会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • New/old building integrated building-movement method
    • 新建/旧建筑一体化建筑运动方法
    • JP2013092006A
    • 2013-05-16
    • JP2011235806
    • 2011-10-27
    • Kajima Corp鹿島建設株式会社
    • OZAKI NOBUHIROOGIWARA YUKIMASATADA MITSUOSEKO NOBUYUKIISOBE TOSHIKAZUYAMAMOTO SHIGEAKI
    • E04G23/06E04G23/02
    • PROBLEM TO BE SOLVED: To reduce processes and costs by reducing the temporary reinforcement for overturn prevention and temporary reinforcement during movement of a storage external wall on the premise of moving(building-moving) the storage external wall in order to use the external wall of an existing building as a part of the external wall of a new building.SOLUTION: The skeleton construction of a new building is performed at a plane position prior to the movement of a storage external wall 1, and before the storage external wall 1 is moved, the storage external wall 1 is integrated with a structure frame 2 of the new building, and the storage external wall 1 and the structure frame 2 of the new building are simultaneously moved to the position of the new building by a building-movement method, and the structure frame 2 of the new building is integrated with a foundation.
    • 要解决的问题:为了在存储外墙移动(建筑物移动)的前提下,通过减少防止翻倒的临时加固和临时加固来减少工艺和成本,以便使用 现有建筑物的外墙作为新建筑外墙的一部分。 解决方案:新建筑物的骨架结构在存储外壁1移动之前的平面位置进行,并且在存储外壁1移动之前,存储外壁1与结构框架 2新建筑物,新建筑物的储存外墙1和结构框架2通过建筑物移动方式同时移动到新建筑物的位置,新建筑物的结构框架2与 一个基础 版权所有(C)2013,JPO&INPIT