会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Casing expansion and formation compression for permeability plane orientation
    • 套管膨胀和地层压缩用于渗透率平面取向
    • US07814978B2
    • 2010-10-19
    • US11610819
    • 2006-12-14
    • David J. SteeleTravis W. CavenderRoger L. SchultzJohn C. GanoGrant Hocking
    • David J. SteeleTravis W. CavenderRoger L. SchultzJohn C. GanoGrant Hocking
    • E21B43/112E21B43/26E21B29/00
    • E21B43/26E21B43/103
    • Casing expansion and formation compression for permeability plane orientation. A method of forming at least one increased permeability plane in a subterranean formation includes the steps of: installing a casing section in a wellbore intersecting the formation; expanding the casing section in the wellbore; and then injecting a fluid into the formation, the injecting step being performed after the expanding step is completed. Another method includes the steps of: applying an increased compressive stress to the formation, the compressive stress being radially directed relative to a wellbore intersecting the formation; and then piercing the formation radially outward from the wellbore, thereby initiating the increased permeability plane. Yet another method includes the steps of: applying a reduced stress to the formation, the reduced stress being directed orthogonal to a wellbore intersecting the formation; and then piercing the formation with at least one penetration extending radially outward from the wellbore, thereby relieving the reduced stress at the penetration.
    • 套管膨胀和地层压缩用于渗透率平面取向。 在地层中形成至少一个增加的渗透率平面的方法包括以下步骤:在与地层相交的井筒中安装套管段; 扩大井筒内的套管部分; 然后将流体注入到地层中,在扩展步骤完成之后执行注入步骤。 另一种方法包括以下步骤:向地层施加增加的压缩应力,压缩应力相对于与地层相交的井眼径向定向; 然后从井筒径向向外刺穿地层,从而引发增加的渗透面。 另一种方法包括以下步骤:对地层施加减小的应力,减小的应力被定向成与与地层相交的井眼正交; 然后用从井筒径向向外延伸的至少一个穿透物刺穿地层,从而减轻穿透时的减小的应力。
    • 2. 发明申请
    • Casing Expansion and Formation Compression for Permeability Plane Orientation
    • 套管膨胀和形成压缩渗透率平面取向
    • US20080142219A1
    • 2008-06-19
    • US11610819
    • 2006-12-14
    • David J. SteeleTravis W. CavenderRoger L. SchultzJohn C. Gano
    • David J. SteeleTravis W. CavenderRoger L. SchultzJohn C. Gano
    • E21B43/26
    • E21B43/26E21B43/103
    • Casing expansion and formation compression for permeability plane orientation. A method of forming at least one increased permeability plane in a subterranean formation includes the steps of: installing a casing section in a wellbore intersecting the formation; expanding the casing section in the wellbore; and then injecting a fluid into the formation, the injecting step being performed after the expanding step is completed. Another method includes the steps of: applying an increased compressive stress to the formation, the compressive stress being radially directed relative to a wellbore intersecting the formation; and then piercing the formation radially outward from the wellbore, thereby initiating the increased permeability plane. Yet another method includes the steps of: applying a reduced stress to the formation, the reduced stress being directed orthogonal to a wellbore intersecting the formation; and then piercing the formation with at least one penetration extending radially outward from the wellbore, thereby relieving the reduced stress at the penetration.
    • 套管膨胀和地层压缩用于渗透率平面取向。 在地层中形成至少一个增加的渗透率平面的方法包括以下步骤:在与地层相交的井筒中安装套管段; 扩大井筒内的套管部分; 然后将流体注入到地层中,在扩展步骤完成之后执行注入步骤。 另一种方法包括以下步骤:向地层施加增加的压缩应力,压缩应力相对于与地层相交的井眼径向定向; 然后从井筒径向向外刺穿地层,从而引发增加的渗透面。 另一种方法包括以下步骤:对地层施加减小的应力,减小的应力被定向成与与地层相交的井眼正交; 然后用从井筒径向向外延伸的至少一个穿透物刺穿地层,从而减轻穿透时的减小的应力。