会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Clamp pressure optimization system and method
    • 夹压优化系统及方法
    • US6048476A
    • 2000-04-11
    • US39637
    • 1998-03-16
    • Manfred LausenhammerChristopher Choi
    • Manfred LausenhammerChristopher Choi
    • B29C45/76B29C45/77B29C45/82
    • B29C45/7653B29C45/77
    • The present invention relates to a method and a system for preventing mold flash. The method broadly comprises the steps of: introducing a fluid under pressure into a mechanism for applying a clamping force such as the clamping cylinder of a piston-cylinder unit; increasing the pressure of the fluid in the clamping force applying mechanism so as to apply a clamping force to the mold; injecting moldable material into the mold; measuring actual pressure in the clamping force applying mechanism; and determining whether the mold is close to blowing open when the moldable material is injected into the mold using the actual measured pressure in the clamping cylinder. The method further comprises providing an injection unit having an injection cylinder; supplying fluid under pressure to the injection cylinder; measuring the actual injection pressure of the fluid in the injection cylinder; and determining whether the actual injection pressure is below the pressure needed to blow the mold open under existing clamp conditions. The system of the present invention includes a pressure sensor for measuring the actual pressure within the clamping force application mechanism and a controller provided with logic for determining whether the mold is close to blowing open when the moldable material is injected into the mold using the measured actual clamp pressure.
    • 本发明涉及防止模具闪光的方法和系统。 该方法广泛地包括以下步骤:将压力下的流体引入用于施加夹紧力的机构,例如活塞 - 气缸单元的夹紧缸; 增加夹紧力施加机构中的流体的压力,以向模具施加夹紧力; 将可模塑材料注入模具中; 测量夹紧力施加机构中的实际压力; 以及当使用夹紧缸中的实际测量压力将可模制材料注入模具时,确定模具是否接近吹开。 该方法还包括提供具有注射缸的注射单元; 将液体在压力下供给到注射缸; 测量注射缸中流体的实际注射压力; 并且确定实际的注射压力是否低于在现有的夹紧条件下吹塑模具所需的压力。 本发明的系统包括:用于测量夹紧力施加机构内的实际压力的压力传感器;以及控制器,该控制器设置有逻辑,用于当使用测量的实际值将模具材料注入模具时,确定模具是否接近吹开 夹紧压力。
    • 2. 发明授权
    • Cooling system for sleeves that are fixed to a carrier plate
    • 用于固定在承载板上的套筒的冷却系统
    • US07306452B2
    • 2007-12-11
    • US10506706
    • 2003-02-12
    • Manfred LausenhammerHelmut Thömmes
    • Manfred LausenhammerHelmut Thömmes
    • B29C45/72
    • B29C45/7207B29C2045/7214B29C2045/725B29K2105/253
    • A cooling system for cooling sleeves (2) fixed to a carrier plate (1), by means of a fluid which is passed from a fluid inlet (15) to a fluid outlet (22) by way of fluid conduits (7, 14, 10, 11, 21) supported by means of the carrier plate (1). The fluid conduits (7, 14, 10, 11, 21) include main supply conduits (7) and supply conduits (10, 11) which extend approximately transversely with respect to each other. The supply conduits extend in a mutually parallel relationship and are arranged in pairs in the carrier plate (1) and are connected to a row of sleeves (2) by way of intake (16) and discharge conduits (17). The row of sleeves (2) is so disposed between the supply conduits (10, 11) of a pair such that each sleeve (2) is connected to both supply conduits (10, 11), and fluid communication is interrupted (plug 24) in at least the one supply conduit (10) of the pair substantially at the middle of its longitudinal extent (l).
    • 一种用于冷却套筒(2)的冷却系统,其借助于通过流体导管(7,14)从流体入口(15)流到流体出口(22)的流体固定到承载板(1) 10,11,21)通过承载板(1)支撑。 流体管道(7,14,10,11,21)包括主供应管道(7)和相对于彼此大致横向延伸的供应管道(10,11)。 供应管道以相互平行的关系延伸并且成对地布置在承载板(1)中,并且通过进气(16)和排出管道(17)连接到一排套管(2)。 一排套管(2)设置在一对的供应管道(10,11)之间,使得每个套筒(2)连接到两个供应管道(10,11),并且流体连通中断(塞子24) 在至少一个供应管道(10)中,大致在其纵向范围(1)的中间。
    • 5. 发明申请
    • Cooling system for sleeves that are fixed to a carrier plate
    • 用于固定在承载板上的套筒的冷却系统
    • US20050161860A1
    • 2005-07-28
    • US10506706
    • 2003-02-12
    • Manfred LausenhammerHelmut Thommes
    • Manfred LausenhammerHelmut Thommes
    • B29C45/72B29C71/00
    • B29C45/7207B29C2045/7214B29C2045/725B29K2105/253
    • A cooling system for cooling sleeves (2) fixed to a carrier plate (1), by means of a fluid which is passed from a fluid inlet (15) to a fluid outlet (22) by way of fluid conduits (7, 14, 10, 11, 21) supported by means of the carrier plate (1). The fluid conduits (7, 14, 10, 11, 21) include main supply conduits (7) and supply conduits (10, 11) which extend approximately transversely with respect to each other. The supply conduits extend in a mutually parallel relationship and are arranged in pairs in the carrier plate (1) and are connected to a row of sleeves (2) by way of intake (16) and discharge conduits (17). The row of sleeves (2) is so disposed between the supply conduits (10, 11) of a pair such that each sleeve (2) is connected to both supply conduits (10, 11), and fluid communication is interrupted (plug 24) in at least the one supply conduit (10) of the pair substantially at the middle of its longitudinal extent (l).
