会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 35. 发明申请
    • Method for verifying a programmed flash memory
    • 用于验证编程闪存的方法
    • US20050149664A1
    • 2005-07-07
    • US10962588
    • 2004-10-13
    • Ming-Hung ChouHsin-Yi Ho
    • Ming-Hung ChouHsin-Yi Ho
    • G11C11/34G11C16/34
    • G11C16/3459G11C16/3454
    • A method for verifying a programmed flash memory. When reading a memory cell, a voltage applied to a drain of the memory cell is a read drain voltage. First, a word line is enabled by applying a verification gate voltage. Next, a first bit line, which is connected to the drain of the memory cell, is enabled and a verification drain voltage, which is higher than the read drain voltage, is applied to the first bit line. Then, a second bit line is enabled and grounded. Thereafter, a third bit line is enabled and a verification isolation voltage is applied. Then, a drain current of the first bit line is sensed, wherein the drain current flows through the first bit line, the memory cell, and the second bit line. Finally, it is judged whether or not the memory cell is successfully programmed according to the drain current.
    • 一种验证编程闪存的方法。 当读取存储单元时,施加到存储单元的漏极的电压是读取漏极电压。 首先,通过应用验证门电压来启用字线。 接下来,连接到存储单元的漏极的第一位线被使能,并且将高于读取的漏极电压的验证漏极电压施加到第一位线。 然后,第二位线被使能并接地。 此后,启用第三位线并施加验证隔离电压。 然后,感测第一位线的漏极电流,其中漏极电流流过第一位线,存储器单元和第二位线。 最后,根据漏极电流判断存储单元是否成功编程。
    • 39. 发明申请
    • TESTING SYSTEM
    • 测试系统
    • US20120269068A1
    • 2012-10-25
    • US13157634
    • 2011-06-10
    • MING-HUNG CHOUCHING-FENG HSIEH
    • MING-HUNG CHOUCHING-FENG HSIEH
    • H04L12/26H04B10/08
    • H04L43/50H04L43/0811
    • A testing system for testing a network apparatus has a plurality of network ports. The system includes a signal generating device for providing a test packet to the network apparatus; a network apparatus connecting device for connecting to the network apparatus; a switching device for switching between a plurality of router lines; and a controlling device for controlling a test procedure, by controlling selection and cycling of the router lines to perform a test on the network ports one by one and allowing the network ports to return the test packet by the test packet return instruction. Accordingly, the network connection status of the network ports of the network apparatus is determined according to the test packet. The test system allows a test to be conducted on the network ports of the network apparatus quickly and at low costs.
    • 用于测试网络设备的测试系统具有多个网络端口。 该系统包括用于向网络设备提供测试分组的信号产生设备; 网络设备连接设备,用于连接到网络设备; 用于在多个路由器线路之间切换的切换装置; 以及用于控制测试过程的控制设备,通过控制路由器线路的选择和循环,逐个对网络端口进行测试,并允许网络端口通过测试分组返回指令返回测试分组。 因此,根据测试包确定网络装置的网络端口的网络连接状态。 测试系统允许在网络设备的网络端口上以低成本快速进行测试。