会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Integrated paving process control for a paving operation
    • 铺路操作的综合铺路过程控制
    • US08930092B2
    • 2015-01-06
    • US13438023
    • 2012-04-03
    • Mark Minich
    • Mark Minich
    • E01C23/07G06F19/00
    • E01C19/48E01C19/004E01C19/1063E01C19/23E01C23/07Y02A30/333
    • Process control for a paving operation is facilitated by obtaining paving material conveyance information for a time period during which paving material is delivered to a screed of a paver by a material conveyance system and distributed over a surface to be paved. The paving material conveyance information includes data indicating incremental advance of the paving material to the screed of the paver during the period of time and data indicating incremental quantity of the paving material at one or more points of the material conveyance system, both of which are correlated to points in time during the time period at which the data is acquired. Incremental quantity of paving material delivered to the screed is determined to facilitate process control in the paving operation.
    • 通过在通过材料输送系统将铺路材料输送到摊铺机的熨平板并分布在待铺设的表面上的时间段内获得铺路材料输送信息,便于铺路操作的过程控制。 铺路材料输送信息包括表示铺路材料在该段时间内对摊铺机的熨平板的增量提前量的数据,以及表示材料输送系统的一个或多个点处的铺路材料的增量的数据,两者相关 到获取数据的时间段内的时间点。 确定输送到熨平板的铺路材料的增加量,以便于铺路操作中的过程控制。
    • 2. 发明申请
    • Integrated Paving Process Control For A Paving Operation
    • 用于铺路操作的综合铺路过程控制
    • US20120288328A1
    • 2012-11-15
    • US13438023
    • 2012-04-03
    • Mark MINICH
    • Mark MINICH
    • E01C11/24E01C23/07
    • E01C19/48E01C19/004E01C19/1063E01C19/23E01C23/07Y02A30/333
    • Process control for a paving operation is facilitated by obtaining paving material conveyance information for a time period during which paving material is delivered to a screed of a paver by a material conveyance system and distributed over a surface to be paved. The paving material conveyance information includes data indicating incremental advance of the paving material to the screed of the paver during the period of time and data indicating incremental quantity of the paving material at one or more points of the material conveyance system, both of which are correlated to points in time during the time period at which the data is acquired. Incremental quantity of paving material delivered to the screed is determined to facilitate process control in the paving operation.
    • 通过在通过材料输送系统将铺路材料输送到摊铺机的熨平板并分布在待铺设的表面上的时间段内获得铺路材料输送信息,便于铺路操作的过程控制。 铺路材料输送信息包括表示铺路材料在该段时间内对摊铺机的熨平板的增量提前量的数据,以及表示材料输送系统的一个或多个点处的铺路材料的增量的数据,两者相关 到获取数据的时间段内的时间点。 确定输送到熨平板的铺路材料的增加量,以便于铺路操作中的过程控制。