拐角部分被弯曲成型。 分体式沉箱体8通过插入式顶起装置1通过插入顶压方法安装。版权所有:(C)2005,JPO&NCIPI
    • 10. 发明专利
    • METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE
    • JPH10205296A
    • 1998-08-04
    • JP852697
    • 1997-01-21
    • TEKKEN CONSTR CO
    • KASUYA TAROOBATA TSUNEO
    • E21D20/00E21D13/02E21D13/04
    • PROBLEM TO BE SOLVED: To eliminate the need for the removal of a temporary column and an intermediate wall after the completion of a construction process, and to improve operating efficiency by bearing the upper section and lower section of an excavated tunnel wall by anchors, opposing downward earth pressure applied to the tunnel wall by the upper anchor and opposing groundwater pressure applied to the tunnel wall by the lower anchor. SOLUTION: Segments such as an upper gull segment 2, a circular segment 3, a lower gull segment 4, etc., are assembled on a tunnel wall excavated on a ground 1 by utilizing a shaft 11. Upper and lower section anchor pits 14, 15 are drilled in the ground 1, upper and lower section anchor materials are inserted and a grout material is injected upper and lower section anchors 18, 19, in which front ends are bulged, are constituted, and the places of the anchors 18, 19 are adjusted and the anchors 18, 19 are tensed and fixed by fixtures. Accordingly, the tunnel wall is borne by the upper and lower section anchors 18, 19 at the time of the construction works of the tunnel wall, the upper anchor 18 opposes downward earth pressure applied to the tunnel wall, and the lower anchor 19 opposes groundwater pressure applied to the tunnel wall, and the tunnel wall can be held in required strength.