会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明申请
    • COMPOSITE INFLOW CONTROL DEVICE
    • 复合流入控制装置
    • WO2013028456A3
    • 2013-05-02
    • PCT/US2012051141
    • 2012-08-16
    • BAKER HUGHES INCAGRAWAL GAURAVSADANA ANIL KGARCIA LUIS A
    • AGRAWAL GAURAVSADANA ANIL KGARCIA LUIS A
    • E21B43/12E21B34/06
    • F16L55/02736E21B43/12E21B43/32F16L55/02745Y10T137/0318
    • A flow control device, including a flow path for a fluid therethrough; a geometry defining at least a portion of the flow path, the geometry operatively arranged to cause a pressure drop in the fluid thereacross; a material disposed along the flow path, the material having a surface energy less than that of an undesirable component of the fluid. A method of controlling inflow of an undesirable fluid including: receiving a fluid in a flow control device; and reducing an undesirable component of the fluid flowing out from the flow control device by directing the fluid along a flow path of the flow control device, the flow path at least partially defined by a geometry operatively arranged to cause a pressure drop in the fluid thereacross and at least partially defined by a material having a surface energy less than that of the undesirable component of the fluid.
    • 一种流量控制装置,其包括用于流体的流动路径; 限定所述流动路径的至少一部分的几何形状,所述几何形状可操作地布置成在所述流体的横向上引起压降; 沿着所述流动路径设置的材料,所述材料的表面能小于所述流体的不期望组分的表面能。 一种控制不希望的流体流入的方法,包括:在流量控制装置中接收流体; 以及通过引导流体沿流量控制装置的流动路径流动而减少从流量控制装置流出的不期望的流体成分,流动路径至少部分地由几何形状限定,所述几何形状可操作地布置成引起流体流过其中的流体压降 并且至少部分地由具有小于流体的不期望组分的表面能的材料限定。
    • 6. 发明申请
    • COMPOSITE INFLOW CONTROL DEVICE
    • 复合流体控制装置
    • WO2013028456A2
    • 2013-02-28
    • PCT/US2012/051141
    • 2012-08-16
    • BAKER HUGHES INCORPORATEDAGRAWAL, GauravSADANA, Anil K.GARCIA, Luis A.
    • AGRAWAL, GauravSADANA, Anil K.GARCIA, Luis A.
    • E21B43/12E21B34/06
    • F16L55/02736E21B43/12E21B43/32F16L55/02745Y10T137/0318
    • A flow control device, including a flow path for a fluid therethrough; a geometry defining at least a portion of the flow path, the geometry operatively arranged to cause a pressure drop in the fluid thereacross; a material disposed along the flow path, the material having a surface energy less than that of an undesirable component of the fluid. A method of controlling inflow of an undesirable fluid including: receiving a fluid in a flow control device; and reducing an undesirable component of the fluid flowing out from the flow control device by directing the fluid along a flow path of the flow control device, the flow path at least partially defined by a geometry operatively arranged to cause a pressure drop in the fluid thereacross and at least partially defined by a material having a surface energy less than that of the undesirable component of the fluid.
    • 一种流量控制装置,包括用于流体的流路; 限定流路的至少一部分的几何形状,所述几何形状可操作地布置成导致其中的流体的压降; 沿着流动路径设置的材料,该材料的表面能小于流体的不期望的部件的表面能。 一种控制不期望流体的流入的方法,包括:在流量控制装置中接收流体; 并且通过沿着所述流量控制装置的流动路径引导所述流体来减少从所述流量控制装置流出的流体的不期望的部件,所述流动路径至少部分地由可操作地布置成导致流体中的压降的几何形状限定 并且至少部分地由表面能小于流体不期望的组分的表面能的材料限定。
    • 7. 发明申请
    • A METHOD OF PROVIDING FLOW CONTROL DEVICES FOR A PRODUCTION WELLBORE
    • 为生产井提供流量控制装置的方法
    • WO2012148688A2
    • 2012-11-01
    • PCT/US2012/033248
    • 2012-04-12
    • BAKER HUGHES INCORPORATEDGARCIA, Gonzalo A.GARCIA, Luis A.RUSSELL, Ronnie D.
