    • 2. 发明专利
    • Joint method of steel pipe pole and joint jig
    • 钢管接头联合方法
    • JP2007182731A
    • 2007-07-19
    • JP2006002562
    • 2006-01-10
    • Kajima CorpNippon Steel Corp新日本製鐵株式会社鹿島建設株式会社
    • OGIWARA YUKIMASASHINADA SHUJIFUJIMURA HIROSHITSUKAMOTO KIYOSHITAKI MASAYAFUKUMOTO TOSHIYUKIKUBOTA ATSUSHIMIYASAKA TATSUAZUMA SEIZABUROSAWAIZUMI SHINICHI
    • E04B1/24E04B1/58
    • PROBLEM TO BE SOLVED: To provide a joint method of a steel pipe column capable of easily and firmly connecting the lower end section of an upper column to the upper end section of a lower column with a bolted connection by utilizing joint plates for permanent installation and a drift pin as a temporary connection member and a joint jig.
      SOLUTION: The joint plate 4 having a bolt hole 4a in both inside and outside of the upper end section of the lower column 1 and a joint nut 6 connected to the bolt hole 4a and the joint plate 3 having a bolt hole 3a are respectively temporarily fixed with the drift pin 9. The lower end section of the upper column 2 is confronted with the upper end section of the lower column 1, and the upper end side of the joint plate 4 and the upper end side of the joint plate 3 are respectively accompanied by both inside and outside of the upper column 2. Further, a joint bolt 5 is inserted in the bolt hole 4a of the joint plate 4 from each bolt hole 3a of the joint plate 3, and the front end of the joint bolt 5 is screwed on the joint nut 6.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种钢管柱的接合方法,其能够通过利用接合板将接头板通过螺栓连接容易且牢固地连接到上柱的下端部与下部塔的上端部 永久安装和漂移销作为临时连接构件和接头夹具。 解决方案:具有在下柱1的上端部的内部和外部的螺栓孔4a的接合板4和连接到螺栓孔4a的接合螺母6和具有螺栓孔3a的接合板3 分别与漂移销9暂时固定。上柱2的下端部分与下柱1的上端部分接合,接头板4的上端侧和接头的上端侧 板3分别伴随着上柱2的内部和外部。此外,接头螺栓5从接合板3的每个螺栓孔3a插入接头板4的螺栓孔4a中,并且前端 关节螺栓5拧在接头螺母6上。版权所有(C)2007,JPO&INPIT
    • 3. 发明专利
    • Junction structure of precast members and cap for mechanical joint unit injection used therefor
    • 预制构件的结构结构和用于其的机械接头单元注入
    • JP2014105440A
    • 2014-06-09
    • JP2012257191
    • 2012-11-26
    • Kajima Corp鹿島建設株式会社
    • OKAMOTO KENJINABESHIMA TAKEHIKOOGIWARA YUKIMASASHINBASHI MASAHIROMATSUI MORIFUSA
    • E04B1/21E04C5/18
    • PROBLEM TO BE SOLVED: To provide a cap for mechanical joint unit injection with which construction efficiency is significantly improved by rotating a nut, any labor is not required for mounting adjustment since the cap is compressed and deformed by contact with a PC member, injection can be performed by a manual injector and divided injection can also be performed.SOLUTION: A junction structure of precast members includes a first precast member 1, a second precast member 2 in which a sleeve 23 for a joint is buried, a cap 14 closing an opening of the sleeve (joint) 23, and a sleeve joint filler 4 filling the inside of the sleeve (joint) 23. A joint part between a concrete part 11 of the first precast member 1 and a concrete part 21 of the second precast member 2 is filled with a joint filler 5. The cap 14 is formed from a flexible member which is compressed and deformed by contact with the precast members, mounted to a joint bar 13 protruding from the concrete part of the first precast member 2, and is positioned in the joint filler 5.
