会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明专利
    • Method of constructing underground structure
    • 构造地下结构的方法
    • JP2009174178A
    • 2009-08-06
    • JP2008013421
    • 2008-01-24
    • Kajima Corp鹿島建設株式会社
    • SASAKI YUTAKASASAKI YUKINOBUKAWABATA JUNICHIINAO MICHIHIROYOKOO ATSUSHIOKUYAMA MASAYOSHIMORIYAMA TAKAMIYANAGISAWA HIROSHIKANDA KENJI
    • E21D13/02E02D29/045E21D11/10E21D13/00
    • PROBLEM TO BE SOLVED: To provide a method of constructing an underground structure capable of constructing a large space under a ground without applying a load to the environment therearound.
      SOLUTION: After the state of a ground 1 at the positions of adits 11 to be excavated is confirmed by adit section spring search boring 7, the adits 11 are excavated from a tunnel 3 to a range involving the position 9 where the underground structure is to be constructed at predetermined intervals in the axial direction of the tunnel 3. Next, after the state of the ground 1 at the positions of a pilot tunnel 19 to be excavated is confirmed by pilot tunnel section spring search boring 17, the pilot tunnel 19 for joining the adjacent adits 11 to each other near the ends thereof is excavated. Then, after the state of the ground 1 at the positions of deep foundation piles 25 to be constructed is confirmed by deep foundation section spring search boring 25, deep foundation piles 27 are constructed vertically at predetermined intervals in the axial direction of the pilot tunnel 19. The area between the tunnel 3 and the pilot tunnel 19 is excavated and a pile cap concrete 33 is placed, and the areas between the tunnel 3 and the deep foundation piles 27 are excavated and the base concrete 37 and a sidewall concrete 41 are placed.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种构造地下结构的方法,该地下结构能够在没有对其周围的环境施加负载的情况下在地面下构造大的空间。

      解决方案:在通过辅助部分弹簧搜索镗孔7确认在待挖掘的钻头11的位置处的地面1的状态之后,将钻头11从隧道3挖掘到涉及位置9的范围,其中地下 在隧道3的轴向方向上以预定的间隔构造结构。接下来,在通过导频隧道截面弹簧搜索钻孔17确认在待挖掘的先导隧道19的位置处的地面1的状态之后, 挖掘出用于将相邻的钻头11彼此靠近的端部连接的隧道19。 然后,在深基础截面弹簧搜索镗孔25确认在构造的深基础桩25的位置处的地面状态1之后,在导向通路19的轴向上以预定间隔垂直地构造深基础桩27 挖掘隧道3与先导隧道19之间的区域,放置堆垛混凝土33,挖掘隧道3和深基础桩27之间的区域,并将基础混凝土37和侧壁混凝土41放置 。 版权所有(C)2009,JPO&INPIT

    • 7. 发明专利
    • Shield tunnel joining method
    • SHIELD隧道加工方法
    • JP2005273212A
    • 2005-10-06
    • JP2004085329
    • 2004-03-23
    • Kajima CorpKomatsu Ltd株式会社小松製作所鹿島建設株式会社
    • SASAKI YUKINOBUKIDA HIROMITSUEMORI MICHIOSHINTAKU AKIJI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a shield tunnel joining method superior in water cut-off performance, by putting the stability of the natural ground in a high state by a shield excavator having a simple constitution, when joining two shield tunnels.
      SOLUTION: A first tunnel is excavated up to a first tunnel excavating position by a first shield machine 1, and a second tunnel is excavated up to a second tunnel excavating position by a second shield machine 2. At this time, a shield machine arriving first of all is set as the first shield machine 1. Then, a first cutter device 11 of the first shield machine 1 is retreated up to the inside of a first outer cylinder part 10. Then, the second shield machine 2 is advanced, to excavate sediment between the first tunnel and the second tunnel. Afterwards, a second cutter device 21 is diametrally contracted, and the second shield machine 2 is further advanced. Then, after the first outer cylinder part 10 is opposed to a second outer cylinder 20, a second cutter device 21A and a movable inner cylinder 21E are advanced inside the first outer cylinder part 10.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种在截水性能优异的屏蔽隧道接合方法中,通过具有简单结构的盾构式挖掘机将天然地面的稳定性提高到高状态时,当连接两个盾构通道时。 解决方案:通过第一屏蔽机1将第一隧道挖掘到第一隧道挖掘位置,并且通过第二屏蔽机2将第二隧道挖掘到第二隧道挖掘位置。此时,屏蔽 首先到达的机器被设置为第一屏蔽机1.然后,第一屏蔽机1的第一切割装置11退回到第一外筒部10的内部。然后,第二屏蔽机2前进 挖掘第一隧道与第二隧道之间的沉积物。 之后,第二切割装置21径向收缩,第二屏蔽机2进一步前进。 然后,在第一外筒部10与第二外筒20相对后,第二切割装置21A和可动内筒21E在第一外筒部10的内部前进。版权所有(C)2006,JPO&NCIPI