    • Construction method of shaft
    • 轴的构造方法
    • JP2005133339A
    • 2005-05-26
    • JP2003367762
    • 2003-10-28
    • Kajima CorpKomatsu Im Engineering Kkコマツアイエムエンジニアリング株式会社鹿島建設株式会社
    • MIMURO KEIJISASAKI YUKINOBUOWAKI MASASHIISHII YOSHIHARUKUSHIDA SHINJISHIMIZU NOBUAKI
    • E21D3/00E21D5/08E21D9/04
    • PROBLEM TO BE SOLVED: To provide a shaft construction method and a shaft economically constructible neither occupying a ground part all the time nor affecting environment around.
      SOLUTION: A plurality of steel pipes 17 are jacked toward the ground from start ports provided at segments 23 of a tunnel 3, and a pipe roof 25 is formed in cylindrical shape. Freezing work 29 is then performed to cut off water in spaces of the pipe roof 25, and an excavated sediment throw-in hole 31 is formed in the ground 1 inside the pipe roof 25. While recovering the excavated sediment in the tunnel 3 through the excavated sediment throw-in hole 31, the inside of the pipe roof 25 is excavated, and a cut-off iron plate 33 or the like is installed along the inner periphery of the pipe roof 25. Further, the segments 23 of the tunnel 3 located inside the pipe roof 25 are removed leaving a segment main girder 39, and secondary lining 37 is installed inside the cut-off iron plate 33 to complete the shaft 41.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供轴施工方法和经济可施工的轴既不占用地面部分也不影响周围的环境。 解决方案:多个钢管17从设置在隧道3的段23处的起始端口朝向地面顶起,并且管屋顶25形成为圆柱形。 然后执行冷冻工作29以在管道屋顶25的空间中切断水,并且在管道顶部25内的地面1中形成挖掘的沉积物入口31。在通过隧道3中挖掘的沉积物通过 挖出的沉积物投入孔31,挖掘出管顶25的内侧,沿着管顶25的内周设置有切断铁板33等。此外,隧道3的段23 排除在管顶25内部,留下段主梁39,第二衬里37安装在切割铁板33内,以完成轴41.版权所有(C)2005,JPO&NCIPI
    • 7. 发明专利
    • PERMEABLE-PIPE LAYING CONSTRUCTION METHOD BY PIPE JACKING METHOD AND ITS CUTOFF DEVICE
    • JP2002004769A
    • 2002-01-09
    • JP2000187244
    • 2000-06-22
    • KOMATSU MFG CO LTDKOMATSU IM ENGINEERING KK
    • AKIYAMA HIROSHITAKEUCHI YASUO
    • E21D9/06F16L1/024
    • PROBLEM TO BE SOLVED: To provide a permeable-pipe laying construction method and a cutoff device used for the construction method, by which cutoff into a permeable pipe can be conducted surely during the execution of works and sure permeable performance can be obtained after the execution of works. SOLUTION: The laying construction method of the permeable pipe has the first process, in which a steel pipe in fixed length and the permeable pipe internally inserted into the steel pipe are connected successively by a pipe jacking machine and buried from a starting shaft to an arrival shaft, the second process, in which opening sections at the front ends of the steel pipe and the permeable pipe reaching the arrival shaft are cut off, and the third process, in which water is cut off between a pit wall and the steel pipe, between the steel pipe and the permeable pipe and in the permeable pipe on the starting shaft side and the steel pipe is pulled out and removed to the starting shaft side or the arrival shaft side. The laying construction method of the permeable pipe has a cylindrical body fixed at the end section of the permeable pipe, an outside cutoff means being installed onto the outer circumferential surface of the cylindrical body and cutting off a section between the steel pipe and the cylindrical body and an inside cutoff means being freely mounted and demounted to and from the inside of the cylindrical body and cutting off the inside of the cylindrical body.
    • 8. 发明专利
    • Structure of tunnel, and construction method for tunnel
    • 隧道结构及隧道施工方法
    • JP2005036435A
    • 2005-02-10
    • JP2003198218
    • 2003-07-17
    • Kajima CorpKomatsu Im Engineering KkKomatsu LtdTekken Constr Co Ltdコマツアイエムエンジニアリング株式会社株式会社小松製作所鉄建建設株式会社鹿島建設株式会社
    • NAGAOKA TAKASHIKASUYA TAROSAITO MASAHARUTAKAMURA KEIICHIHAYAKAWA YASUYUKIYOSHIKAWA TADASHIKATO MAKOTOKODAIRA SADATADAYAMAMOTO YOSHIHISATAKEUCHI TAKU
    • E21D9/04E21D13/02
    • PROBLEM TO BE SOLVED: To provide a structure of a tunnel, and a construction method for the tunnel, which are suitable, for example, for construction of a ramp section of a road tunnel with a large cross section at a great depth, which dispense with soil improvement and various reinforcing construction methods to the utmost, which enable safe, rational and efficient construction, which enable a reduction in construction period and construction cost, which can be applied to either of a shield tunnel and a mountain tunnel, and which enable a road etc. to be rationally joined into one, branched or made wider. SOLUTION: A plurality of bent pipe-shaped buried pipes 17-19 are arranged in such a manner as to cross the longitudinal direction of the tunnel 1. Lining walls 23-25 are formed along the buried pipes 17-19. Both ends of the buried pipes 17-19 and both ends of the lining walls 23-25 are supported by both side sections of the tunnel 1. The tunnel 1 is provided in such a manner as to be capable of communicating with a main line tunnel 3 whereon a main line structure 6 is laid, and a branch line tunnel 4 whereon a branch line structure 8 is laid. The structure 6 and a separation/joining area 35, which can be separated from the structure 6 into the structure 8 or which can be joined to the structure 6 from the structure 8, are provided in the tunnel 1. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供隧道的结构和隧道的施工方法,其适合于例如在大深度处构造具有大横截面的道路隧道的坡道部分 最大限度地省去了土壤改良和各种加固施工方式,使施工安全,合理,高效,可以减少施工期和施工成本,适用于盾构隧道和山隧道, 使道路等合理加入到一个,分支或更广泛。 解决方案:多个弯管管状埋管17-19以与隧道1的纵向相交的方式布置。衬里壁23-25沿着埋管17-19形成。 埋管17-19的两端和衬壁23-25的两端由隧道1的两侧部分支撑。隧道1设置成能够与主线隧道 在图3中,布置了主线结构6,并且布置了分支线结构8的分支线隧道4。 隧道1中设置有结构6和分离/接合区域35,其可以从结构6分离成结构8或者可以从结构8与结构6相连接。版权所有: C)2005,JPO&NCIPI