会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Service module generation program, device, and service information management method
    • 服务模块生成程序,设备和服务信息管理方法
    • JP2013073400A
    • 2013-04-22
    • JP2011211604
    • 2011-09-27
    • Fujitsu Ltd富士通株式会社
    • TAKAHASHI MASAKI
    • G06F9/44G06F11/00
    • PROBLEM TO BE SOLVED: To provide a technique for managing an interface according to a change in a service module.SOLUTION: On the basis of a first source code stored in a storage unit and a second source code of which version is earlier than the version of first source code, a computer is configured to execute processing of: generating difference information indicating difference between a definition of input/output parameters to be used for an interface function included in the first source code and a definition of input/output parameters to be used for an interface function included in the second source code; and transmitting the generated difference information to an external device.
    • 要解决的问题:提供一种根据服务模块的改变来管理接口的技术。 解决方案:基于存储在存储单元中的第一源代码和其版本早于第一源代码的版本的第二源代码,计算机被配置为执行以下处理:生成指示差异的差异信息 在用于包括在第一源代码中的接口功能的输入/输出参数的定义和要用于包括在第二源代码中的接口功能的输入/输出参数的定义之间; 以及将生成的差异信息发送到外部设备。 版权所有(C)2013,JPO&INPIT
    • 2. 发明专利
    • 空気調和装置
    • 冷气机
    • JP2015048986A
    • 2015-03-16
    • JP2013181128
    • 2013-09-02
    • 富士通株式会社Fujitsu Ltd富士電機株式会社Fuji Electric Co Ltd
    • YOSHIDA HIROAKIASO NORIYASUKONDO MASAOTAKAHASHI MASAKIOGA SHUNSUKE
    • F25B25/02F25B1/00
    • 【課題】空気調和装置において、冷却効率を高める。【解決手段】空気調和装置は、第1の冷媒が循環する冷凍サイクル(20)と、吸着工程と脱着工程とを交互に繰り返すユニットを少なくとも一対有する吸着式冷凍機(30)と、冷凍サイクル(20)において圧縮機12よりも第1の冷媒の上流側に設けられ、第2の冷媒と第1の冷媒との熱交換を行う第1の熱交換器(86)と、間接外気冷却部(20)と、第2の冷媒を第1の熱交換器(86)と吸着工程となっているユニットとに循環させる第2の流路(84,54または56)と、第2の冷媒を第2の熱交換器(5)と吸着工程となっているユニットとに循環させる第3の流路(305,306)と、第2の冷媒を第2の流路に循環させる第1のモードと第3の冷媒の循環を停止し第2の冷媒を第3の流路に循環させる第2のモードとを含む複数のモードのうちのいずれかのモードに切替制御する制御部と、を備える。【選択図】図1
    • 要解决的问题:提高空调的冷却效率。空调包括:第一制冷剂循环的制冷循环(10); 吸附式制冷机(30),其具有交替地重复吸附步骤和解吸步骤的至少一对单元; 与所述制冷循环(10)中的压缩机12相比,设置在所述第一制冷剂的上游侧的第一热交换器(86),其进行第二制冷剂与所述第一制冷剂的热交换; 间接外部空气冷却部件(20); 第二流路(84,54或56),其允许第二制冷剂在第一热交换器(86)和处于吸附步骤的单元中循环; 允许第二制冷剂在第二热交换器(5)中循环的第三流动通道(305,306)和处于吸附步骤的单元; 以及控制单元,用于进行切换为包括第二制冷剂在第二流路中循环的第一模式和第三制冷剂的循环停止的第二模式的多个模式中的一个, 允许第二制冷剂在第三流动通道中循环。
    • 3. 发明专利
    • Client device and method of controlling the same
    • 客户端设备及其控制方法
    • JP2010257305A
    • 2010-11-11
    • JP2009107779
    • 2009-04-27
    • Fujitsu Ltd富士通株式会社
    • MOMIJITANI KOJIKODAIRA SOJIIWATANI TOMOKOIWAMURA HIDEKIISHIKAWA KAZUNARIYAMAKAWA DAISUKEOGATA TSUKASAOTA SUNAOTAKAHASHI KAZUOTAKAHASHI MASAKISETA YASUHIRONAKAJIMA NORIOMI
    • G06F13/00H04N7/173H04N21/438H04N21/4788
    • PROBLEM TO BE SOLVED: To continue the reception of data even when data can not be transferred in a communication network in which data are transferred between a plurality of client devices.
