热词
    • 4. 发明专利
    • Caisson and construction method for the same
    • 其CAISSON及其构造方法
    • JP2013249594A
    • 2013-12-12
    • JP2012123285
    • 2012-05-30
    • Zenitaka Corp株式会社錢高組Yamaha Tokyo Co Ltd株式会社ヤマハ化工東京
    • MORI MASATSUGUTAKENAKA KAZUYUKISHIRAKO MASANORIYAMAGISHI HIDEAKIOCHIAI KOICHI
    • E02D23/00E02D27/18E21D5/04
    • PROBLEM TO BE SOLVED: To provide a caisson which does not float even with buoyancy of underground water when constructing a vertical shaft or a foundation using a skeleton with a weight thereof trimmed within a limit of satisfying a strength condition as a structural body and to provide a construction method for the caisson.SOLUTION: A construction method for a caisson comprises: an installation process to install a skeleton in the ground at a predetermined depth; and a process to construct, after the installation process, floatation prevention members which extend from a side wall of the skeleton towards the ground and are fixed to the side wall. The floatation prevention members prevent the caisson from being floated in a manner that maintains the caisson at the predetermined depth against large buoyancy of underground water acting on the caisson after the same is installed.
    • 要解决的问题:提供一种即使在地下水的浮力的情况下也不会浮动的沉箱,在使用具有在满足作为结构体的强度条件的极限内的重量的骨架构造立式轴或基座的情况下, 一种沉箱的施工方法。解决方案:一种沉箱施工方法,其特征在于,包括:将预定深度的骨架安装在地面上的安装工序; 以及在安装过程之后构建从骨架的侧壁向地面延伸并固定到侧壁的防浮浮部件的工序。 防漂浮构件防止沉箱浮起来,使得将沉箱保持在预定深度,防止在安装相同后沉积在地下水上的大量浮力。
    • 6. 发明专利
    • Caisson skeleton, caisson jacking method using the caisson skeleton, and frication reducing sheet
    • CAISSON SKELETON,CAISSON JACKING方法使用CAISSON SKELETON和减速片
    • JP2007023618A
    • 2007-02-01
    • JP2005207561
    • 2005-07-15
    • Nippon Shokubai Co LtdYamaha Kako Tokyo:KkZenitaka Corp株式会社ヤマハ化工東京株式会社日本触媒株式会社錢高組
    • MORI MASATSUGUTAKENAKA KAZUYUKIDEN SHOFUKUOCHIAI KOICHIOKAMOTO KOICHI
    • E02D23/08
    • PROBLEM TO BE SOLVED: To provide a caisson jacking method according to which frictional resistance is reduced during jacking and settling of a caisson skeleton, and a used friction reducing metallic sheet can be recovered, to thereby contribute to effective use of component members, prevention of adverse effect on the circumferential environment, and improved efficiency. SOLUTION: According to the method, the long friction reducing metallic sheets 21 which each have a friction reducing material layer 30 applied or stuck at least to an internal surface thereof, are reeled like rolls, and the reeled friction reducing metallic sheets 21 are arranged along a peripheral surface of the caisson skeleton 1 by being connected to each other at a plurality of locations. Then the friction reducing metallic sheets 21 are progressively unreeled according to jacking and settling of the caisson skeleton 1, and after completion of the jacking and settling of the caisson skeleton 1, the friction reducing metallic sheet 21 are drawn upward. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种在沉箱骨架顶起沉降期间摩擦阻力减小的沉箱顶压方法,并且可以回收二氧化碳还原金属片,从而有助于有效地利用构件 防止周边环境的不良影响,提高效率。 解决方案:根据该方法,将具有减摩材料层30至少施加或至少粘附在其内表面上的长摩擦减小金属片21卷成像卷,并且卷绕的减摩金属片21 通过在多个位置处彼此连接而沿着沉箱骨架1的外周表面布置。 然后,根据沉箱骨架1的顶起和沉降,摩擦减小金属片21逐渐未拉出,并且在沉箱骨架1的顶起和沉降完成之后,将减摩金属片21向上拉。 版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • Auxiliary equipment for penetration of cutting edge of caisson, and caisson construction method using it
    • 辅助设备用于渗透CAISSON切割边缘,以及CAISSON构造方法
    • JP2006125000A
    • 2006-05-18
    • JP2004312776
    • 2004-10-27
    • Shibuya:KkYamaha Kako Tokyo:KkZenitaka Corp株式会社シブヤ株式会社ヤマハ化工東京株式会社錢高組
    • MORI MASATSUGUFUKADA KAZUYUKITAKENAKA KAZUYUKIOCHIAI KOICHIURAMOTO MIKIOKUBO TATSUHIRO
    • E02D23/08
    • PROBLEM TO BE SOLVED: To provide auxiliary equipment for penetration of a cutting edge of a caisson and the like, which enable hard ground to be efficiently modified into soft ground by using a relatively simple constitution, and which enable the modification of the ground, conventionally hidden from view, on the periphery of the cutting edge of the caisson.
