    • METHOD OF DRILLING FROM A SHAFT FOR UNDERGROUND RECOVERY OF HYDROCARBONS
    • 从石油钻井方法钻探油气藏地下采收
    • US20120132424A1
    • 2012-05-31
    • US13364913
    • 2012-02-02
    • John David WatsonMichael Helmut KoblerDana Brock
    • John David WatsonMichael Helmut KoblerDana Brock
    • E21B33/13E21B7/00
    • E21B7/046E21B41/0035E21D1/00
    • The present invention discloses a selection process for installing underground workspace in or near a hydrocarbon deposit that is an appropriate workspace from which to drill, operate and service wells applicable to any of a number of methods of recovering hydrocarbons. The present invention includes a number of innovative methods for developing workspace for drilling from a shaft installed above, into or below a hydrocarbon deposit, particularly when the hydrocarbon reservoir is at significant formation pressure or has fluids (water oil or gases) that can enter the workspace. These methods can also be used for developing workspace for drilling from a tunnel installed above, into or below a hydrocarbon deposit. The present invention also discloses a procedure for evaluating the geology in and around the reservoir and using this information to select the most appropriate method of developing workspace for drilling from a shaft and/or tunnel.
    • 本发明公开了一种选择方法,用于在烃沉积物中或附近安装地下工作空间,该沉积物是可适用于多种回收碳氢化合物的任何方法的井的钻井,操作和维修的适当工作空间。 本发明包括许多创新的方法,用于开发用于从安装在烃沉积物上方,进入或低于烃沉积物的轴进行钻孔的工作空间,特别是当烃储存器处于显着地层压力时或具有能够进入该油藏的流体(水油或气体) 工作区 这些方法也可用于开发从安装在上面,进入或低于烃沉积物的隧道进行钻井的工作空间。 本发明还公开了一种用于评估储层内和周围地质的程序,并且使用该信息来选择开发用于从轴和/或隧道进行钻孔的工作空间的最合适的方法。
    • 8. 发明授权
    • Method of drilling from a shaft for underground recovery of hydrocarbons
    • 从井中钻出用于地下回收碳氢化合物的方法
    • US08127865B2
    • 2012-03-06
    • US11737578
    • 2007-04-19
    • John David WatsonMichael Helmut KoblerDana Brock
    • John David WatsonMichael Helmut KoblerDana Brock
    • E21B7/04E02D29/00
    • E21B7/046E21B41/0035E21D1/00
    • The present invention discloses a selection process for installing underground workspace in or near a hydrocarbon deposit that is an appropriate workspace from which to drill, operate and service wells applicable to any of a number of methods of recovering hydrocarbons. The present invention includes a number of innovative methods for developing workspace for drilling from a shaft installed above, into or below a hydrocarbon deposit, particularly when the hydrocarbon reservoir is at significant formation pressure or has fluids (water oil or gases) that can enter the workspace. These methods can also be used for developing workspace for drilling from a tunnel installed above, into or below a hydrocarbon deposit. The present invention also discloses a procedure for evaluating the geology in and around the reservoir and using this information to select the most appropriate method of developing workspace for drilling from a shaft and/or tunnel.
    • 本发明公开了一种选择方法,用于在烃沉积物中或附近安装地下工作空间,该沉积物是可适用于多种回收碳氢化合物的任何方法的井的钻井,操作和维修的适当工作空间。 本发明包括许多创新的方法,用于开发用于从安装在烃沉积物上方,进入或低于烃沉积物的轴进行钻孔的工作空间,特别是当烃储存器处于显着地层压力时或具有能够进入该油藏的流体(水油或气体) 工作区 这些方法也可用于开发从安装在上面,进入或低于烃沉积物的隧道进行钻井的工作空间。 本发明还公开了一种用于评估储层内和周围地质的程序,并且使用该信息来选择开发用于从轴和/或隧道进行钻孔的工作空间的最合适的方法。