    • 2. 发明专利
    • Prestressed concrete box girder incremental launching erection method
    • 预制混凝土搅拌机增长启动方法
    • JP2005264533A
    • 2005-09-29
    • JP2004077557
    • 2004-03-18
    • Taisei Corp大成建設株式会社
    • IGUMA YASUOHIGASHIDA NORIMASASHIRATANI KOJIHORIGUCHI MASAICHIINAHARA HIDEHIKOTSUKAMOTO ATSUSHI
    • E01D21/00E01D1/00E01D2/04
    • PROBLEM TO BE SOLVED: To provide a prestressed concrete box girder incremental launching erection method of excellent workability and economical efficiency by reducing prestressed concrete steel members discarded after only a short-term use, and reducing the weight of a prestressed concrete box girder in incremental launching erection without leaving unnecessary cables in the cross section of the prestressed concrete box girder when completed.
      SOLUTION: The prestressed concrete box girder incremental launching erection method comprises a prestressed concrete box girder construction process for forming a prestressed concrete box girder 10 by integrating at least two or more box girder members having internal spaces while loading tensile forces to the box girder members by inner steel members disposed in the member cross sections of the box girder members, and outer steel members disposed outside the member cross sections of the box girder members so as to almost equalize upper and lower compressive stresses of the box girder members; a prestressed concrete box girder extruding process for extruding the prestressed concrete box girder 10 constructed in the prestressed concrete box girder construction process from behind an abutment; and a cross beam placing process for closing a part of the internal space part of the box girder member on an intermediate fulcrum 3 to construct a cross beam.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过减少短期使用后弃置的预应力混凝土钢构件,提供预应力混凝土箱梁增量式起重安装方法,具有优异的可加工性和经济效益,减少了预应力混凝土箱梁的重量 在完成后,在预应力混凝土箱梁的横截面中不增加不必要的电缆的增量发射架设。 解决方案:预应力混凝土箱梁增量式起重安装方法包括预应力混凝土箱梁施工工艺,用于通过集成至少两个或多个具有内部空间的箱梁构件来形成预应力混凝土箱梁10,同时向箱体加载拉力 设置在箱梁构件的构件横截面中的内钢构件的梁构件和设置在箱梁构件的构件横截面外侧的外钢构件,以使箱梁构件的上下压缩应力几乎相等; 预应力混凝土箱梁挤压工艺,用于挤压预应力混凝土箱梁10,在预应力混凝土箱梁施工过程中由基台后面构成; 以及横梁放置过程,用于将中间支点3上的箱梁构件的内部空间部分的一部分闭合以构造横梁。 版权所有(C)2005,JPO&NCIPI
    • 3. 发明专利
    • Composite structure support
    • 复合结构支持
    • JP2005083136A
    • 2005-03-31
    • JP2003318745
    • 2003-09-10
    • Taisei Corp大成建設株式会社
    • HORIGUCHI MASAICHISHIRATANI KOJI
    • E01D19/02E04B1/30E04C3/36
    • PROBLEM TO BE SOLVED: To provide an inexpensive composite structure support composed of a reinforced concrete support and a corrugated steel plate superior in construction characteristics and toughness performance.