    • 要解决的问题:为了提供用于机械接头单元喷射的盖,通过旋转螺母来显着改善施工效率,由于盖通过与PC构件的接触而被压缩和变形,因此安装调整不需要任何劳动,注射罐 也可以通过手动喷射器执行分割喷射。解决方案:预制构件的连接结构包括第一预制构件1,第二预制构件2,其中埋设有用于接头的套筒23,盖14关闭 套筒(接头)23的开口以及填充套筒(接头)23内部的套筒接合填料4.第一预制构件1的混凝土部件11与第二预制构件的混凝土部件21之间的接合部分 盖14由接合填料5填充。盖14由柔性构件形成,该柔性构件通过与预制构件接触而被压缩和变形,安装到从第一预制件的混凝土部分突出的接头杆13 构件2,并且定位在接头填料5中。
    • 6. 发明专利
    • Column/beam connection structure
    • 柱/梁连接结构
    • JP2006291531A
    • 2006-10-26
    • JP2005111919
    • 2005-04-08
    • Kajima Corp鹿島建設株式会社
    • FUJIMURA HIROSHIOGIWARA YUKIMASATSUKAMOTO KIYOSHIFUKUMOTO TOSHIYUKIOTSUKA KATSUMITAKI MASAYAMIYASAKA TATSUKUBOTA ATSUSHIKOJIMA KAZUOYAJIMA KAZUMIFUNATSU YUJIASAKUSA YOSHIKAZU
    • E04B1/58E04B1/24
    • PROBLEM TO BE SOLVED: To provide a column/beam connection structure capable of efficiently connecting both up and down columns and the beam-column in the same position. SOLUTION: The columns 1 and the column 2 arranged on up and down and the columns 1 and 2 are connected to the beams 3 and 3 arranged to the side sections. Vertical joints 4 and 5 and a horizontal joint 6 are respectively projected to the end sections of the columns 1 and 2. Connection plates 7 and 8 are respectively attached to both sides of the vertical joints 4 and 4 and vertical joints 5 and 5 of the columns 1 and 2. The vertical joints 4 and each connection plate 7 are clamped with a plurality of connection bolts 9, and the vertical joints 5 and each connection plate 8 are clamped with a plurality of connection bolts 10. The end sections of both up and down flanges 3a of the beams 3 are connected to the horizontal joint 6 with a connecting plate 11 and a plurality of connection bolts 13, and the end sections of webs 3b are connected to the vertical joints 4 with a connection plates 12 and a plurality of connection bolts 14. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供能够在相同位置有效地连接上下列和梁柱的柱/梁连接结构。 解决方案:布置在上下的列1和列2以及列1和2与连接到侧部的梁3和3连接。 垂直接头4和5以及水平接头6分别突出到列1和2的端部。连接板7和8分别安装在垂直接头4和4的两侧以及垂直接头4和5的垂直接头5和5 第1列和第2列。垂直接头4和每个连接板7用多个连接螺栓9夹紧,并且垂直接头5和每个连接板8用多个连接螺栓10夹紧。两个端部 梁3的下凸缘3a与连接板11和多个连接螺栓13连接到水平接头6,并且腹板3b的端部通过连接板12和多个连接到垂直接头4 的连接螺栓14.版权所有(C)2007,JPO&INPIT
    • 7. 发明专利
    • Steel-concrete composite beam and its construction method
    • 钢 - 混凝土复合梁及其施工方法
    • JP2006169826A
    • 2006-06-29
    • JP2004364151
    • 2004-12-16
    • Kajima Corp鹿島建設株式会社
    • MIYASAKA TATSUOGIWARA YUKIMASAFUKUMOTO TOSHIYUKIFUJIMURA HIROSHITSUKAMOTO KIYOSHIYOSHIGAI SHIGERUSASAKI KATSUYASUTAKI MASAYA
    • E04B1/30E04B1/16E04C3/293E04G9/00
    • PROBLEM TO BE SOLVED: To provide a steel-concrete composite beam and its construction method attaining energy saving, cost reduction, and the like in various construction works such as steel work, form work, reinforcement work and temporary work.
