热词
    • 1. 发明专利
    • Segment for tunnel
    • 隧道分段
    • JP2010242307A
    • 2010-10-28
    • JP2009088968
    • 2009-04-01
    • Kajima Corp鹿島建設株式会社
    • FURUICHI KOSUKEARAI TAKAHIROTAKIMOTO KUNIHIKOSUZUKI YOSHINOBU
    • E21D11/08E21D11/04E21D11/38
    • PROBLEM TO BE SOLVED: To provide a segment for a tunnel, which can prevent an increase in a repairing portion of a segment body by preventing a temperature rise to the great depth of the segment body, when the temperature of the inside of the tunnel becomes high due to fire etc.
      SOLUTION: The segment for the tunnel is provided with a holding member 11 in which an inside space serving as a hole is formed. A ceramic lid member 20 is attached to the holding member 11. A space filler 23 is provided in the inside space of the holding member 11. The transfer of heat, which is associated with the convection of air in the inside space of the holding member 11, is suppressed with the space filler 23.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供一种用于隧道的段,其可以通过防止温度升高到节段主体的大深度来防止段体的修复部分的增加,当内部的温度 隧道由于火等而变高。解决方案:隧道段设有保持构件11,其中形成有用作孔的内部空间。 陶瓷盖构件20附接到保持构件11.在保持构件11的内部空间中设置有空隙填充物23.与保持构件的内部空间中的空气对流相关联的热传递 11,被空间填充物23抑制。版权所有(C)2011,JPO&INPIT
    • 3. 发明专利
    • Joint structure between rings of segment
    • 分支环之间的联合结构
    • JP2008169612A
    • 2008-07-24
    • JP2007003544
    • 2007-01-11
    • Geostr CorpKajima Corpジオスター株式会社鹿島建設株式会社
    • SUZUKI YOSHINOBUARAI TAKAHIROSAITO YUSUKEFUJINO YUTAKASAKUMA YASUSHIYOKOI NOBUAKIONOE SATOSHI
    • E21D11/04
    • PROBLEM TO BE SOLVED: To provide a joint structure between rings of a segment capable of reducing the number of joint hardware arranged on a joint surface between the rings to reduce cost and provided with a mortise requiring no special reinforcing bar for reinforcement.
      SOLUTION: This joint structure 1 divides the performance for sharing load in such a way that the joint hardware 4 shares tensile performance and a partial mortise 3 shares shearing performance. The tensile performance is the performance required at assembly time and demanding only aseismatic performance to reduce the number of joint hardware 4 partially and achieve economical joint structure. A shearing key having a gentle angle of the partial mortise 3 is provided in the vicinity of the center of height of the segment to reduce the number of reinforcing bars to cope with occurrence of crack.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提供能够减少布置在环之间的接合表面上的接合硬件的数量的节段的环之间的接合结构,以降低成本并提供不需要用于加强的特殊钢筋的榫眼。 解决方案:该联合结构1以共同的硬件4共享拉伸性能和部分榫眼3份剪切性能的方式分割负载的性能。 拉伸性能是组装时所需的性能,并且仅要求抗震性能,部分地减少接头硬件4的数量并实现经济的接头结构。 在片段的高度中心附近设置具有部分榫眼3的平缓角度的剪切键,以减少钢筋的数量以应对裂纹的发生。 版权所有(C)2008,JPO&INPIT
    • 8. 发明专利
    • Surface leveling apparatus and leveling method
    • 表面水平设备和水平方法
    • JP2007321397A
    • 2007-12-13
    • JP2006151326
    • 2006-05-31
    • Kajima Corp鹿島建設株式会社
    • SUZUKI YOSHINOBUFURUICHI KOSUKESHIRAI SHUNSUKETAKIZAWA SEIICHIRONAGAMORI KUNIHIROYAMAJI NOBUYA
    • E21D11/10
    • PROBLEM TO BE SOLVED: To provide a leveling apparatus which is simple in structure and automates leveling work of a covering material.
