会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method of constructing grade separation at grade crossing part and viaduct
    • 构建分级交叉部分等级分级的方法
    • JP2003055912A
    • 2003-02-26
    • JP2002163777
    • 2002-06-05
    • Taisei Corp大成建設株式会社
    • SAKAMOTO OSAMUMATANO MINORUTAKAMIYA MASAHIDEKOBAYASHI MITSUHARUINAMORI HIROYASU
    • E01C1/04E01D11/04E01D24/00
    • Y02A30/68
    • PROBLEM TO BE SOLVED: To provide a method of constructing a grade separation at a grade crossing part, and a viaduct, which can reduce the range and period of traffic control compared with conventional construction work of a grade separation at a grade intersection or crossing, that is, capable of minimizing traffic jams due to the construction work.
      SOLUTION: The method of constructing a grade separation at a grade crossing part of a traffic way by use of a cable-stayed bridge includes a construction base building process for building a construction base 3 over an existing road without obstructing traffic on existing traffic roads; a main tower building process for building a main tower 1a by use of the construction base 3; a floor slab erecting process for erecting using the construction base 3 a floor slab 1b of a horizontal part and a floor slab 1b' which serves as a diagonal path leading to a first road 10a, by suspending the floor slabs from the main tower 1a by use of diagonals 1c, an horizontally overhanging the floor slabs for erecting in sequence; and a floor slab tilting process for tilting the floor slab 1b' as the diagonal path into a predetermined gradient by adjusting the diagonal 1c after erection of the floor slabs.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:提供一种在坡口交叉口或交叉路口与等级分离的常规施工工作相比,可以降低交叉口部分的坡度分离方法和高架桥,可以减少交通管制的范围和周期, 也就是说,由于施工工作,能够减少交通堵塞。 解决方案:采用斜拉桥在交通道路交叉部分建成坡度分离方法,包括建设基地建设过程,在现有道路上建设施工基地3,不妨碍现有交通道路交通; 通过施工基地3建造主塔1a的主塔建造过程; 一种用于使用施工基座3竖立一层水平部分的地板坯1b和用作通向第一道路10a的对角路径的地板1b'的地板平展装置,通过将来自主塔架1a的地板块悬挂在主塔架1a上 使用对角线1c,一个水平悬垂的楼板依次架设; 以及通过在架设楼板之后调整对角线1c,将作为对角线路的地板1b'倾斜到预定梯度的地板倾斜过程。
    • 2. 发明专利
    • Construction method of elevated bridge
    • 高架桥施工方法
    • JP2003313823A
    • 2003-11-06
    • JP2002122061
    • 2002-04-24
    • Nippon Steel CorpTaisei Corp大成建設株式会社新日本製鐵株式会社
    • TAKAMIYA MASAHIDEINAMORI HIROYASUSHIRATANI KOJIMUROI SHINJIKASAHARA KAZUHIROSATAKE TAKAHIRO
    • E01D21/00E01D1/00
    • PROBLEM TO BE SOLVED: To provide a construction method of an elevated bridge capable of moderating the traffic jam resulted from a traffic regulation according to the construction of a jointing part, in a construction method of the elevated bridge comprising horizontally erecting a girder above an existing road and inclining the girder at a prescribed gradient to construct a ramp part. SOLUTION: When a jointing bridge girder 2 is assembled in an underground space part 1 formed by digging the existing road R, and the bridge girder 12 horizontally erected above the existing road is inclined at a prescribed gradient to construct the ramp part A2, the jointing bridge girder 2 is inclined at the prescribed gradient to construct the jointing part A1 for connecting the ramp part A2 to the existing road R. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种能够根据接合部的结构的交通规则调节交通堵塞的高架桥的施工方法,在高架桥的施工方法中,包括水平地竖立大梁 在现有道路上方,并以规定的坡度倾斜大梁以构成斜坡部分。 解决方案:当将连接桥梁2组装在通过挖掘现有道路R形成的地下空间部分1中并且在现有道路上方水平竖立的桥梁12以规定的坡度倾斜以构成坡道部分A2 ,连接桥梁2以规定的坡度倾斜,构成将斜坡部分A2连接到现有道路R的连接部分A1。(C)2004,JPO
    • 3. 发明专利
    • Replacing method for bridge girder
    • 桥梁扶手的更换方法
    • JP2003034911A
    • 2003-02-07
    • JP2001223897
    • 2001-07-25
    • Taisei Corp大成建設株式会社
    • ANZAI TOSHIAKIHIRACHI MASANORIINAMORI HIROYASU
    • E01D21/00E01D24/00E01D101/24
    • PROBLEM TO BE SOLVED: To provide a replacing method for a bridge girder by which replacing work of the bridge girder can be quickly executed without using a large crane.