      SOLUTION: The steel-concrete composite beam is formed of a steel frame section 2 located at the lower end of a beam cross section, and a reinforced concrete section 3 located on the upper side of the steel frame section 2. The steel frame section 2 is formed of a steel plate 2 continuous in the axial direction of the beam, and a plurality of studs 2b projected into the reinforced concrete section 3 from the upper face of the steel plate 2a. In construction, the steel plate 2a with the studs is laid as a bottom form, and side forms 8, 8 are arranged on both sides to form a beam form constituted in U-shape cross section opened at the upper face. Upper end main reinforcements 3a, lower end main reinforcements 3b and shear reinforcing bars 3c are arranged in reinforcing cage shape of rectangular cross section in the beam form. Concrete is then placed, and the side forms 8, 8 are removed when the concrete is hardened.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供钢铁混凝土复合梁及其施工方法,如钢铁工作,工作,加固工作和临时工等各种施工工程中节能降耗等。 钢结构复合梁由位于梁截面下端的钢框架部分2和位于钢框架部分2上侧的钢筋混凝土部分3形成。钢 框架部分2由在梁的轴向方向上连续的钢板2和从钢板2a的上表面突出到钢筋混凝土部分3中的多个螺柱2b形成。 在结构上,具有螺柱的钢板2a被放置成底部形状,并且在两侧上布置侧面形状8,8,以形成在上表面处开口的U形横截面形成的梁形。 上端主加强件3a,下端主加强件3b和剪力钢筋3c以梁形式布置成矩形截面的加强笼形。 然后放置混凝土,当混凝土硬化时,侧面8,8被去除。 版权所有(C)2006,JPO&NCIPI
    • 8. 发明专利
    • Beam member of rc structure
    • 梁结构的梁构件
    • JP2005155058A
    • 2005-06-16
    • JP2003391876
    • 2003-11-21
    • Kajima Corp鹿島建設株式会社
    • FUKADA YOSHIOOGIWARA YUKIMASAMARUTA MAKOTOTAKATANI SHINJI
    • E04B1/21E04B1/58
    • PROBLEM TO BE SOLVED: To provide a beam member of an RC structure in the vicinity of a column-beam joining part capable of freely forming a plastic hinge formed in a beam end part near the center of beams in a big earthquake.
      SOLUTION: This beam member of the RC structure is constituted so that a plurality of joining reinforcements 3 and 3 are horizontally arranged in a connection part A of a column 1 by horizontally penetrating through this connection part A; a plurality of sleeves 4 and 4 are horizontally arranged in both end parts 3a and 3a of these joining reinforcements 3 as a steel pipe inside filling type joint; and main reinforcements 5 and 5 of the beams 2 and 2 and the joining reinforcements 3 and 3 are respectively joined via these sleeves 4 and 4. The sleeves 4 and 4 are respectively horizontally projected to both sides of the connection part A by the predetermined length L. A plurality of stirrup reinforcements 6 are wound between the sleeves 4 and 4 as shearing reinforcing bars, and are arranged at a predetermined interval in the axial direction of the sleeves 4.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种RC结构的梁构件,其能够在大地震中在梁的中心附近形成在梁端部中的自由形成塑料铰链的柱梁接合部附近。 解决方案:RC结构的梁构件被构造成使得多个连接加强件3和3通过水平地穿过该连接部分A而水平地布置在塔1的连接部分A中; 多个套筒4和4水平地布置在作为钢管内填充型接头的这些接合加强件3的两个端部3a和3a中; 梁2和2的主加强件5和5以及连接加强件3和3分别通过这些套筒4和4接合。套筒4和4分别水平地突出到连接部分A的两侧预定长度 多个镫形加强件6在套筒4和4之间缠绕作为剪切钢筋,并且以套筒4的轴向方向以预定的间隔布置。(C)2005年,JPO和NCIPI
    • 9. 发明专利
    • Beam-column joint structure of building having composite structure
    • 具有复合结构的建筑物的梁柱结构
    • JP2003313951A
    • 2003-11-06
    • JP2002126002
    • 2002-04-26
    • Kajima Corp鹿島建設株式会社
    • FUKUMOTO TOSHIYUKIOGIWARA YUKIMASATSUKAMOTO KIYOSHIKAWAHARA SHINJIKAWABATA NOBUHIROKUBOTA ATSUSHIHONMA KANSUKE
    • E04B1/30E04B1/58
    • PROBLEM TO BE SOLVED: To provide a beam-column joint structure of a building having a composite structure, which brings about labor savings in site work and a reduction in construction period by saving labor for site welding, and clarifies stress analysis for a joint so as to enable the rational design of the joint, by smoothing stress transfer between a column and a beam.