      SOLUTION: In a caisson construction method, a caisson skeleton 3, where the cutting edge 2 of the caisson is formed at its leading end, is provided in an immersed state; mud R inside the caisson skeleton 3 is excavated and discharged; a skeleton 4 is added above the caisson skeleton 3; and a caisson shaft 5 with a predetermined depth is constructed. The auxiliary equipment for the penetration of the cutting edge of the caisson, which is used for the caisson construction method, comprises: a core head 20 for substantially performing auxiliary operations for the penetration; a traveling base 22 which travels on a guide rail 21 in the state of holding the core head 20; a guide frame 24 which is integrated with the guide rail 21; a travel driving motor 25 for driving the traveling base 22; a plurality of frame fixing means 26 which are arranged in the guide frame 24 at regular intervals, so as to fix the guide frame 24 to an inner wall surface 23 of the caisson skeleton 3; and a frame hanging means 44 for holding the guide frame 24 in a hanging manner.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供用于穿透沉箱等的切削刃的辅助设备,这使得能够通过使用相对简单的结构将硬地面有效地修改为软土地面,并且能够修改 地下,通常隐藏在沉箱的切割边缘的外围。 解决方案:在沉箱施工方法中,以浸没状态设置沉箱骨架3,沉箱骨架3在其前端形成有沉箱的切削刃2, 沉井骨架3内的泥土3被挖掘出来; 在沉箱骨架3上面加上骨架4; 并且构造具有预定深度的沉箱轴5。 用于沉箱施工方法的用于沉箱的切割边缘的辅助设备包括:用于基本上进行穿透的辅助操作的芯头20; 在保持芯头20的状态下在导轨21上行进的行进基座22; 与导轨21一体化的引导框架24; 用于驱动行进基座22的行进驱动电机25; 多个框架固定装置26,其以规则的间隔布置在引导框架24中,以将引导框架24固定到沉箱骨架3的内壁表面23; 以及用于以悬挂方式保持引导框架24的框架悬挂装置44。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Resin-coated segment and shield tunnel constructed by the same
    • 树脂涂层和屏蔽隧道
    • JP2012021329A
    • 2012-02-02
    • JP2010160331
    • 2010-07-15
    • Sekisui Chem Co LtdTaisei CorpZenitaka Corp大成建設株式会社株式会社錢高組積水化学工業株式会社
    • TAKADA MASARUHAYASHI KENICHIROTAKAKURA KATSUHIKONISHIDA YOSHIOMORITA TAIJIMORI MASATSUGUTAKENAKA KAZUYUKI
    • E21D11/08E21D11/04
    • PROBLEM TO BE SOLVED: To provide a resin-coated segment which can secure load bearing performance of the resin-coated segment by firmly bonding a plate-like member made of a resin to a curved inner peripheral face and an outer peripheral face of an member in the segment, and to provide a shield tunnel constructed by the same.SOLUTION: A segment installed in a cut portion of a shield tunnel comprises: a member 31 in a segment dedicated to the cut portion, which is formed of plain concrete; and a plate-like member 32 made of a resin, which is bonded to an inner peripheral face 14 and an outer peripheral face 15 of the member 31 in the segment dedicated to the cut portion respectively. In addition, a concave and convex part 35 that is bonded to the inner peripheral face 14 and the outer peripheral face 15 of the member 31 in the segment dedicated to the cut portion with the concave and convex joint is provided at a bonding face of the inner peripheral face 14 and the outer peripheral face 15 of the member 31 in the segment dedicated to the cut portion and the plate-like member 32 made of the resin 32.
    • 要解决的问题:提供一种树脂涂层段,其可以通过将由树脂制成的板状构件牢固地粘合到弯曲的内周面和外周面上来确保树脂涂覆段的承载性能 的部分成员,并提供由其构造的盾构隧道。 解决方案:安装在盾构通道的切割部分中的段包括:专用于由普通混凝土形成的切割部分的段中的构件31; 以及由树脂制成的板状构件32,其分别与专用于切割部分的区段中的构件31的内周面14和外周面15接合。 此外,在专用于具有凹凸接头的切割部分的部分中的构件31的内周面14和外周面15上接合的凹凸部35设置在 内周面14和专用于切割部分的部件31的外周面15和由树脂32制成的板状部件32.版权所有(C)2012,JPO&INPIT