会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • SURVEYING DEVICE FOR TUNNEL
    • JPH01221613A
    • 1989-09-05
    • JP4849288
    • 1988-03-01
    • NISHIMATSU CONSTR CO LTD
    • WATANABE TORUMASUDA SHUICHIKATANO HIKOICHIKONISHI TAMOTSUKONDOU SOUKAABE TSUTOMU
    • G01C7/06G01C15/00
    • PURPOSE:To survey the position of a digging tip part and a current digging direction by operating a driving source with a voltage difference generated owing to a difference in the photodetection area of projected laser light and using such a displacement gage that the laser light travels in the center of a passage hole at all times. CONSTITUTION:A target automatic tracking laser type transit is provided in a pit at a position whose coordinates are already known. Then when the laser light 12 is passed through the passage hole 14, upper and lower, and right and left facing photoelectric converting bodies 13 generate the output voltage difference according to an irregularity, etc., and a corresponding driving source 16 is operated to move a board 11; and a laser light incidence angle measuring instrument 10 which is so constituted that the laser light 12 travels in the center of the passage hole 14 surveys the positions and directions of a laser light reflection body and a tunnel drilling machine to which this device 10 is fitted. Respective measured values are sent to a control circuit through a signal line and processed to display the result on a display part or control the operation of a tunnel drilling part.
    • 5. 发明专利
    • SLUDGE DELIVERY PIPE AUTOMATIC JOINING DEVICE OF MUD SHIELD ENGINEERING
    • JPH07259479A
    • 1995-10-09
    • JP7809694
    • 1994-03-24
    • NISHIMATSU CONSTR CO LTDTOMOE DENKI KOGYO KK
    • ABE TSUTOMUADACHI TSUGUOKATANO HIKOICHIOGURI TOSHIOTAGUCHI TAKESHINOZAWA HIROBUMISERIZAWA SHUNJIIWATA MASARU
    • E21D9/13E21D9/06E21F17/00F16L1/00F16L1/024
    • PURPOSE:To automatically carry out extension joining work by providing a receiving roller group on a car body, a crane on a ceiling portion of the car body, a front side sludge delivery pipe sliding device and a front side coupler connection and disconnection device on the front side of the car body and a rear side coupler connection device and a rear end support roller on the rear side of the car body. CONSTITUTION:A front side coupler FJ is removed by a front side coupler connection and disconnection device 40 by way of suspending gigging in case of extending a newly set pipe NP. A missing part of a sludge delivery pipe P is formed between a divided front side sludge delivery pipe part FP and a divided rear side sludge delivery pipe part BP by advancing the divided front side sludge delivery pipe part FP from the front side coupler FJ of a sludge delivery pipe P while contracting an expansion pipe and drawing out the divided rear side sludge delivery pipe part BP to the rear side apparently. Thereafter, the newly set pipe is taken in by a carry-in carriage by a crane 10 provided on a ceiling portion of a car body 1, and the newly set pipe NP is placed on a group of receiving rollers 2, 2, 2... existing on the missing part the sludge delivery pipe P. Thereafter, a new rear side coupler BJ is positioned in a clearance between the newly set pipe NP and the divided rear side sludge delivery pipe part BP by a rear side coupler connection device 50. Newly set pipe joining and extension are carried out by joining the newly set pipe NP by retreating the divided front side sludge delivery pipe part FP and fastening the front side coupler FJ and the rear side coupler BJ.