      SOLUTION: The column 2 having a concrete filled tubular steel (CFT) structure are arranged on the upside and downside of a joint metal 1, respectively. A plurality of jointing reinforcements 3 are arranged between the joint metal 1 and the upper and lower columns 2 and 2 by being vertically passed through the joint metal 1. The joint metal 1 is formed of upper and lower diaphragms 1a and 1a which are installed by being horizontally passed through a joint A at a prescribed interval in a vertical direction, panel metals 1b which are installed between the diaphragms 1a and 1a, and joint plates 1c which are protrusively provided in respective side parts of the panel metals 1b. The inside of the panel metal 1b of the joint metal 1 and the insides of steel pipes 2a and 2a of the columns 2 and 2 are continuously filled with concrete 4. H-shaped steel beam are joined to side parts of the joint metal 1 as the beams 5 having a steel structure, respectively.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种具有复合结构的建筑物的梁柱接头结构,其通过节省现场焊接的劳动力而节省现场工作的劳动力并减少施工周期,并且对应力分析进行澄清 通过平滑柱和梁之间的应力传递来实现关节的合理设计。 解决方案:具有混凝土填充管状钢(CFT)结构的柱2分别布置在接头金属1的上侧和下侧。 通过垂直通过接头金属1,在接头金属1和上下柱2和2之间布置有多个接合加强件3.接头金属1由上下隔膜1a和1a形成,该隔膜1a和1a由 在垂直方向上以规定的间隔水平穿过接头A,安装在隔膜1a和1a之间的镶板金属1b和突出地设置在面板金属1b的各个侧部中的接合板1c。 接头金属1的面板金属1b的内部和列2和2的钢管2a和2a的内部连续地填充混凝土4.H形钢梁与接头金属1的侧部接合为 梁5分别具有钢结构。 版权所有(C)2004,JPO
    • 10. 发明专利
    • New/old building integrated building-movement method
    • 新建/旧建筑一体化建筑运动方法
    • JP2013092006A
    • 2013-05-16
    • JP2011235806
    • 2011-10-27
    • Kajima Corp鹿島建設株式会社
    • OZAKI NOBUHIROOGIWARA YUKIMASATADA MITSUOSEKO NOBUYUKIISOBE TOSHIKAZUYAMAMOTO SHIGEAKI
    • E04G23/06E04G23/02
    • PROBLEM TO BE SOLVED: To reduce processes and costs by reducing the temporary reinforcement for overturn prevention and temporary reinforcement during movement of a storage external wall on the premise of moving(building-moving) the storage external wall in order to use the external wall of an existing building as a part of the external wall of a new building.SOLUTION: The skeleton construction of a new building is performed at a plane position prior to the movement of a storage external wall 1, and before the storage external wall 1 is moved, the storage external wall 1 is integrated with a structure frame 2 of the new building, and the storage external wall 1 and the structure frame 2 of the new building are simultaneously moved to the position of the new building by a building-movement method, and the structure frame 2 of the new building is integrated with a foundation.
    • 要解决的问题:为了在存储外墙移动(建筑物移动)的前提下,通过减少防止翻倒的临时加固和临时加固来减少工艺和成本,以便使用 现有建筑物的外墙作为新建筑外墙的一部分。 解决方案:新建筑物的骨架结构在存储外壁1移动之前的平面位置进行,并且在存储外壁1移动之前,存储外壁1与结构框架 2新建筑物,新建筑物的储存外墙1和结构框架2通过建筑物移动方式同时移动到新建筑物的位置,新建筑物的结构框架2与 一个基础 版权所有(C)2013,JPO&INPIT