      SOLUTION: There is constructed a tunnel 4 in the natural ground 3, and a surface of the tunnel 4 is covered with an inner wall 5. The tunnel 4 has a floor slab 7 arranged therein, on which the surface leveling apparatus 1 is arranged. The surface leveling apparatus 1 has a main body 9 which has arched rails 11a, 11b on an upper portion thereof. The rails 11a, 11b have arranged thereon the leveling device 13 having a roller, and a spray device 15 in a manner movable in directions B1, B2. When the covering material is arranged on the inner wall 5, the spray device 15 moves on the rails 11a, 11b in the directions B1, B2 while spraying the covering material into a gap between the inner wall 5 and the roller, and the leveling device 13 levels the covering material by moving on the rails 11a, 11b in the directions B1, B2 with the rollers kept rolling, to thereby apply the covering material to the inner wall 5.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种结构简单并使覆盖材料的整平工作自动化的整平装置。

      解决方案:在自然地面3中构造隧道4,隧道4的表面被内壁5覆盖。隧道4具有布置在其中的楼板7,表面调平装置1 被安排。 表面整平装置1具有在其上部具有拱形轨道11a,11b的主体9。 轨道11a,11b在其上布置有具有辊的调平装置13和以可移动方向B1,B2的方式的喷射装置15。 当覆盖材料布置在内壁5上时,喷射装置15沿着方向B1,B2在轨道11a,11b上移动,同时将覆盖材料喷射到内壁5和辊之间的间隙中,并且调平装置 13通过在滚筒保持滚动的方向上在轨道11a,11b上沿着方向B1,B2移动来覆盖覆盖材料,从而将覆盖材料施加到内壁5.版权所有(C)2008,JPO&INPIT

    • 9. 发明专利
    • Composite segment
    • 复合材料
    • JP2007270485A
    • 2007-10-18
    • JP2006096587
    • 2006-03-31
    • Ishikawajima Constr Materials Co LtdKajima Corp石川島建材工業株式会社鹿島建設株式会社
    • OZEKI MUNETAKAHASHIMOTO HIROHIDEHOSHI HIDENORIMINEZAKI AKIHIRONAKAGAWA MASAYOSHISUZUKI YOSHINOBUTAMADA KOICHIKUWABARA YASUYUKIARAI TAKAHIROHONDA TOMOAKIFURUICHI KOSUKE
    • E21D11/04E21D11/08
    • PROBLEM TO BE SOLVED: To provide a composite segment which is small in steel usage, low in cost, thin in thickness, high in strength, and can have a wider width. SOLUTION: The synthetic segment 1 is formed like an arcuate slab by filling concrete 3 into a gap between a pair of steel skin plates 2a, 2b arranged on two surfaces on a natural ground side and the inner space side of a tunnel. The skin plates 2a, 2b are provided with arcuate joint plates (inter-ring joint plates) 4a, 4b, linear joint plates, and a plurality of dowels 6. The arcuate joint plates 4a or 4b have their base ends fixed along tunnel axial edges of the skin plate 2a or 2b and their tips extended toward the skin plate 2b or 2a opposed to the same. The linear joint plates have their base ends fixed along tunnel circumferential edges of the skin plate 2a or 2b and their tips extended toward the skin plate 2b or 2a opposed to the same. The dowels 6 are fixed to the skin plates 2a or 2b and protruded to the skin plates 2b or 2a opposed to the same. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提供一种钢的使用量小,成本低,厚度薄,强度高,并且可以具有更宽的宽度的复合段。 解决方案:通过将混凝土3填充在布置在自然地面的两个表面上的一对钢皮板2a,2b和隧道的内部空间侧之间的间隙中,合成段1形成为弧形板。 皮板2a,2b设置有弓形接头板(环形接合板)4a,4b,直线接头板和多个榫钉6.弓形接头板4a或4b的基端部沿隧道轴向边缘固定 的皮肤板2a或2b,并且它们的尖端延伸到与其相对的皮肤板2b或2a。 直线接头板的基端部沿着皮肤板2a或2b的隧道周缘固定,并且其端部朝向与其相对的皮肤板2b或2a延伸。 定位销6固定在皮肤板2a或2b上并突出到与其相对的皮肤板2b或2a上。 版权所有(C)2008,JPO&INPIT
    • 10. 发明专利
    • Pipeline connecting structure and connecting method
    • 管道连接结构与连接方法
    • JP2007113752A
    • 2007-05-10
    • JP2005308196
    • 2005-10-24
    • Kajima Corp鹿島建設株式会社
    • SUZUKI YOSHINOBUOKUYAMA YOSHIHIDEUMEKI TOSHIAKIWADA AKIHISA
    • F16L1/024E03F3/04F16L41/08
    • PROBLEM TO BE SOLVED: To provide a pipeline connecting structure and connecting method that can follow ground deformation while ensuring cut-off performance at a low cost. SOLUTION: The connecting structure 1 has an existing pipe 4 constructed in the ground 2, and a socket pipe 3 serving as a connection part is connected to the side face of the existing pipe 4 by welding or the like. A boring pipe 5 is fitted to the socket pipe 3, and one end of the boring pipe 5 is exposed onto the ground. The existing pipe 4 is a sewer pipe, for instance, and the boring pipe 5 is a rainwater pipe. Further, since sealing materials 7a, 7b, 7c are provided between the socket pipe 3 and the boring pipe 5, infiltration of underground water into the connecting structure 1 can be prevented even when the ground 2 deforms due to an earthquake, ground subsidence, or the like. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种可以跟随地面变形的管道连接结构和连接方法,同时以低成本确保截止性能。 解决方案:连接结构1具有构造在地面2中的现有管4,并且用作连接部的插座管3通过焊接等连接到现有管4的侧面。 镗管5装配到插座管3上,并且镗管5的一端暴露在地面上。 现有的管道4是例如下水道管,镗管5是雨水管。 此外,由于在插座管3和镗孔5之间设置密封材料7a,7b,7c,所以即使当地面2由于地震,地面沉降或地面沉降而变形时,也可以防止地下水渗透到连接结构1中 类似。 版权所有(C)2007,JPO&INPIT