会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 64. 发明授权
    • Integrated paving process control for a paving operation
    • 铺路操作的综合铺路过程控制
    • US08930092B2
    • 2015-01-06
    • US13438023
    • 2012-04-03
    • Mark Minich
    • Mark Minich
    • E01C23/07G06F19/00
    • E01C19/48E01C19/004E01C19/1063E01C19/23E01C23/07Y02A30/333
    • Process control for a paving operation is facilitated by obtaining paving material conveyance information for a time period during which paving material is delivered to a screed of a paver by a material conveyance system and distributed over a surface to be paved. The paving material conveyance information includes data indicating incremental advance of the paving material to the screed of the paver during the period of time and data indicating incremental quantity of the paving material at one or more points of the material conveyance system, both of which are correlated to points in time during the time period at which the data is acquired. Incremental quantity of paving material delivered to the screed is determined to facilitate process control in the paving operation.
    • 通过在通过材料输送系统将铺路材料输送到摊铺机的熨平板并分布在待铺设的表面上的时间段内获得铺路材料输送信息,便于铺路操作的过程控制。 铺路材料输送信息包括表示铺路材料在该段时间内对摊铺机的熨平板的增量提前量的数据,以及表示材料输送系统的一个或多个点处的铺路材料的增量的数据,两者相关 到获取数据的时间段内的时间点。 确定输送到熨平板的铺路材料的增加量,以便于铺路操作中的过程控制。
    • 66. 发明授权
    • Mobile paving machine
    • 移动铺路机
    • US08591141B2
    • 2013-11-26
    • US13227888
    • 2011-09-08
    • Johann Owegeser
    • Johann Owegeser
    • E01C23/07E01C19/22
    • E01C19/48E01C19/004
    • The invention concerns a mobile paving machine for the installation of ground covering material, with a smoothing board for stripping off the ground covering material, the smoothing board being adjustable in height and the paving machine having a probing unit with a probing foot, which probes the ground level and acts on the position of the smoothing board so that the ground covering material is flush with the ground level, wherein and the probing unit has a probing foot held by a probe support, which is articulated to a support joint, and wherein a sensor or switch unit is provided, held by a switch support, and the switch support is articulated to the probe support and interacts with the sensor or switch unit on the probe support.
    • 本发明涉及一种用于安装地面覆盖材料的移动式铺路机,具有用于剥离地面覆盖材料的平滑板,该平滑板高度可调节,并且该铺路机具有一个具有探测脚的探测单元, 并且作用于平滑板的位置,使得地面覆盖材料与地平面齐平,其中探测单元具有由探针支撑件保持的探测脚,该探针支撑件被铰接到支撑关节,并且其中 传感器或开关单元由开关支撑件保持,并且开关支撑件铰接到探针支架并与探针支架上的传感器或开关单元相互作用。
    • 67. 发明申请
    • VIBRATORY COMPACTING ROLLER MACHINE WITH AN ELECTRIC DRIVE
    • 振动压路机与电驱动
    • US20130302089A1
    • 2013-11-14
    • US13466239
    • 2012-05-08
    • Paul Sina
    • Paul Sina
    • E01C23/07B60W20/00E01C19/38
    • E02D3/032E02D3/074
    • A vibratory roller machine includes a chassis supported on one or more drum assemblies including an exciter assembly for compacting the ground on which the machine travels. The machine is operated via a number of drive and exciter motors powered by a series hybrid drive system. The series hybrid drive system includes an engine and generator that are configured to provide power to the system under nominal operating conditions. The series hybrid drive system further includes a power storage system, such as battery bank or a capacitor bank that is configured to provide the motors with additional power during peak power demand. The vibratory roller machine may, for example, be a walk-behind trench roller or ride-on roller.
    • 振动辊机包括支撑在一个或多个鼓组件上的底盘,其包括用于压实机器行进的地面的激振器组件。 该机器通过一系列由串联混合驱动系统供电的驱动和励磁电机运行。 串联混合动力驱动系统包括发动机和发电机,其被配置为在标称操作条件下向系统提供动力。 串联混合驱动系统还包括诸如电池组或电容器组的电力存储系统,其被配置为在峰值功率需求期间向电动机提供额外的功率。 振动压路机例如可以是落后沟槽辊或骑行辊。
    • 69. 发明申请
    • ROAD PAVER WITH LAYER THICKNESS MEASURING DEVICE
    • 具有层厚度测量装置的道路板
    • US20120321384A1
    • 2012-12-20
    • US13524744
    • 2012-06-15
    • Dennis HanflandRalf Weiser
    • Dennis HanflandRalf Weiser
    • E01C23/07E01C11/24
    • G01B21/08E01C19/48E01C23/01
    • A road paver with a movable screed and with a layer thickness measuring device, which includes at least two sensors. The sensors are formed to carry out a distance measurement to the paving plane at intervals to determine a distance between the sensor and a point on the surface of the plane, said point being registered by the sensor. One of the two sensors defines a coordinate system. The layer thickness measuring device is formed to add as vectors the distance to the plane measured by the sensor that defines the coordinate system and a movement, relative to the plane and resulting from the driving of the road paver, of the coordinate system that is defined by the one sensor. In this way, a first vector can be determined which, together with a second vector, is used by the measuring device for determining the layer thickness of the laying material.
    • 一种具有可移动熨平板和层厚度测量装置的摊铺机,其包括至少两个传感器。 传感器被形成为对铺路平面进行间隔距离测量,以确定传感器与平面表面上的点之间的距离,所述点由传感器记录。 两个传感器之一定义了坐标系。 层厚测量装置被形成为作为向量添加由定义坐标系的传感器测量到的平面的距离,以及相对于平面并由道路铺路机的驱动导致的定义的坐标系的运动 由一个传感器。 以这种方式,可以确定第一矢量与测量装置一起用于确定铺设材料的层厚度的第二矢量。
    • 70. 发明申请
    • Integrated Paving Process Control For A Paving Operation
    • 用于铺路操作的综合铺路过程控制
    • US20120288328A1
    • 2012-11-15
    • US13438023
    • 2012-04-03
    • Mark MINICH
    • Mark MINICH
    • E01C11/24E01C23/07
    • E01C19/48E01C19/004E01C19/1063E01C19/23E01C23/07Y02A30/333
    • Process control for a paving operation is facilitated by obtaining paving material conveyance information for a time period during which paving material is delivered to a screed of a paver by a material conveyance system and distributed over a surface to be paved. The paving material conveyance information includes data indicating incremental advance of the paving material to the screed of the paver during the period of time and data indicating incremental quantity of the paving material at one or more points of the material conveyance system, both of which are correlated to points in time during the time period at which the data is acquired. Incremental quantity of paving material delivered to the screed is determined to facilitate process control in the paving operation.
    • 通过在通过材料输送系统将铺路材料输送到摊铺机的熨平板并分布在待铺设的表面上的时间段内获得铺路材料输送信息,便于铺路操作的过程控制。 铺路材料输送信息包括表示铺路材料在该段时间内对摊铺机的熨平板的增量提前量的数据,以及表示材料输送系统的一个或多个点处的铺路材料的增量的数据,两者相关 到获取数据的时间段内的时间点。 确定输送到熨平板的铺路材料的增加量,以便于铺路操作中的过程控制。