热词
    • 6. 发明专利
    • Construction method for construction joint part of underground wall and underground wall
    • 地下墙和地下墙施工接头的施工方法
    • JP2009185471A
    • 2009-08-20
    • JP2008024363
    • 2008-02-04
    • Ohbayashi Corp株式会社大林組
    • INAZUMI AKIOSUZUKI TAKUMITONO MITSUOHIRAO JUNICHI
    • E02D5/20
    • PROBLEM TO BE SOLVED: To provide a construction method for easily arranging a water cut-off member in a construction joint part in an underground wall constituted by constructing and joining elements.
      SOLUTION: In this construction method, a preceding element 10 is first constructed, a part being a following element 20 is digged to form an excavated groove 25, a filter member 31 constituted by attaching the water cut-off member 30 onto a face on a preceding element 10 side to extend in the vertical direction, is arranged in an end part on a preceding element 10 side in the excavated groove 25, and concrete 22 is placed to constitute the following element 20 in the excavated groove 25.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种用于在通过构造和连接元件构成的地下壁中的构造接合部中容易地设置截水部件的构造方法。 解决方案:在该施工方法中,首先构造前一元件10,挖掘作为后续元件20的部分以形成挖掘槽25,通过将截水构件30附接到 在先前的元件10侧的垂直方向上延伸的表面布置在挖掘槽25中的先前元件10侧的端部中,并且将混凝土22放置在挖掘槽25中构成随后的元件20。 P>版权所有(C)2009,JPO&INPIT