    • GARCIA, Gonzalo A.GARCIA, Luis A.RUSSELL, Ronnie D.
    • E21B49/08E21B47/008E21B47/007
    • E21B43/00E21B43/12
    • A method of providing a production string for a wellbore formed in a formation is disclosed. The method, in one embodiment may include: defining a performance criterion for flow of a fluid from a formation into a wellbore; performing a simulation using a processor, a simulation program, a parameter of the fluid, a parameter of the formation and a parameter of the wellbore to determine a first flow characteristic of the flow of the fluid from the formation into the wellbore corresponding to an initial set of flow control devices arranged in the wellbore; performing one or more additional simulations using the processor, the simulation program and the parameters of formation, fluid and wellbore to determine a new flow characteristic of the flow of the fluid from the formation into the wellbore for a new set of flow control devices until a new determined characteristic of the flow of the fluid from the formation into the wellbore meets the performance criterion; and storing results of simulation results relating to the flow control devices in a suitable storage medium.
    • 公开了一种为形成在地层中的井筒提供生产线的方法。 在一个实施例中,该方法可以包括:定义流体从地层到井眼的流动的性能标准; 使用处理器,模拟程序,流体的参数,地层的参数和井筒的参数来执行模拟,以确定流体从地层流入井眼的流体的第一流动特性,其对应于初始 设置在井眼中的一组流量控制装置; 使用处理器,模拟程序和形成参数,流体和井眼来执行一个或多个附加模拟,以确定流体从地层流入井筒的新流量特性,用于新的流量控制装置,直到 流体从地层流入井筒的新的确定特征符合性能标准; 并将与流量控制装置相关的模拟结果的结果存储在合适的存储介质中。
    • 9. 发明申请
    • A METHOD OF PROVIDING FLOW CONTROL DEVICES FOR A PRODUCTION WELLBORE
    • 为生产井提供流量控制装置的方法
    • WO2012148688A3
    • 2013-01-10
    • PCT/US2012033248
    • 2012-04-12
    • BAKER HUGHES INCGARCIA GONZALO AGARCIA LUIS ARUSSELL RONNIE D
    • GARCIA GONZALO AGARCIA LUIS ARUSSELL RONNIE D
    • E21B49/08E21B47/007E21B47/008
    • E21B43/00E21B43/12
    • A method of providing a production string for a wellbore formed in a formation is disclosed. The method, in one embodiment may include: defining a performance criterion for flow of a fluid from a formation into a wellbore; performing a simulation using a processor, a simulation program, a parameter of the fluid, a parameter of the formation and a parameter of the wellbore to determine a first flow characteristic of the flow of the fluid from the formation into the wellbore corresponding to an initial set of flow control devices arranged in the wellbore; performing one or more additional simulations using the processor, the simulation program and the parameters of formation, fluid and wellbore to determine a new flow characteristic of the flow of the fluid from the formation into the wellbore for a new set of flow control devices until a new determined characteristic of the flow of the fluid from the formation into the wellbore meets the performance criterion; and storing results of simulation results relating to the flow control devices in a suitable storage medium.
    • 公开了一种为形成在地层中的井筒提供生产线的方法。 在一个实施例中,该方法可以包括:定义流体从地层到井眼的流动的性能标准; 使用处理器,模拟程序,流体的参数,地层的参数和井筒的参数来执行模拟,以确定流体从地层流入井眼的流动的第一流动特性,对应于初始 设置在井眼中的一组流量控制装置; 使用处理器,模拟程序和形成参数,流体和井眼来执行一个或多个附加模拟,以确定流体从地层流入井筒的新流量特性,用于新的流量控制装置,直到 流体从地层流入井筒的新的确定特征符合性能标准; 并将与流量控制装置相关的模拟结果的结果存储在合适的存储介质中。