      SOLUTION: The client device for receiving data transferred from one client device is provided with: a connection candidate storage means for storing information related with a plurality of client devices as candidates for transferring data to the client device; an event occurrent detection means for detecting the occurrence of a prescribed event related with one client device; an access point selection means for, when the occurrence of the prescribed event is detected by the event occurrence detection means, selecting one candidate of the information stored by the connection candidate storage means; and a data transfer requesting means for requesting the candidate selected by the access point selection means to transfer the data to the client device.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:即使在数据在多个客户端设备之间传送数据的通信网络中的数据不能传送的情况下,也可继续接收数据。 解决方案:用于接收从一个客户端设备传送的数据的客户端设备具有:连接候选存储装置,用于存储与多个客户端设备相关的信息,作为将数据传送到客户端设备的候选者; 事件发生检测装置,用于检测与一个客户端装置相关的规定事件的发生; 接入点选择装置,用于当由事件发生检测装置检测到规定事件的发生时,选择由连接候选存储装置存储的信息的一个候选者; 以及数据传送请求装置,用于请求由接入点选择装置选择的候选者将数据传送到客户端设备。 版权所有(C)2011,JPO&INPIT
    • 8. 发明专利
    • PROM
    • JPH01157568A
    • 1989-06-20
    • JP31585387
    • 1987-12-14
    • FUJITSU LTD
    • TAKAHASHI MASAKI
    • H01L27/102H01L21/8229H01L27/10
    • PURPOSE:To cut the access time by forming two pn-junctions with a primary region of one conductive type semiconductor, a secondary region of opposite conductive type semiconductor and a third region of one conductive type semiconductor in lamination structure and by joining the third region with the opposite conductive type substrate which extends through a buried layer. CONSTITUTION:A buried layer 6a allows a substrate 5 to pass through and extend immediately below the center of a region 3. The extending section 5a connects with the lower central section of the region 3. The peripheral section of the lower side of the region 3 connects with the buried layer 6a thus leading out the region 3 to an electrode 7b. When PROM device in this constitution is used as PROM memory cell S11-Snn, a minority carrier, if storaged in the region 3, is led in the substrate 5 which becomes a majority carrier through the connection with the extending section 5a of the substrate 5, thus reducing the time required for dissipation. In this way, it is possible to shorten the access time.
    • 9. 发明专利
    • READ-ONLY MEMORY CIRCUIT
    • JPS63313396A
    • 1988-12-21
    • JP15074387
    • 1987-06-17
    • FUJITSU LTD
    • TAKAHASHI MASAKI
    • G11C17/14G11C17/00
    • PURPOSE:To eliminate a transitional conductive cell caused by the generation of an address skew and to attain a high speed reading having no delay by discharging a precharged bit line by a discharge circuit after a prescribed time. CONSTITUTION:At the time of selecting the cell S11 of a memory cell array 12, since only a bit line 181 is precharged by a multiplex circuit 15, the bit line 181 goes to a high level and the cell S11 is unwritten, a discharge by a NAND circuit DD1 is not executed. After the data of the cell S11 is read, for instance, at the time of shifting to the selection of a next cell S12, the stored charge of the bit line 181 is discharged by a discharge circuit 30 and the potential of the bit line 181 returns to an original one. Similarly, when unwritten cells S12-S1n are sequentially selected, a similarly operation is generated, the bit line of the selected cell is discharged after the prescribed time and reading speed is improved.