会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Production management method and production management system
    • 生产管理方法和生产管理制度
    • US07660645B2
    • 2010-02-09
    • US11710969
    • 2007-02-27
    • Hiroaki IzumiKatsuhiko Takahashi
    • Hiroaki IzumiKatsuhiko Takahashi
    • G06F19/00
    • G06Q10/06
    • Processing apparatuses A, B, C, and D are included in a job-shop production line, and process 1 to process 6 are performed by the processing apparatuses A, B, C, B, D, and B, respectively. The processing apparatus B is repeatedly used in process 2, process 4, and process 6; therefore, these processes are key processes. Based on the key processes, process 1 to process 6 are classified into a plurality of groups, and the number of in-process products of each of the groups is counted by a counting unit. According to this, a determining unit determines priority orders of the key processes such that a higher priority is given to a key process in a group having a large number of the in-process products. Thus, it becomes possible to perform determination of the priority orders further according to an actual situation, and to improve production efficiency.
    • 处理装置A,B,C和D包括在作业车间生产线中,处理装置A,B,C,B,D和B分别执行处理1至处理6。 在处理2,处理4和处理6中重复使用处理装置B. 因此,这些过程是关键过程。 基于关键过程,过程1至过程6被分类为多个组,并且通过计数单元对每个组的过程中产品的数量进行计数。 据此,确定单元确定密钥处理的优先顺序,使得对具有大量进程内产品的组中的密钥处理给予更高的优先级。 因此,可以根据实际情况进一步确定优先级顺序,并且提高生产效率。
    • 5. 发明申请
    • Roller chain and guide unit having the same therein
    • 滚子链和引导单元在其中具有相同的
    • US20050152625A1
    • 2005-07-14
    • US11028513
    • 2005-01-04
    • Shouji NagaoHiroaki IzumiNoriaki Kataoka
    • Shouji NagaoHiroaki IzumiNoriaki Kataoka
    • F16C29/06F16C33/46F16C33/49F16C33/66
    • F16C33/506F16C29/065
    • A roller chain is provided, which is composed of more than one roller and a carrier belt. The roller chain helps make sure of keeping the rollers against moving on the skew even under carrying high loads while the carrier belt is made to have a large space to reserve lubricant sufficient to ensure good lubrication. The carrier belt is comprised of a pair of continuous bands lying to carry or bear axially opposite ends of the roller across an area set off-centre from an axis of the roller, and more than one U-type separator to join the continuous bands together with one another. The U-type separators 6 are each composed of a pair of legs joined together with their associated continuous bands, and a horizontal bridge interconnecting the sidewise spaced leg with each other.
    • 提供滚子链,其由多于一个的辊和载体带组成。 滚子链条有助于确保在承载高载荷的同时保持滚筒不会移动,同时承载带具有较大的空间以预留足以确保良好润滑的润滑剂。 传送带由一对连续的带组成,这些连续带位于从辊的轴线偏心设置的区域上承载或承载辊的轴向相对端,以及多于一个U型分离器将连续带连接在一起 彼此之间。 U型分离器6分别由连接在一起的一对腿和相连的连续带组成,并且将横向间隔的腿彼此相互连接的水平桥。
    • 10. 发明申请
    • Production management method and production management system
    • 生产管理方法和生产管理制度
    • US20070203601A1
    • 2007-08-30
    • US11710969
    • 2007-02-27
    • Hiroaki IzumiKatsuhiko Takahashi
    • Hiroaki IzumiKatsuhiko Takahashi
    • G06F19/00
    • G06Q10/06
    • Processing apparatuses A, B, C, and D are included in a job-shop production line, and process 1 to process 6 are performed by the processing apparatuses A, B, C, B, D, and B, respectively. The processing apparatus B is repeatedly used in process 2, process 4, and process 6; therefore, these processes are key processes. Based on the key processes, process 1 to process 6 are classified into a plurality of groups, and the number of in-process products of each of the groups is counted by a counting unit. According to this, a determining unit determines priority orders of the key processes such that a higher priority is given to a key process in a group having a large number of the in-process products. Thus, it becomes possible to perform determination of the priority orders further according to an actual situation, and to improve production efficiency.
    • 处理装置A,B,C和D包括在作业车间生产线中,处理装置A,B,C,B,D和B分别执行处理1至处理6。 在处理2,处理4和处理6中重复使用处理装置B. 因此,这些过程是关键过程。 基于关键过程,过程1至过程6被分类为多个组,并且通过计数单元对每个组的过程中产品的数量进行计数。 据此,确定单元确定密钥处理的优先顺序,使得对具有大量进程内产品的组中的密钥处理给予更高的优先级。 因此,可以根据实际情况进一步确定优先级顺序,并且提高生产效率。