会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • Screwed type pile
    • 螺丝类型
    • JP2009209674A
    • 2009-09-17
    • JP2009000523
    • 2009-01-06
    • Jfe Steel CorpJfeスチール株式会社
    • HAYASHI MASAHIROTATSUMI YUICHIICHIKAWA KAZUOMI
    • E02D5/56E02D5/28
    • PROBLEM TO BE SOLVED: To provide an economical screwed type pile constituted by attaching a blade to a distal end or its vicinity of a steel pipe and can penetrate into the ground by giving rotating force to the steel pipe to bury it in the ground and achieve excellent construction property.
      SOLUTION: This screwed type pile provided with substantially spiral blade 10 formed by two fan-shaped flat plates 11a, 11b having total of internal angles of 360° in the distal end of the steel pipe 2 is provided with a cutout section 21 formed by cutting out a spiral lower end part (a spiral start part) of the spiral blade 10 and an opening part 30 in the vicinity of the center of the spiral blade 10.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种经济的螺纹式桩,其通过将叶片附接到钢管的远端或其附近而构成,并且可以通过向钢管施加旋转力而将其埋入地下 实现了良好的施工性能。 解决方案:设置有在钢管2的前端总共具有360°的两个扇形平板11a,11b形成的基本螺旋形叶片10的该螺纹式堆头设置有切口部21 通过切割螺旋叶片10的螺旋下端部(螺旋起始部)和在螺旋叶片10的中心附近的开口部30而形成。版权所有(C)2009,JPO&INPIT
    • 7. 发明专利
    • Steel pipe pile and supporting structure and construction method using the same
    • 钢管和支撑结构和使用它的结构方法
    • JP2011226264A
    • 2011-11-10
    • JP2011140034
    • 2011-06-24
    • Jfe Steel CorpJfeスチール株式会社
    • WAKIYA HIROSHITATSUMI YUICHI
    • E02D5/56E02D5/28E02D7/22
    • PROBLEM TO BE SOLVED: To provide a steel pipe pile and its supporting structure capable of providing a high tip support force without using a very large blade, and a construction method of the steel pipe pile that facilitates construction of the supporting structure.SOLUTION: On a tip part outer periphery, an auger is inserted into a hollow section of a steel pipe pile which height t is 6 mm or higher and 10% or smaller than a diameter Dof the steel pipe pile 1, which ratio P/t with a pitch P is at 7.7-33 and which has a spiral shaped protrusion 11A of a hanging angle θ of 45 degrees or less, the steel pipe is rotatingly penetrated while excavating a ground 3 with the auger, when the auger head reaches to the section in which a support layer in the ground or a foot protection column 2 including the support layer is constructed, a digging diameter of the auger head is expanded to a corresponding diameter Dof the foot protection column, a solidification liquid is blown out from the auger head while excavating by a height of the foot protection column, the steel pipe pile is rotatingly penetrated into the foot protection column and after finishing the rotating penetrating, while leaving the tip end of the steel pipe pile to the foot protection column, the auger is drawn out, and the solidification liquid is solidified.
    • 要解决的问题:提供一种能够在不使用非常大的叶片的情况下提供高尖端支撑力的钢管桩及其支撑结构,以及有助于支撑结构的构造的钢管桩的施工方法。 解决方案:在顶端部外周上,将螺旋推入高度t为6mm以上且小于直径D 的钢管桩的中空部分 钢管桩1的1 / SB,间距P的比P / t为7.7-33,具有45度以下的悬挂角度θ的螺旋形突起部11A,钢管旋转 当螺旋钻头到达其中构成地面的支撑层或包括支撑层的脚部保护柱2的部分时,用螺旋钻挖掘地面3时被穿透,螺旋钻头的挖掘直径扩大到 脚部保护柱的相应直径D 2 ,在从脚部保护柱的高度挖掘的同时,从螺旋头吹出凝固液,钢管桩旋转穿过 进入脚部保护柱并完成旋转穿透后,同时留下尖端 钢管桩到脚部保护柱,螺旋钻被拔出,凝固液凝固。 版权所有(C)2012,JPO&INPIT
    • 9. 发明专利
    • Screw-in type pile
    • 螺旋型桩
    • JP2012237194A
    • 2012-12-06
    • JP2012201189
    • 2012-09-13
    • Jfe Steel CorpJfeスチール株式会社
    • HAYASHI MASAHIROTATSUMI YUICHIICHIKAWA KAZUOMI
    • E02D5/56E02D5/28
    • PROBLEM TO BE SOLVED: To provide a screw-in type pile which has a blade mounted at the front end of a steel pipe or its vicinity, which is passed through and embedded in a ground by giving rotating force to the steel pipe, and which is excellent in workability and economical.SOLUTION: In the screw-in type pile which has an approximately spiral blade 10 formed by two fan-shaped flat plates 11a, 11b having internal angles totaled 360° and mounted at the front end of a steel pipe 2, a cutout part 21 is provided which is formed by cutting out the spiral lower end (the spiral starting portion) of the spiral blade 10, and an opening part 30 is provided near the center of the spiral blade 10.
    • 要解决的问题:提供一种螺旋式桩,其具有安装在钢管或其附近的前端的叶片,其通过向钢管提供旋转力而穿过并嵌入地面 ,其加工性和经济性优异。 解决方案:在具有大致螺旋形叶片10的螺旋刀片10中,由两个内角为360°的扇形平板11a,11b形成,并安装在钢管2的前端, 提供通过切割螺旋叶片10的螺旋下端(螺旋起始部分)形成的部分21,并且在螺旋叶片10的中心附近设置开口部分30.(C) 2013年,JPO&INPIT
    • 10. 发明专利
    • Pile head connection structure and construction method thereof
    • 桩头连接结构及其构造方法
    • JP2011069165A
    • 2011-04-07
    • JP2009222943
    • 2009-09-28
    • Jfe Steel CorpJfeスチール株式会社
    • ONDA KUNIHIKOTATSUMI YUICHI
    • E02D27/12
    • PROBLEM TO BE SOLVED: To provide an easily constructible pile head connection structure having high strength, which corresponds to an increase in a pile-head reaction force involved in highly-strengthening of a pile, and to provide its construction method. SOLUTION: The pile-head connection structure for connecting a steel pipe pile 1 having a steel pipe on its pile head with a foundation beam 3 comprises: a plurality of anchorage reinforcements 7 arranged in the periphery of the steel pipe pile 1 in such a way that their upper parts extend upward from the pile head; and a reinforcement bar 9 spirally wound around the circumference of the anchorage reinforcements 7. Encasing concrete 11 is placed on the periphery of the pile head including the reinforcement bar 9. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种具有高强度的易于构造的桩头连接结构,其对应于桩的高强度加固所引起的桩头反作用力的增加,并提供其施工方法。 解决方案:用于将具有钢管的钢管桩1与基础梁3连接的桩头连接结构包括:多个锚固加强件7,其布置在钢管桩1的周边中 这样一种方式使得它们的上部从桩头向上延伸; 以及围绕锚固加固件7的圆周螺旋地缠绕的加强杆9.将混凝土11放置在包括加强杆9的桩头的周边。版权所有(C)2011,JPO&INPIT