会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明专利
    • Steel pipe pile and supporting structure and construction method using the same
    • 钢管和支撑结构和使用它的结构方法
    • JP2011226264A
    • 2011-11-10
    • JP2011140034
    • 2011-06-24
    • Jfe Steel CorpJfeスチール株式会社
    • WAKIYA HIROSHITATSUMI YUICHI
    • E02D5/56E02D5/28E02D7/22
    • PROBLEM TO BE SOLVED: To provide a steel pipe pile and its supporting structure capable of providing a high tip support force without using a very large blade, and a construction method of the steel pipe pile that facilitates construction of the supporting structure.SOLUTION: On a tip part outer periphery, an auger is inserted into a hollow section of a steel pipe pile which height t is 6 mm or higher and 10% or smaller than a diameter Dof the steel pipe pile 1, which ratio P/t with a pitch P is at 7.7-33 and which has a spiral shaped protrusion 11A of a hanging angle θ of 45 degrees or less, the steel pipe is rotatingly penetrated while excavating a ground 3 with the auger, when the auger head reaches to the section in which a support layer in the ground or a foot protection column 2 including the support layer is constructed, a digging diameter of the auger head is expanded to a corresponding diameter Dof the foot protection column, a solidification liquid is blown out from the auger head while excavating by a height of the foot protection column, the steel pipe pile is rotatingly penetrated into the foot protection column and after finishing the rotating penetrating, while leaving the tip end of the steel pipe pile to the foot protection column, the auger is drawn out, and the solidification liquid is solidified.
    • 要解决的问题:提供一种能够在不使用非常大的叶片的情况下提供高尖端支撑力的钢管桩及其支撑结构,以及有助于支撑结构的构造的钢管桩的施工方法。 解决方案:在顶端部外周上,将螺旋推入高度t为6mm以上且小于直径D 的钢管桩的中空部分 钢管桩1的1 / SB,间距P的比P / t为7.7-33,具有45度以下的悬挂角度θ的螺旋形突起部11A,钢管旋转 当螺旋钻头到达其中构成地面的支撑层或包括支撑层的脚部保护柱2的部分时,用螺旋钻挖掘地面3时被穿透,螺旋钻头的挖掘直径扩大到 脚部保护柱的相应直径D 2 ,在从脚部保护柱的高度挖掘的同时,从螺旋头吹出凝固液,钢管桩旋转穿过 进入脚部保护柱并完成旋转穿透后,同时留下尖端 钢管桩到脚部保护柱,螺旋钻被拔出,凝固液凝固。 版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Composite friction pile
    • 复合摩擦片
    • JP2009191453A
    • 2009-08-27
    • JP2008030351
    • 2008-02-12
    • Jfe Steel CorpJfeスチール株式会社
    • HAYASHI MASAHIROTACHIKA HISAKAZUKONO KENJIUSAMI SHUNSUKEWAKIYA HIROSHI
    • E02D5/46E02D5/28
    • PROBLEM TO BE SOLVED: To provide a composite friction pile provided with projections formed on a surface of a core material of the composite friction pile, efficiently working against stratum.
      SOLUTION: This composite friction pile is constituted by changing diameters of soil cement columnar bodies C
      1 -C
      3 and extending the diameters of the soil cement columnar bodies up to relatively large size in the stratum being likely to generate peripheral face friction force in accordance with peripheral face friction performance between soil sections G
      1 -G
      3 and the soil cement columnar bodies C
      1 -C
      3 .
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种在复合摩擦桩的芯材的表面上形成有突起的复合摩擦堆,有效地对抗地层。

      解决方案:该复合摩擦桩是通过改变土壤水泥柱状体C -C 3 的直径构成的,并将土壤水泥柱状体的直径延伸至 根据土壤段G< SB> -G< SB> 3< SB>和土壤水泥柱体C之间的周边面摩擦性能,层中相对较大的尺寸可能产生周边面摩擦力 1 -C 3 。 版权所有(C)2009,JPO&INPIT

    • 10. 发明专利
    • High-strength electric resistance welded tube for steel pipe pile, and method for manufacturing the same
    • 钢管用高强度电阻焊管及其制造方法
    • JP2011067833A
    • 2011-04-07
    • JP2009219848
    • 2009-09-25
    • Jfe Steel CorpJfeスチール株式会社
    • FUJIOKA YOSHIBUMINAKAZAWA SUSUMUMURAKAMI MUNEYOSHIWAKIYA HIROSHISUZUKI MASAHITO
    • B21C37/08C21D7/02C22C38/00C22C38/06C22C38/58
    • PROBLEM TO BE SOLVED: To provide a high-strength electric resistance welded tube for a steel pipe pile, and a method for producing the same.
      SOLUTION: In the electric resistance welded tube forming step consisting of the roll forming, the electric resistance welding, and the sizing (contraction) of a steel strip at normal temperature, the compressive working strain of 1-5% is adjusted and imparted in the circumferential direction of the tube so that the yield ratio in the circumferential direction of the tube is 85-95%. The steel strip has a composition consisting of, 0.02-0.25% C, ≤0.5% Si, ≤2.0% Mn, ≤0.05% P, ≤0.03% S, or further contains 0.01-0.10% Al, and the balance Fe with inevitable impurities. Further, in addition to the composition, the steel strip may contain one or two or more kinds selected among ≤0.10% Nb, ≤0.10% Ti, and ≤0.10% V, and/or one or two or more selected among ≤0.5% Cu, ≤0.5% Ni, ≤0.5% Mo, and ≤0.5% Cr.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种用于钢管桩的高强度电阻焊管及其制造方法。 解决方案:在常温下钢带的轧制成形,电阻焊接和上胶(收缩)的电阻焊管成型工序中,对1-5%的压缩加工应变进行调整, 在管的圆周方向上施加,使得管的圆周方向的屈服比为85-95%。 钢带的组成为:0.02-0.25%C,≤0.5%Si,≤2.0%Mn,≤0.05%P,≤0.03%S,或进一步含有0.01-0.10%Al,余量Fe不可避免 杂质。 此外,除了组成以外,钢带可以含有选自≤0.10%Nb,≤0.10%Ti和≤0.10%V中的一种或两种以上,和/或选自≤0.5%中的一种或两种以上, Cu,≤0.5%Ni,≤0.5%Mo和≤0.5%Cr。 版权所有(C)2011,JPO&INPIT