会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • Built-up steel shell and tunnel enlarged part lining work
    • 建筑钢壳和隧道放大部分内衬工作
    • JP2004225386A
    • 2004-08-12
    • JP2003014863
    • 2003-01-23
    • Nippon Steel Corp新日本製鐵株式会社
    • SAWAISHI MASAMICHITAKEGAWA KEIGONISHIMOTO HIDETAKA
    • E21D13/00E21D11/04
    • PROBLEM TO BE SOLVED: To easily construct a wall body and lining for holding a space in a narrow construction site such as an underground space where a large-sized heavy machine cannot be used.
      SOLUTION: This built-up steel shell 9 is constructed by bolt-jointing (15) adjacent T-shaped steel plates 1 at joint pieces 3 provided at both end parts of T-flanges 1a toward the leg member 2 side, inserting a channel steel plate 4 between the end parts of the respective leg members 2 of the T-shaped steel plates 1, and bolt-jointing (15) the flanges 5 of the channel steel plates 4 on both sides while holding the end part of the leg member 2 of the T-shaped steel plate 1 in between to form a box-shaped space 6.
      COPYRIGHT: (C)2004,JPO&NCIPI
    • 要解决的问题:为了容易地构造一个用于在诸如不能使用大型重型机器的地下空间的狭窄施工现场中保持空间的墙体和衬里。 解决方案:该组合钢壳9通过在T形凸缘1a的两个端部处朝向腿部件2侧的接合件3上螺栓连接(15)相邻的T形钢板1而构成, 在T形钢板1的各个腿部件2的端部之间的通道钢板4和两侧的通道钢板4的凸缘5螺栓连接(15),同时保持 T形钢板1的腿部件2之间形成盒状空间6.版权所有(C)2004,JPO&NCIPI
    • 9. 发明专利
    • TEMPORARY POST FIXING METHOD AND DEVICE FOR ERECTING PLUG-IN TYPE POST
    • JPH10311046A
    • 1998-11-24
    • JP13450597
    • 1997-05-09
    • NIPPON STEEL CORPSHINYOU SANKEN KK
    • KOMON TAKESHITAKANO YOSHIHIROMUTAGUCHI SHINICHIFUKUMOTO TATSUYASAWAISHI MASAMICHIKIMURA SHINKICHI
    • E02D5/34E02D27/12E04G21/18
    • PROBLEM TO BE SOLVED: To temporarily fix a post within a steel pipe pile via the wedge action of male and female camber materials even in a small gap by applying the constitution that a temporary fixing device with the male camber material fitted into space between the thick plates of the female camber material having a rod material welded between the thick plates, is inserted in a gap between the internal surface of a steel pipe pile and the external surface of a post, and then the male camber material is hammered. SOLUTION: A female camber material 4 of a temporary fixing device has a rod material welded at the prescribed angle between two rectangular thick plates, and a guide pipe 3 is welded to the external surface of each thick plate. Furthermore, a male camber material 5 made of a square rod material of trapezoidal form or the like is fitted into and inserted into space between the thick plates of the female camber material 4. Then, a guide rod 7 is passed through the guide pipe 3. Also, the temporary fixing device is locked with stoppers 8 at the upper and lower positions of the guide rod 7, and inserted in a gap between a pile and a post in the steel pipe pile by use of the guide rod 7, thereby installing the temporary fixing device at the prescribed position in a gap between the steel pipe pile and the post. Thereafter, the upper surface of the male camber material 5 is driven with a hammer or the like, thereby fastening the post within the steel pipe pile via the wedge action of the male camber material 5 and the female camber material 4.