热词
    • 23. 发明申请
    • METHOD OF CONTROLLING OPERATION OF AN ENGINE OF A GENERATOR SET, AND A CONTROL UNIT FOR AN ENGINE OF A GENERATOR SET
    • 控制发电机组的发动机的操作的方法以及用于发电机组的发动机的控制单元
    • WO2017064358A1
    • 2017-04-20
    • PCT/FI2015/050698
    • 2015-10-15
    • WÄRTSILÄ FINLAND OY
    • SAIKKONEN, AriKAAS, TomKARJALAINEN, Jenni
    • H02P9/00
    • H02P9/00
    • Invention relates to method of controlling operation of an engine of a generator set in an assembly of at least two generator sets coupled parallel to an electric grid, wherein method, - actual engine speed is determined or measured, and fuel feeding into the engine is controlled making use of the actual engine speed and a speed reference value, wherein - actual engine load is determined or measured, - a load reference value is determined based on the actual engine loads of the engines coupled to the electric grid, and - the speed reference value is determined such that the speed reference value is a sum of: - a first part of the speed reference value obtained by making use of the actual engine load and the load reference value, and - a second part of the speed reference value obtained by - identifying transient state from the load reference value and - combining the transient state with engine characteristics to provide the second part of the speed reference value.
    • 本发明涉及一种控制发电机组的发动机的操作的方法,所述发电机组的发动机在并联连接到电网的至少两个发电机组的组件中,其中方法 - 实际的发动机转速被确定或测量, 并且利用实际的发动机速度和速度参考值来控制向发动机的燃料供给,其中 - 实际的发动机负载被确定或测量, - 负载参考值基于联接到发动机的发动机的实际发动机负载来确定 并且 - 速度参考值被确定为使得速度参考值是以下各项的总和: - 通过利用实际发动机负载和负载参考值获得的速度参考值的第一部分,以及 - 第二部分 通过以下方式获得的速度参考值的一部分: - 从负载参考值识别过渡状态,以及 - 将过渡状态与发动机特性组合以提供速度参考值的第二部分。
    • 24. 发明申请
    • AN ELECTRICAL POWER SYSTEM AND A METHOD FOR CONTROLLING GENERATOR VOLTAGE
    • 一种电力系统和一种控制发电机电压的方法
    • WO2016034777A2
    • 2016-03-10
    • PCT/FI2015/050598
    • 2015-09-11
    • WÄRTSILÄ FINLAND OY
    • KAAS, TomSAIKKONEN, Ari
    • H02P9/30H02P9/10
    • H02P9/302G01R23/02H02P9/10
    • An electrical power system comprises at least one synchronous generator (101), a signal transducer (102) for producing an amplitude signal indicative of the amplitude of generator voltage, and a controller (103). The signal transducer and the controller are parts of a voltage control loop for controlling the excitation of the synchronous generator on the basis of the amplitude signal and the reference amplitude. The voltage control loop comprises a band-rejection filter (104) or another signal conditioning device for suppressing frequency components corresponding to torsional mode oscillations of a rotating system that comprises the rotor of the synchronous generator and a rotating part of an engine or another prime mover. Thus, an adverse phenomenon where the voltage control loop maintains or even amplifies the torsional mode oscillations can be avoided.
    • 电力系统包括至少一个同步发电机(101),用于产生指示发电机电压幅度的幅度信号的信号换能器(102),以及控制器(103)。 信号传感器和控制器是电压控制回路的一部分,用于根据幅度信号和参考幅度控制同步发电机的励磁。 电压控制回路包括带阻滤波器(104)或另一信号调节装置,用于抑制对应于包括同步发电机的转子和发动机或另一原动机的旋转部分的旋转系统的扭转模式振荡的频率分量 。 因此,可以避免电压控制回路维持或甚至放大扭转模式振荡的不利现象。
    • 27. 发明申请
    • A LOAD SHARING ARRANGEMENT
    • 负载共享安排
    • WO2013053987A1
    • 2013-04-18
    • PCT/FI2012/050943
    • 2012-10-03
    • WÄRTSILÄ FINLAND OY
    • KAAS, TomSAIKKONEN, Ari
    • H02J3/46H02J3/38H02J13/00
    • H02J3/46H02J3/38H02J13/0055H02J13/0062Y02E40/72Y02E60/7838Y04S10/12Y04S40/124Y10T307/696
    • The aim of the invention is to use a separate device (11) between the analog (8) and digital (6) communications lines to convert the digital load sharing information from the digital communication line (6) to the analog communication line (8) and vice versa. The device (11) does not generate power itself for the load sharing and therefore does not disturb the load sharing of the generators (5,7) on the both sides of the device (11). The device (11) can be seen as a gate between the digital communication line (6)and the analog communication line (8). The device(ll) simulates load situation of the generator/s (5) connected to the digital communication line (6) for load sharing with other generator/s (7) connected to the analog communication line (8), and similarly it simulates load situation of the other generator/s (7) connected to the analog communication line (8) for load sharing with the generator/s (5) connected to the digital communication line (6).
    • 本发明的目的是在模拟(8)和数字(6)通信线路之间使用单独的设备(11)来将数字负载共享信息从数字通信线路(6)转换成模拟通信线路(8) 反之亦然。 设备(11)不会为负载共享而产生电力本身,因此不会干扰设备(11)两侧的发电机(5,7)的负载共享。 设备(11)可以被看作是数字通信线路(6)和模拟通信线路(8)之间的门极。 设备(11)模拟连接到数字通信线路(6)的发电机(5)的负载情况,用于与连接到模拟通信线路(8)的其他发电机(7)进行负载共享,并且类似地,它模拟 连接到模拟通信线路(8)的另一个发生器(7)的负载情况用于与连接到数字通信线路(6)的发电机(5)的负载共享。