会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • METHOD FOR PREHEATING IMMERSION NOZZLE FOR CONTINUOUS CASTING
    • JP2000317626A
    • 2000-11-21
    • JP13113599
    • 1999-05-12
    • NIPPON STEEL CORP
    • OTSUKA YOSHIAKINAKAYAMA TOSHIO
    • B22D11/10B22D41/60
    • PROBLEM TO BE SOLVED: To prevent the damage of a nozzle inner hole body without developing the positive pressure in a slit by executing a second preheating while supplying inert gas after executing a first preheating in a specified time under the atmospheric opening state of a gas supplying tube communicated with the slit part of the nozzle. SOLUTION: The inert gas such as Ar introduced from the metal-made screwed gas supplying tube 1, is supplied through the gas blowing slit 3 into the refractory-made inner hole body 4 arranged on the inner wall of the nozzle refractory 2 made of alumina-graphite, etc., and gas film is formed on the inner wall of the nozzle to protect the nozzle from passed molten steel by turning to a non-contacting state. In this gas blowing type immersion nozzle for continuous casting, before casting, this nozzle refractory 2 is preheated to prevent the spalling. At this time, the gas supplying tube 1 is opened to the outer part of the atmosphere or reduced in the pressure, and preheated at 400-600 deg.C by (t) min shown with 0.357A =1100 deg.C while supplying the inert gas.
    • 5. 发明专利
    • TUNDISH FOR CONTINUOUS CASTING
    • JPH0938753A
    • 1997-02-10
    • JP21127195
    • 1995-07-28
    • NIPPON STEEL CORP
    • HIROKAWA YUICHIKIMURA KOHEIOTSUKA YOSHIAKIKASHIO SHIGEKIENDO KOICHI
    • B22D43/00B22D11/10
    • PROBLEM TO BE SOLVED: To remove inclusion flowed in accompanied with molten steel from a molten steel supplying nozzle by forming molten steel flowing passage arranging panel-like weir having size satisfying a specific condition as a zigzag state in a tundish for continuous casting. SOLUTION: In the tundish 2 for continuous casting arranging wide lower weirs 1 having flat upper surface in the width direction between the molten steel supplying nozzle 5 for supplying the molten steel from the upper part and a molten steel ejecting nozzle 3 arranged at the bottom part, the panel-like weirs 4 are arranged on the wide lower weirs 1 as the zigzag state in the width direction of the wide lower weirs 1 so that the width length of the panel-like weir 4 becomes 0.5-0.7 times of the width length of the wide lower weir 1 and the height of the panel-like weir 4 becomes 0.4-0.8 times of the height of the wide lower weir 1 to form the molten steel flowing passage. In this result, the inclusion flowed in accompanied with the molten steel from the molten steel supplying nozzle 5 can surely be flowed up and removed in the suitable productivity.