      SOLUTION: In a state that an existing bridge girder 1 erected on adjacent piers in the bridge axis direction is supported from the lower direction by jacks 4a laid on trucks 4b, the both ends of the existing bridge girder 1 is cut off so as to become shorter than the span L of the bridge piers 3, and at the same time, the replacing work of the bridge girder is executed by a replacing preparing process to construct a new bridge girder 2 to be erected on the bridge piers 3 on the existing girder 1, a bridge girder lowering process to lower the existing bridge girder 1 by the jacks 4a in a state that the new bridge girder 2 is laid on the existing bridge girder 1, a new bridge girder erecting process to erect the new bridge girder 2 on the bridge piers 3, and an existing bridge girder carrying-out process to carry out the existing bridge girder 1 supported by the jacks 4a.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:提供一种用于桥梁的替换方法,通过该替换方法可以在不使用大型起重机的情况下快速执行桥梁的更换工作。 解决方案:在桥架轴线方向上竖立在相邻桥墩上的现有桥梁1由放置在货车4b上的插座4a从下方支撑的状态下,切断现有桥梁1的两端,使其成为 比桥墩3的跨度L短,同时通过更换准备处理来执行桥梁的替换工作,以在现有的桥梁上的桥墩3上构造一个要架设的新的桥桁架2 如图1所示,在新桥梁2铺设在现有桥梁1上的状态下,通过千斤顶4a降低现有桥梁1的桥梁下降过程,将新桥梁2竖立起来的新的桥梁竖立过程 桥墩3,以及现有的桥墩执行过程,以执行由千斤顶4a支撑的现有桥梁1。
    • 6. 发明专利
    • Method for erecting bridge
    • 桥梁修复方法
    • JP2003313821A
    • 2003-11-06
    • JP2002117890
    • 2002-04-19
    • Mic:KkTaisei Corp大成建設株式会社株式会社ミック
    • KOBAYASHI NOBUAKISHIMIZU TORUINAMORI HIROYASUNISHIDA YASUOHIROTA SUSUMU
    • E01D21/00
    • PROBLEM TO BE SOLVED: To provide a method for erecting a bridge capable of easily carrying and erecting the bridge above a prescribed area in the state where the influence to the environment in a prescribed area is reduced since a carrying means for the bridge is not set within the prescribed area.
      SOLUTION: This method for electric bridge comprises steps of setting the bridge 1 on a lifting jack device (lifting means) 13 so that at least a length capable of crossing a roadway S (prescribed area) or a length capable of being set on a traveling truck for support (another vehicle) 10B is protruded from a traveling truck for carrying (one vehicle) 10A; moving the traveling truck 10A toward the roadway S with the protruding part of the bridge 1 forward to support the bridge 1 which crosses the roadway S by the lifting jack device 13 of the traveling truck for supporting (another vehicle) 10B; and replacing the bridge 1 on a preliminarily set pier 2 or bridge base and erecting the bridge above the roadway S.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种用于在规定区域对环境的影响减小的状态下搭建桥梁的方法,该桥架能够容易地在规定区域上承载和架设桥梁,因为桥梁的承载装置 不在规定范围内。 解决方案:该电桥的方法包括以下步骤:将桥接器1设置在提升千斤顶装置(提升装置)13上,使得能够穿过道路S(规定区域)或能够设定的长度的至少一段长度 在用于支撑的行驶车(另一车辆)10B从用于运送(一个车辆)10A的行驶车辆突出; 将行进车辆10A朝向巷道S移动,桥梁1的突出部分向前移动以通过用于支撑(另一车辆)10B的行进车辆的提升千斤顶装置13支撑跨越道路S的桥梁1; 并在预先设置的码头2或桥基座上更换桥梁1,并在道路S上方架设桥梁。版权所有(C)2004,JPO
    • 10. 发明专利
    • Support device
    • 支持设备
    • JP2004169492A
    • 2004-06-17
    • JP2002338876
    • 2002-11-22
    • Taisei Corp大成建設株式会社
    • KOBAYASHI NOBUAKIINAMORI HIROYASUKASAKURA KAZUYOSHIOBARA SUNAO
    • E01D21/00
    • PROBLEM TO BE SOLVED: To provide a support device capable of inclining a member at a predetermined angle without putting the member with the inclined surface between the member and a supporting means or setting a plurality of devices in the inclined direction of one member.
      SOLUTION: The supporting device 10 for supporting a divided top slab (member) 5 on a predetermined height is installed on a frame (body) 11 and the top of the frame 11, and it comprises a plurality of supporting means 20 for supporting the lower surface of a divided top slab 5, each supporting means 20 is expansible in the vertical direction, at the same time, it is movable in the horizontal direction at the top of the frame 11, and at least one of an amount of expansion of the supporting means 20 and an amount of horizontal movement of the supporting means 20 is adjusted to enable it to support on a predetermined height in a state to incline the divided top slab 5.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种能够将构件倾斜预定角度的支撑装置,而不将具有倾斜表面的构件放置在构件和支撑装置之间,或者在一个构件的倾斜方向上设置多个装置 。 解决方案:用于将预定高度的分开的顶板(构件)5支撑的支撑装置10安装在框架(主体)11和框架11的顶部上,并且其包括多个支撑装置20,用于 支撑分割顶板5的下表面,每个支撑装置20在垂直方向上是可膨胀的,同时可在框架11的顶部沿水平方向移动,并且至少一个 调整支撑装置20的膨胀和支撑装置20的水平运动量,以使其能够在使分割的顶板5倾斜的状态下在预定高度上支撑。版权所有(C)2004,JPO