    • 一种用于冷却套筒(2)的冷却系统,其借助于通过流体导管(7,14)从流体入口(15)流到流体出口(22)的流体固定到承载板(1) 10,11,21)通过承载板(1)支撑。 流体管道(7,14,10,11,21)包括主供应管道(7)和相对于彼此大致横向延伸的供应管道(10,11)。 供应管道以相互平行的关系延伸并且成对地布置在承载板(1)中,并且通过进气(16)和排出管道(17)连接到一排套管(2)。 一排套管(2)设置在一对的供应管道(10,11)之间,使得每个套筒(2)连接到两个供应管道(10,11),并且流体连通中断(塞子24) 在至少一个供应管道(10)中,大致在其纵向范围(1)的中间。
    • 7. 发明授权
    • Cooling system for the cooling of tool pieces
    • 冷却系统用于冷却工具
    • US07517213B2
    • 2009-04-14
    • US10545188
    • 2004-02-10
    • Manfred LausenhammerChristian Wagner
    • Manfred LausenhammerChristian Wagner
    • B29C45/73
    • B29C45/7207B29C45/73B29C49/6427B29C2033/042B29C2045/725
    • A cooling system for cooling tool parts. The system includes at least one base system including a fluid guided from a fluid inlet through connector lines to a fluid outlet. The tool parts are connected in the direction of through-flow between at least one connector line connected to the fluid inlet and at least one connected to the fluid outlet, wherein, between the at least one connector line connected to the fluid inlet and the at least one connector line connected to the fluid outlet, at least one additional connector line and tool parts which are in flow communication therewith are placed in between such that, on its flow path, the fluid flows through at least two tool parts one after the other.
    • 冷却工具零件的冷却系统。 该系统包括至少一个基本系统,其包括通过连接器线从流体入口引导到流体出口的流体。 所述工具部件在连接到所述流体入口的至少一个连接器线路与连接到所述流体出口的至少一个连接器线路之间的通流方向上连接,其中,所述至少一个连接到所述流体入口的连接器线路 连接到流体出口的至少一个连接器线路,至少一个额外的连接器线路和与其流动连通的工具部件被放置在两者之间,使得在其流动路径上,流体一个接一个地流过至少两个工具部件 。
    • 10. 发明授权
    • Quick-change molding system for injection molding
    • 注塑成型快速成型系统
    • US08480391B2
    • 2013-07-09
    • US13206144
    • 2011-08-09
    • Manfred LausenhammerJohn Di Simone
    • Manfred LausenhammerJohn Di Simone
    • B29C45/22
    • B29C45/2675B29C2045/4078B29K2105/258
    • A molding system is disclosed that includes a plurality of cavity portions or core block assemblies attached to a mold plate and a plurality of core portion or core block assemblies attached to a second mold plate, and a plurality of stripper rings or thread split-slide assemblies attached to a stripper plate assembly. The stripper plate assembly includes a main stripper plate with one or more stripper plate panels coupled thereto that are translatable away from the main stripper plate during installation of at least the core portions or core block assemblies. The one or more stripper plate panels may be translatable to fold, outwardly swing, and/or slide relative to the main stripper plate to clear any core portions or core block assemblies that may have been previously installed.
    • 公开了一种模制系统,其包括附接到模板的多个空腔部分或芯块组件,以及附接到第二模板的多个芯部或芯块组件,以及多个剥离环或螺纹分离滑动组件 连接到剥离板组件。 脱模板组件包括具有联接到其上的一个或多个剥离板板的主剥离板,其在至少芯部或芯块组件的安装期间可远离主剥离板平移。 一个或多个剥离板板可以相对于主剥离板折叠,向外摆动和/或滑动以清除可能已经预先安装的任何芯部或芯块组件。