会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 10. 发明专利
    • Floating body for support for tension mooring floating body and towing method and installation method of tension mooring floating body using the same
    • 用于支撑运动浮体的支撑体和牵引方法以及使用其的张力运动浮动体的安装方法
    • JP2010115978A
    • 2010-05-27
    • JP2008289204
    • 2008-11-11
    • Mitsui Eng & Shipbuild Co Ltd三井造船株式会社
    • YAMASHITA SUSUMUSUZUKI HIROSHIKANETSUNA MASAO
    • B63B21/56B63B21/50B63B35/00B63B35/44
    • B63B35/44B63B1/107B63B1/125B63B5/18B63B21/502B63B2001/128B63B2035/446F03D13/25F05B2240/93Y02E10/727
    • PROBLEM TO BE SOLVED: To provide a floating body for support for a tension mooring floating body capable of sufficiently supporting towing and installation work of the tension mooring floating body by the floating body for support temporarily arranged at least at one of the time of towing and the time of the installation work, and a towing method and an installation method of the tension mooring floating body using this. SOLUTION: The floating body 20 for support is arranged along the tension mooring floating body 1 at least at one of the towing time and the time for the installation work in order to support the towing work or the installation work of the tension mooring floating body 1, the tension mooring floating body 1 having a central columnar body 12a passing through the surface of the water, columnar bodies 12c arranged in the circumference of the central columnar body 12a and on which end parts on the upper end side of a tension mooring wire is fixed, and connecting members 12b to connect the central columnar body 12a and the columnar bodies 12c for mooring to each other. The floating body 20 is arranged along the columnar bodies 12c for mooring in a state free to relatively vertically move the floating body 20 for support between itself and the columnar bodies 12c for mooring. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种用于支撑张紧系泊浮体的浮动体,其能够充分地支撑由至少一个时间暂时布置的用于支撑物的浮体的牵引系泊浮体的牵引和安装作业 的牵引和安装工作的时间,以及使用该张力系泊浮体的牵引方法和安装方法。 解决方案:用于支撑的浮动体20至少在牵引时间和安装时间之间沿着张力系泊浮体1布置,以支撑牵引作业或张紧系泊的安装作业 浮体1,具有穿过水面的中心柱状体12a的张力系泊浮体1,布置在中心柱状体12a的圆周上的柱状体12c,上端侧的端部处于张力 系泊绳固定,连接构件12b连接中心柱体12a和柱状体12c,用于系泊。 浮体20沿着柱状体12c布置,用于系泊状态,该状态可自由地相对垂直地移动浮体20,用于在其与用于系泊的柱状体12c之间进行支撑。 版权所有(C)2010,JPO&INPIT