      SOLUTION: The composite structure support comprises a plurality of reinforced concrete supports 2 arranged by spacing, and a plurality of the corrugated steel plates 3 connected between the reinforced concrete supports 2 and 2. The corrugated steel plate 3 is constituted to be corrugated in an extension direction of the composite structure support 1, which arranges the reinforced concrete support 2 at a corner part.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种廉价的复合结构支撑件,其由钢筋混凝土支架和具有优异的结构特性和韧性性能的波纹钢板组成。 解决方案:复合结构支撑件包括多个以间隔布置的钢筋混凝土支撑件2和连接在钢筋混凝土支架2和2之间的多个波纹钢板3.波纹钢板3构成波纹状 在复合结构支撑件1的延伸方向上,其将钢筋混凝土支撑件2布置在拐角部分。 版权所有(C)2005,JPO&NCIPI
    • 4. 发明专利
    • Construction method of precast capital part and bridge pier capital part
    • 预算部分和桥梁资本部分的构造方法
    • JP2003328320A
    • 2003-11-19
    • JP2002140043
    • 2002-05-15
    • Taisei Corp大成建設株式会社
    • FUJIKURA SHUICHIIMAI YOSHIAKIHORIGUCHI MASAICHIINAHARA HIDEHIKO
    • E01D19/02E01D2/04E01D21/00E01D101/24
    • PROBLEM TO BE SOLVED: To provide a construction method of a precast capital part and a bridge pier capital part that can considerably shorten a construction period. SOLUTION: The precast capital part 10 is composed of a lower floor slab 12, an upper floor slab 11 and a web 13, and the lower floor slab 12 is provided with an opening part 14 which bridge pier main reinforcements 22 projecting from the head part of the bridge pier 20 penetrate. Reinforcement joint implements 15, 16 are embedded in the opening part side face of the lower floor slab 12, and the web 13. While the bridge pier main reinforcements 22 penetrate the opening part 14, the precast capital part 10 is installed at a bridge pier 20. Main reinforcements 18 and lateral reinforcements 31 are connected to the reinforcement joint implements 15, 16 for assembly, and concrete 50 is placed to integrate the bridge pier 20 and the precast capital part 10. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供可大大缩短施工期的预制资本部分和桥墩资本部分的施工方法。

      解决方案:预制件10由下层板坯12,上层板坯11和纤维网13组成,下层板坯12设有开口部分14,该开口部分将桥墩主加强件22从 桥墩20的头部穿透。 加固接头工具15,16嵌入在下层板坯12的开口部侧面和网状物13中。当桥墩主加固件22穿透开口部14时,预制件部10安装在桥墩处 20.主加强件18和侧向加强件31连接到用于组装的加强接头工具15,16上,并且混凝土50被放置成将桥墩20和预制资本部分10整合。(C)2004年, JPO

    • 5. 发明专利
    • BACKSTAY
    • JPH11343609A
    • 1999-12-14
    • JP15158998
    • 1998-06-01
    • TAISEI CORP
    • MIYAUCHI MASAMIHORIGUCHI MASAICHIMUKONO MOTOHARUOKADA HIROKI
    • E01D19/02E01D4/00E04G21/12
    • PROBLEM TO BE SOLVED: To provide a backstay easy in the construction and removal and having a high strength to shorten the construction period and to reduce the construction cost of an arch bridge. SOLUTION: This backstay is provided with a form 8 composed of a sheathing board 9 inclinedly bridged between the back of the end post 2 and an arch abutment 1, and of a timbering 10 for supporting the sheathing board, a plurality of precast blocks 11 continuously laid on the sheathing board 9, and PC steel twisted wires 12 made of PC steel extendedly stretched through inside the precast blocks 11 between the end post 2 and the arch abutment 1. The PC steel twisted wires 12 are arranged in such a way that the intermediate part of the PC steel twisted wires 12 is bridged on the arch abutment 1 and the end thereof is fixed to the end post 2. The adjoining surface of the precast block 11 to be adjoined on the adjacent other precast block 11 is formed so as to be meshed with the other precast block 11.
    • 10. 发明专利
    • CONSTRUCTION METHOD FOR COMPOSITE STRUCTURE PIER
    • JPH083926A
    • 1996-01-09
    • JP16621094
    • 1994-06-24
    • TAISEI CORP
    • IMAI YOSHIAKIITO YOSHIEHORIGUCHI MASAICHIMOCHIZUKI AKIHIKO
    • E01D19/02E01D2/00
    • PURPOSE:To shorten a construction period by connecting a steel pipe for post to the upper part of a steel pipe for rack buried in a foundation so as to lift and filling concrete into the steel pipe for post and connecting an area between the post steel pipes with a concrete wall. CONSTITUTION:Post steel pipes 1 are connected to the upper part of a rack steel pipe 3 buried in a foundation one after another, thereby lifting the steel pipes 1 where concrete is injected inside from the lower end of the steel pipe 1 and the steel pipes 1 are interconnected with a temporary binding structural member. Then, the head of a post is formed on the uppermost part of the steel pipe 1 and integrated with the steel pipes 1. Then, a gear of a scaffolding 6 is assembled with a rack of the steel pipes 1 and the scaffolding 6 is mounted alone the steel pipes so that it may rise freely. A reinforcement basket 5 is mounted between the steel pipes 1, using the scaffolding 6 and a rib of the steel pipes 1. A form 7 is assembled outside the reinforcement basket 5 where concrete is filled-up between the forms 7 and a spot between the steel pipes 1 is connected with a concrete wall 8. This construction makes it possible to minimize the number of high elevation work and reduce manpower required for reinforcing assembling work, and thereby shorten construction work.