会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 10. 发明申请
    • MULTI-LINK CONSTRUCTION ELEMENT AND METHOD FOR ASSEMBLING SAME
    • 多连杆构造元件和组装方法
    • US20170009454A1
    • 2017-01-12
    • US15113348
    • 2014-05-15
    • Evgeny Vyacheslavovich KomrakovLarisa Arkadievna MolokhinaAlexandr Grigorievich Bekrenev
    • Larisa Arkadievna MolokhinaIlya Valerievich MolokhinOlga Mikhailovna KozlovaVera Alexandrovna BekrenevaRoman Alexandrovich Bekrenev
    • E04C5/01E04C5/07H05B3/28H02J50/10B60L11/18E01C5/08E01C9/06
    • E04C5/01B60L11/182E01C5/08E01C9/06E01C2201/16E04C1/00E04C2/00E04C3/20E04C3/29E04C5/06E04C5/07E04C5/08E04C5/085E04C2003/0486E04G21/12H02J50/10H05B3/283
    • The present set of inventions relates to the field of building and in particular to building constructions and to processes for manufacturing building constructions comprising tensioned and non-tensioned tendons and can be used to construct residential, public and office buildings and constructions as well as for reconditioning or restoring the same.The technical result consists of the provision of relatively long-extended constructions or complicated shape constructions working as a single pre-tensioned construction and characterized by high carrying capacity, stability and rigidity.Said technical result is obtained by the fact that in a multi-component building member comprising at least two components and pre-tensioned tendons, each component is made as a tendons module comprising an initial and a final supporting elements with holes for the pre-tensioned tendons and with a stand for placing anchors and tensioning arrangements; and a reinforcing cage located between said supporting elements and comprising an upper and a lower elements in the form of a grid with a cellular structure, the cells having the shape of an equilateral polyhedron, and at least one median element under the form of a space reinforcement structure comprising inclined reinforcement bars forming equilateral polyhedral pyramids oppositely oriented in space, the pre-tensioned tendons of the first component being anchored at the initial and final supporting elements of the same, the pre-tensioned tendons of each following component being anchored at the final elements of the previous and the current components.Said technical result is obtained as well by the fact that in a process for assembling the multi-component building member, the median, the upper and the lower components of the tendons module are preassembled, attached between the initial and the final supporting elements, the tendons are inserted and then pre-tensioned, wherein, starting with the second tendons module of the construction, the anchor of the pre-tensioned tendons is mounted on the final supporting element of the previous tendons module, whereas a tensioning arrangement is mounted on the final supporting element of the pre-tensioned tendons module.
    • 也可以通过以下事实获得所述技术结果:在组装多组分建筑构件的过程中,将钢筋组件的中间件,上部和下部组件预先组装,附接在初始和最终支撑元件之间, 腱被插入然后预张紧,其中从该结构的第二腱模块开始,预张紧腱的锚固件安装在先前的腱模块的最终支撑元件上,而张紧装置安装在 预拉伸钢筋模块的最终支撑元件。