    • Construction of framework equipment for offshore assembling of large-size cell structure
    • 海洋大型结构细胞结构框架设备构造
    • JPS59192117A
    • 1984-10-31
    • JP6526983
    • 1983-04-15
    • Nippon Steel Corp
    • SHIRAISHI MOTOOUMIWA HIROYUKIMIYOSHI TAKEHISANAKANO IWAOYOSHIGA TOSHINARI
    • E02B17/00E02B17/02
    • E02B17/027E02B2017/0039
    • PURPOSE:To easily construct a guide framework equipment in a short time by a method in which a steel guide framework connected with large numbers of tubular columns is set on the ground of the seabed, support piles are thrust through each tubular column and driven into the ground, and the support piles are connected with the tubular columns. CONSTITUTION:Large numbers of tubular columns 6 are set at intervals on a circle and connected with each other through connectors 7, and an annular receiving seat 1 to support the lower ends of sheet piles for constituting a cell structure is set to form a steel guide framework 5. The guide framework 5 is delivered by a crane ship and set on the ground 3 of the seabed, support piles 4 are thrust through each tubular column 6 and driven into the support ground, and cement mortar is packed into the spaces between the tubular columns 6 and the support piles 4. Connecting frames and upper guide framework are orderly set on the guide framework 5 to assemble a cell structure.
    • 目的:通过将与大量管柱连接的钢导框架设置在海底的方法,在短时间内轻松构建引导框架设备,支撑桩通过每个管柱推入并驱动到 并且支撑桩与管状柱连接。 构成:大量的管状柱6以圆周间隔设置并通过连接器7彼此连接,并且设置用于支撑用于构成电池结构的板桩的下端的环形接收座1,以形成钢导轨 框架5.引导框架5由起重机船运送并设置在海床的地面3上,支撑桩4通过每个管柱6推动并被驱动进入支撑地面,水泥砂浆被包装在 管柱6和支撑桩4.连接框架和上引导框架有序地设置在引导框架5上以组装单元结构。