会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Bi-layer oxide ferroelectrics
    • 双层氧化物铁电体
    • US5914068A
    • 1999-06-22
    • US765575
    • 1996-12-30
    • Masahiko HirataniKeiko KushidaKazushige ImagawaKazumasa Takagi
    • Masahiko HirataniKeiko KushidaKazushige ImagawaKazumasa Takagi
    • C04B35/453C30B29/22
    • C04B35/453
    • Novel Bi-layer Perovskite ferroelectrics constituted of BiO intermediate layers (17) and pseudo-Perovskite layers (18) stacked alternately are disclosed. The Bi-layer Perovskite ferroelectrics have such a crystal structure which has a fundamental skeleton composed of each intermediate layer (17) consisting of one BiO plane and each pseudo-Perovskite structure (18) consisting of Pb(Zr, Ti)O.sub.3. Since the intermediate layer (17) is constituted of the BiO layer, the ferroelectrics are more excellent in ferroelectric characteristics and thermodynamic stability than known Perovskite ferroelectrics comprising a Bi.sub.2 O.sub.2 layer.
    • PCT No.PCT / JP95 / 01205 Sec。 371日期1996年12月30日第 102(e)日期1996年12月30日PCT归档1995年6月16日PCT公布。 出版物WO96 / 00704 日期1996年1月11日公开了由交替堆叠的BiO中间层(17)和伪钙钛矿层(18)构成的新型双层钙钛矿型铁电体。 双层钙钛矿铁电体具有这样的晶体结构,其具有由由一个BiO平面构成的每个中间层(17)和由Pb(Zr,Ti)O 3组成的每个假钙钛矿结构(18)组成的基本骨架。 由于中间层(17)由BiO层构成,所以铁电体的铁电特性和热力学稳定性优于包括Bi 2 O 2层的已知钙钛矿型铁电体。
    • 6. 发明申请
    • MOUNTING BASE
    • 安装基座
    • US20140311068A1
    • 2014-10-23
    • US13993818
    • 2011-12-15
    • Kazumasa TakagiEizou Takagi
    • Kazumasa TakagiEizou Takagi
    • E02D27/32E02D27/01E02D27/50
    • E02D27/32E02D27/01E02D27/50E04D13/1407F16M9/00F24F13/32F24S25/61F24S25/617Y02E10/47
    • A mounting base (10A) that shortens construction time and reduces cost is formed from a metal foundation (16), a metal cover (17), height-adjusting bolts (18), support bolts (19), and mortar (20). In the base (10A), the first fixed ends (47) of the bolts (19) are inserted into support bolt insertion holes (39) formed in a metal plate (24) and are fixed to the metal plate (24) with nuts (50), and the second fixed ends (48) of the bolts (19) are fixed to a concrete slab (12) with nuts (51). The portion of the first fixed ends (47) of the bolts (19) which extends between the metal plate (24) and the top surface of the concrete slab (12) is integrated with the mortar (29) filled into the space (46), and the metal cover (17) covers the opening (27) at the top of a metal tube (23).
    • 金属基座(16),金属盖(17),高度调节螺栓(18),支撑螺栓(19)和砂浆(20)形成了缩短施工时间并降低成本的安装基座(10A)。 在基座(10A)中,螺栓(19)的第一固定端(47)插入形成在金属板(24)中的支撑螺栓插入孔(39)中,并用螺母固定到金属板(24) (50),螺栓(19)的第二固定端(48)用螺母(51)固定在混凝土板(12)上。 在金属板(24)和混凝土板(12)的上表面之间延伸的螺栓(19)的第一固定端部(47)的一部分与填充到空间(46)中的砂浆 ),并且金属盖(17)覆盖在金属管(23)的顶部的开口(27)。